SAGAR S. SHAH B.E.(Civil) M.l.E.,F.l.V. Cell : 9422247125 F -27433 E-mail : er.sagarshah@gmai!.com o Approved Valuer o Gonsulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OO5 FORM - 2 ENG!NEER'S CERTIFICATE Date: t2l08l2020 To, Matoshri Buildcon L10, The Presidency Old Agra Road GadkariChowk Nashik - 422002 Subject: Certificate of Cost lncurred for Development of Mahalaxmi Towers for Construction Work of 1 Building situated on the Plot No. 15 bearing Gut No. 305 demarcated by its boundaries (latitude and longitude of the end points) Plot No. 14 to the North, Plot No. 16 to the South, Adj. G.No. 304(P) to the East, 12 Meter Wide Road to the West of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring 1588.00 Sq. Mtrs. Area being developed by M/S. MATOSHRI BUILDCON. Ref: MAHARERA Registration Number P51600018172. Sir, l, Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project registered under RERA, being 1 Building named Mahalaxmi Towers, situated on situated on the Plot No. 15 bearing Gut No. 305 of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring L588.00 Sq. Mtrs. Area being developed by M/S. MATOSHRI BUILDCON. Following technical professionals are appointed by Owner / Promoter:- (i) Mr. Ashok S. Wagh as Licenced Engineer; (ii) Bhavesh Patel as Structural Consultant L. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the / project. Our estimated cost calculations are based on the Drawings plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out byus. !i \ \ <\rt- .iY 2. We estimate Total Estimated Cost of completion of the building MAHALAXMI TOWERS of the aforesaid project under reference as { 5,68,75,000. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Apartment being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred till date is calculated at T 5,68,75,000. The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civi!, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated at NlL. 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below. TABLE - A MAHATAXMITOWERS Sr. No. Particulars Amounts I Total Estimated cost of the building/wing as on O1,/LO/20L8 { 5,69,75,000 2 Cost lncurred as on LZlO8l2O20 (based on the Estimated cost) { 5,68,7s,000 3 Work done in Percentage (as Percentage of the estimated cost) too% 4 Balance Cost to be lncurred (Based on Estimated Cost) N!L Cost lncurred on Additional/ Extra ltems as on L2/08/202O not 5 NIL included in the Estimated Cost (Annexure A) TABLE. B MAHATAXMITOWERS Sr. No. Particulars Amounts Total Estimated cost of the lnternal and External Development 1 Works including amenities and Facilities in the layout as on NIL L2l08l2O2O 2 Cost incurred as on L2/08/2020 (based on the Estimated cost) NIL 3 Work done in Percentage (as Percentage of the estimated cost) NIL 4 Balance Cost to be lncurred (Based on Estimated Cost) NIL 5 / Cost lncurred on Additiona! Extra ltems as on L2/O8/2020 not NIL included in the Estimated Cost (Annexure A) Yours Faithfully ER. SAGAR S. SHAH * Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for devetopment of the Real estate Project wil! result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive Annexure A List of Extra /Additional ltems executed with Cost (Which were not parts of the original Estimate of TotalCost) NIL