Vinayak K.Patil & Associates Oflice Add : Bl4, Sharmila Socitey Old Gangapur Naka Nashik fORM 1 ARCHITECT'S CERTIFICAIE Date: 2oth luly, 2019 To, Shri Naryan Labhu Sarode Plot No.9, Pandurant Niwas, Sinhastha Nagar, Bhadrapad Sector, CIDCO, Nashik - 422009 Subjed: Certificate of Percentage of Completaon of Construction Work of Sarode Sankul situated on the Plot No. 37 to 40 bearing Survey No. 55/1/B demarcated by its boundarie5 Adj. gut No. 55/1 Part to the North, plot No. 36 to the South, t2 Meter Wide Road to the Ea5t, Plot No, 41 to 47 to the West of Division Nashik, VillaBe Chunchale, Taluka Nashik, District Nashik, PIN - 422010 admeasuring 843 Sq. Mtrs. Area bein8 developed by Shri Narayan Labhu Sarode. 5ir, l, Ar. Vinayak (. Patil has undertaken assitnment as Architect of certifying percentage of Completion of Construction Work of the Sarode Sankul Building situated on the plot No. 37 to 40 bearing Survey No.55/1/B of Division Nashik, Village Chunchale, Taluka Nashik, District Nashik, PIN - 422010 admeasurinB 843 Sq, Mtrs. Area being developed by Sh.i Narayan Labhu Sarode. 1. Following technical professionals are appointed by Owner / promoter:- (i) Shri Vinayak K. Patil as Architectj (ii) Shri Shirish Ner as Structural Consultant Based on Site lnspection, with respect to the Building of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for the building of the Real Estate Project as registered vide number p516ooo1g93o under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Table A Sr. No Tasks / Activity Peraentage 1 Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 0 5 1 number of Slabs of 5uper Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 100 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical FittinSs within the 100 Flat / Premises, 8 Staircases, tifts Wells and Lobbies at each tloor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with waterproofing of the Building / wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / cRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 100 appurtenant to Building/ Wing, Compound Wall and all other .equirements as may be required to obtain Occupation Completion/ Certificate. t N TABLE -B lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 Applied to NMC 3 Sewerage (Chamber, Lines, Septic Yes 0 Only Septic Tank Done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street tighting No 0 NA 1 Community Buildings No 0 NA 8 Treatment and Disposal of 0 No NA Sewage and Salvage Water 9 Solid Waste Management and No 0 Disposal 10 Water Conservation and Rain Only Rain Water Harvesting Yes 0 Water Harvesting Done 11 Energy Management No 0 NA -12 Fire protection and Fire Safety 0 Requirements No NA 13 Electrical Meter Room, Sub- No separate room for Station, Receiving Station Yes 0 ElectricalMeter Yours Faithfully ,l- AR. VINAYA( K. PATII ss'.