FORM-2 ENGINEER'S CERTIFICATE Deltacom (To be submitted at the time of Registration of Ongoing Project and fp Lructural Withdrawalof Money from Designated Account) Consultants (For Period Ended 31/10/2022) To, www.deltacomcpl.com M/S ADITYA BUILDCON (Partnership Firms), Flat No.2, 2nd Floor, SaisrushtiApt, B/H Palm Hotel, Pathardi Road, Near Eco City, NASHIK-422010 Subject - Certificate of Cost Incurred for Development ofADITYA AVENUE having[MahaRERA Registration Number-P51600017211}\Only Applicable after project Registration) being developed byMR. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. Sir, 1./We B PBhavsar have undertaken assignment ofCertifying Estimated Cost forADITYA AVENUE having (MahaRERA Registration Number- P51600017211) (Only Applicable after project Registration) being developed by MR. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. 2. We have estimated the cost Civil, MEP and allied works of the completion to obtain Occupation Certificate/CompletionCertificate, of the Civil, MEP and Alied works, of the building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project underreference by the Developer and Consultants and the Schedule of items and quantity for the entirework as calculated by quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer,and thesite inspectioncarried out by us. 3. We estimate Total Estimated Cost of completion of the building(s)of the aforesaid projectunder reference as Rs.35640500/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed forthe purpose of obtaining occupation certificate / completion certificate for the building(s) from the N.M.C. being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs.29953671/- (Total ofTable A and B). The amount of Estimated Cost Incurred is calculated on the basis ofinput Materials/services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allied works for completion of the apartments and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of the project is estimated Rs.5686829/-(Total of Table Aand B). 6. Icertify that the Cost of the Civil, MEP and allied work for the apartments and proportionate internal & external works, as per specifications mentioned in agreement of sale, of the aforesaid project as completed on the date of this certificate is as given in Table Aand Bbelow: TACO Nashik: 6Avdhoot Aadhar', Opp.Hotel Vihar, Old Gangapur Naka, Nashlk- 422 005 Ph. 0253-2314995, 2571096 Emall: deltacomcpl@gmail. com Pune : 29, Kshitij Bunglow,Gulmohar Path, Amar Society,Erandwane, Pune-411004 Contact: 9422252335 8380021794 Emall : dscplpune@gmail.com Amounts Project) (3) Rs.35640500/ Rs.29953671/ Rs.5686829/ Estate 84.04% NIL Rs. Phase Real the AVENUE. calledADITYA Building oftheRegistered of /Wing applicable) (If Building TABLEA building/wing the ExternalNIL cost) ltems Respect P.Bhavsar Bhanuvilas each Particulars isupdation ason31/03/2022 in included and ItemsN.A Consultant $tructural Estimatedestimated /Extra cost) the Stru-122 NMC for (2) in andamenities NIL A) IncurredAdditional separately the Percentage Cost) not (Annexure Works Internal cost). IncurredNIL inincluded of of date the PercentageN.A Additional/Extra cost 31/03/2022 of be Estimated Development including cost). estimated Estimated on the prepared Percentage to Cost on Estimated be Cost). not incurred Costthe on (Based in done Work Cost Incurred of as on C). Amountscost to Workslayout CostEstimatedcondition) on Estimated is Registration as the (Table no. Balance (Based Estimated incurred in on be Totalon External of license Signature ofEngineer (To as (As Cost as on Development the donePercentage Particulars the Balance Incurred Cost in on 3Work on Faithfully, Yours Estimated Bhavsar. Authority Facilities 2Cost (based (Based future No Sr. (3) (2) (1) Total Internal& TABLEB of date Cost (1) 1 (as per as on P 2 3 4 5 No. 1 B Local Sr. 5 (as Mr. .0 used ELTAC material Engineer, Engineer. calculated be independent input to to Rs.) (In Amount approved hasof required the the officequantity of in name development deviations Certificateby by drawings an upon incurred. exhaustive. the calculated machinery the Cost by Developer, donerelied for Certificate/Completion be Any in per responsible for to not Example: considered as be be being and incurred/ reguired Project cancan by eguipment and or calculated appointed are qualitications. indicative Engineer is quantity quantity Items Cost) tstate who cost Total Items Deleted quantity Engineer,material, the are Real of being Occupation case in of of Extra/Additional/Deleted (). deviation specifications amendment Estimate deviations/ Extra/Additional/ entire office in surveyor markedlabour, of andof sale. by complete certificateoffice of original obtaindone quantity (*) markedplace all any the includes cost,in with anyagreement be result are the to to canwhose in estimatedwork there the is as person independent place at of workso survey cost will List of should mentioned be work. in part of time Surveyor, of List the Projectcomponentsspecifications specify if Please of Quantity the estimated entire an not were (which scope to at of time Quantityof mentioned name is Estate *Note: out this Thefrom () case The C Table carry As Real All from Sr No. 1. Z. In the 3. 4. 5. 6. 1. 2.