SAGAR S. SHAH B.E.(Civil) M.!.E.,F. l.V. Cell : 9422247125 F -27433 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OOs FORM.2 ENGI NEER'S CERTIFICATE Date:3L/03120L9 To, Matoshri Buildcon 110, The Presidency Old Agra Road Gadkari Chowk Nashik - 422OO2 Subiect: Certificate of Cost lncurred for Development of Mahalaxmi Towers for Construction Work of 1 Building situated on the Plot No. 15 bearing Gut No. 305 demarcated by its boundaries (latitude and longitude of the end points) plot No. 14 to the North, Plot No. 16 to the South, Adj. G.No. 304(P) to the East, 12 Meter Wide Road to the West of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, plN 422003 admeasuring 1588.00 Sq. Mtrs. Area being developed by M/S. MATOSHRI BUILDCON. Ref: MAHARERA Registration Number p51000018172. Sir, l, Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project registered under RERA, being 1 Building named Mahalaxmi Towers, situated on situated on the Plot No. 15 bearing Gut No. 305 of Division Nashik, Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring 1588.00 Sq. Mtrs. Area being developed by M/s. MAToSHRt BUtLDcoN. Following technical professionals are appointed by owner / promoter:- (i) Mr. Ashok S. Wagh as Licenced Engineer; (ii) Bhavesh Patel as Structural Consultant t. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. we estimate Total Estimated cost of completion of the building MAHALAXM! TowERS of the aforesaid project under reference as { 5,68,75,000. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Apartment being the planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred till date is calculated at { 1,06,64,000. The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated at t 4,62,!1.,000. 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B Below. TABLE .A MAHALAXM!TOWERS Sr. No. Particulars Amounts L Total Estimated cost of the building/wing as on 3I/03/2OI9 { 5,68,75,000 2 cost lncurred as on 31,/03/zoL9 (based on the Estimated cost) { 1,06,G4,ooo 3 work done in Percentage (as percentage of the estimated cost) L8.75% 4 { 4,62,11,000 Cost lncurred on Od 5 included in the Estimated Cost (Annexure A) NIL SAGAR S. SHAH B.E.(Civil) M.t.E.,F.t.V. Cell : 9422247125 F -27433 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahajeevan colony, visemala, college Road, Nashik - 422 oos TABTE -B MAHALAXMITOWERS Sr. No. Amounts 1 works including amenities and Facilities in the layout as on NIL 3tl03/zote 2 aora ,narrr"O .r on NIL 3 Work done in Percentage (as percent, NIL 4 Balance cost to o" ffistimated cost) NIL cost lncurred on Additional / Extra ltems as on 3L/o3/2o19 not 5 included in the Estimated Cost (Annexure A) NIL Yours Faithfully ER. SAGAR S. SHAH * Note t' The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate Certificate. /Completion 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra /Additional ltems executed with Cost (which were not parts of the original Estimate of Total cost) NIL