r II SHRI SWAMI SAMARTH II Er. A. S. Wagh (8. E. Civit) Regd. No. - 70, Dec. 2020 Supervisor 1 : N. O. Vispute Regd. No. - 50, Dec. 2019 WfrGH I UISPOTE fiSSOCIfrTES SUPERVISOR, ENGINEERS & CONSULTING Add. : shop No.10, 1st Floor, samarth sankul, New Tambat Lane, Ashok stambh Nashik- 422 001. Contact : 9881735188 Ref. No. : FORM 1 Date : I 120 Date:31.03.2019 To, Matoshri Buildcon l-10, The Presidency Old Agra Road Gadkari Chowk Nashik - 422002 Subject: Certificate of Percentage of Completion work of building nameMahalaxmiTowers for Construction Work of l Building situated on the Plot No. L5 bearing Gut No.305 demarcated by its boundaries (latitude and longitude of the end points) Plot No. l-4 to the North,Plot No. 16 to the South,Adj. G.No. 304(P) to the East,12 Meter Wide Road to the West of Division Nashik,Village Adgaon, Taluka Nashik, District Nashik, PIN 422003 admeasuring 1588.00 Sq. Mtrs. Area being developed by M/S. MAToSHRI BUlLDcoN. Sir, lEr.Ashok S. Wagh have undertaken assignment as Licenced Engineer of certifying Percentage of Completion of construction work of the projectMAHALAXMI TOWERSfoT Construction Work of 1 Building,situated on the Plot No. 15 bearing Gut No.305, of Divlsion NASHlK,Village Adgaon, Taluka NASHIK, District NASHIK, PIN 422009 admeasuring 1588.00 Sq. Mtrs. Area being developed by Matoshri Buildcon. 1-. Following technical professionals are appointed by Owner / Promoter:- (i) Mr. Ashok S. WaghasLicenced Engineer; (ii) Mr. Bhavesh Patel as Structural Consultant Based on Site lnspection, wlth respect to each of the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51500018!72under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. A& W,AG H.VI }dUTE ASSOCIATES 1C-1sl Flcor, Samarth Sankul, New Tambat Lane, Ashok Stambh Naslrtk - 472 001 f Table A MAHALAXMITOWERS Sr.No. Tasks / Activity Percentage 1 Excavatio n 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 1 Stilt Floor 50 5 7 number of Slabs of Super Structure 30 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 2 and Windows to each of the Flat / Premlses 7 Sanitary Fittings within the Flat / Premlses, Electrical Fittings within the 0 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 30 Staircases and Llfts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 0 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittlngs and Equipment as per cFo Noc, Electrical Fittings to common Areas, Electro, Mechanical Equipment, Compliance to conditions of Envlronment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 0 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Ce rtif icate. ' tl t sr Ficcr, Samarth Sankul' l'.lew Tambai Lane, Ashok Stambh Nashik ' 422 001 ( TABLE -B MAHALAXMITOWERS lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done 1 lnternal Roads and Footpaths No 0 NA Will obtain from NMC after 2 Water Supply Yes 0 completlon Sewerage (Chamber, Lines,Septic Septic Tank, Will do before 3 Yes 100 Tank, STP) obtaining completion 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 0 By NMC 7 Community Buildings No 0 NA Treatment and Disposal of No 0 NA a, Sewage and Salvage Water Solld Waste Management and No 0 NA 9 Disposa I Water Conservation and Rain Yes 0 Rain Water Harvesting will 10 Water Harvesting do before completion 1-1, Energy Management No 0 NA 12 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub- Yes 0 No separate room Station, Receiving Station Yours Faithfully Er. Ashok S. Wagh Licenced Engineer \1"i c !i.\/'i s P ll I I A S S0 : |ATE S 1J-1:' i tCir S.';tarth SarkLtl. f';:.'t ...,,' .:-a^ "',1:l l.:a;,tbh, l,rit5ii;x-.;:l Ci]1