SAGAR S. SHAH B.E.(Civil) M.l.E.,F.l.V. Cell : 9422247125 F -27433 E-mail : er.sagarshah@gmail.com o Approved Valuer o Gonsulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OO5 FORM.2 ENGI NEER'S CERT!FICATE Date: 12th December, 2018 To, Shri Naryan Labhu Sarode Plot No.9, Pandurang Niwas, Sinhastha Nagar, Bhadrapad Sector, CIDCO, Nashik - 422OOg Subiect: Certificate of Cost lncurred for development of Sarode Sankul situated on the plot No. 37 to 40 bearing Survey No. 55/1/8 demarcated by its boundaries Adj. gut No. 55/1 Part to the North, Plot No. 36 to the South, 12 Meter Wide Road to the East, Ptot No. 41 to 47 to the West of Division Nashik, Village Chunchale, Taluka Nashik, District Nashik, PIN - 422010 admeasuring 843 Sq. Mtrs. Area being developed by Shri Narayan Labhu Sarode. Ref: MAHARERA Registration Number Sir, l, Er. Sagar Shailesh Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being 1 Building named Sarode Sankul situated on the Plot No. 37 to 40 bearing Survey No. 55/1/8 of Division Nashik, Village Chunchale, Taluka Nashik, District Nashik, PIN - 422010 admeasuring 843 Sq. Mtrs. Area being developed by Shri Narayan Labhu Sarode. 1. Following technical professionals are appointed by owner / promoter:- (i) Shri Vinayak K. Patil as Licensed Engineer; (ii) Shri Shirish Ner as Structural Consultant 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by_pv.g]gper/ rabour and other',}ffi$$-qE :::ff::. li :l: .H:::::".1::l::^,':::. ::,:""riar, developer, and the site inspection carried out by us. jt' . 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 59,75,000. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at NlL. The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated cost. 5' The balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated at Rs. 59,75,000 (Totalof table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below. TABLE - A 1 Building called Sarode Sankul Sr. No. Particulars Amounts Total Estimated cost of the building as on L2/I2/ZOL9 date of L Registration is { 59,75,000 Cost incurred as on 72/12/2078 2 NIL (based on the Estimated cost) 3 Work done in Percentage (as Percentage of the estimated cost) o% 4 Balance Cost to be lncurred (Based on Estimated Cost) { 59,75,000 Cost lncurred on Additional I Extra ltems as on I2/IZ/IOLS not 5 Ntt included in the Estimated Cost (Annexure A) TABLE - B 1 Building called Sarode Sankul Sr. No. Particulars Amounts Total Estimated cost of the lnternal and External Development L Works including amenities and Facilities in the layout as on NIL 12/72/2OL8 date of Registration is 2 Cost incurred as on tzlLz/zlLg (based on the Estimated cost) NIL 3 Work done in Percentage (as Percentage of the estimated cost) NIL 4 Balance Cost to be lncurred (Based on Estimated Cost) NIL Cost lncurred on Additional / Extra ltems as on 12h2/2OL8 not 5 NIL included in the Estimated Cost (Annexure A) Yours Faithfully ,i !. : ! ER. SAGAR S. SHAH .I ,. * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra /Additional ltems executed with Cost (Which were not parts of the original Estimate of Total Cost) NIL