ER ..D. B. GAVHANE B.E. (Civ CONSULTING OVIL ENGINEE +91-98505097 snnnlwasconsullam9S@glla I.CO ~SHRINIWAS ~CONSULTANT Date: I I FORM-l ARCHITECT CERTIFICATE Date: 14/02/2019 Miss. SayaJiUttam Jadhav. P.no. 14, S.no. 63/2A, Datta nagar, Chunchale, Nashik. Subject : Certificate of Percentage of Completion of Construction work of the Project Sai Sangam Appartment of the Project ( RERA Registration No.P51600018027) Situated on the Plot bearing Survey No. 63/2A, Plot No. 14, Chunchale Shiwar, Nashik demarcated by its boundaries ( latitude and longitude of the end points) to the North - Plot No. 13, to the South - 9.00 M.Wide Road, to the East - Plot no.16 at s.no.63/1 to the West 9.00 M.Wide Road of Division Nashik Village Nashik Taluka Nashik District Nashik Pin- 422 010 admeasuring 355.00 Sq.Mtrs area being developed by Miss. Sayali Uttam Jadhav. Sir, Er. D.B. Gavhane have undertaken assignment as Architect / Licensed Engineer of certifying Percentage of Completion of construction work of the Sai Sangam Appartment of the project situated on the plot bearing 63/2A plot No. 14, of Division Nashik Village ChunchaJe,Taluka Nashik District-Nashik,Pin- 422010 admeasuring 355.00 Sq.Mtrs area being developed by Miss. Sayali Uttam Jadhav. I. Following technical professional are appointed by Owner / Promoter: i) Shri D. B. Gavhane as Consulting Engineer ii) Shri D. B. Gavhane as structural Consultant iii) Shri as MEP Consultant IV) Shri as Site Supervisor. Based on Site Inspection, with respect to each of the Building / wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the percentage of work done for each of the building / wing of the Real Estate Project as registered vide number Under RERA is as per table A herein below. The Percentage of the work executed with respect to each of the major activity Of the building / wing and overall percentage of work done with respect to each building / wing is detailed in the table B TABLE A Shree Samarth Krupa Apt ( to be prepared separately for building of the project ) S. Tasks I Activity Percentage of No. work done 1 Excavation 100% 2 Plinth 100% 3 Number of Podiums Not required 4 Stilt floor one 100% 5 5 number of slab of super structure 100% 6 Internal walls, Internal Plaster flooring within Flats / I 100% premises, Doors and windows to each of the Flat premises. 7 Sanitary fittings within the Flat ./ premises Electrical 100% fittings within the Flat / premises. 8 Staircase Lifts well and Lobbies at each Floor level 100% connecting Staircase and lifts overhead and under ground water tanks. 9 The External plumbing & external plaster elevation 100% completion of terrace with waterproofing of the building / wing 10 Installation of lifts, water pumps, Fire fighting fittings 100% and equipment as per CFO NOC Electrical fitting to Common Area, Electro mechanical equipment. Compliance to condition of environment / Finishing to entrance lobby/s plinth protection I paving of area apartment to Building / wing. Compound wall and all other requirements as may be required to obtain I occupation / completion certificate. TABLE B Internal & External Development works n Respect of the entire Registered Building S Common Area and Proposed Percentage Details No. facilities Amenities Yes/ No of work done 1 Internal Roads& Footpath 2 Water Supply 3 Sewerage ( Chamber lines, N.A septic Tank, STP / 4 Storm water Drain / 5 Tree planting V / 6 Street Lighting / / 7 Community Buildings / / y 8 Treatment and disposal of sewage and sullage water / / 9 Solid waste management ~ disposal / / 10 11 Water conservation rain water harvesting Energy Management / LV 12 Fire Protection and fire / safety requirements 13 Electrical meter room receiving station 14 Others ( Option to Add more) Yours faithfully ~ Snnmwas ...onsurtant Er. O.B. Gavhane 1 Atharva Residence, Shivaji Nagar, Signature' Satpur, Nashil<.. Name - Er. D. B. Gavhane Consulting Engineer LicenseNo. 352 Adhar No. 2833 4525 4129