Deltacom Structural FORM-2 Consultants ENGINEER'SCERTIFICATE www.deltacomcpl.com (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (For Period Ended31/03/2021) To, M/SADITYA BUILDCON (Partnership Firms), Flat No.2, 2nd Floor, Saisrushti Apt, B/H Palm Hotel, Pathardi Road, Near Eco City, NASHIK-422010 Subject Certificate of Cost Incurred for Development of ADITYA AVENUEhaving|MahaRERA Registration Number-P51600017211}(Only Applicable after project Registration) being developed by MR. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. Sir, 1.I/We BP Bhavsarhave undertaken assignment ofCertifying Estimated Cost forADITYA AVENUE having MahaRERA Registration Number- P51600017211] (Only Applicable project Registration) being developed by MR. MOHAN BORADE PARTNER OF after M/S ADITYA BUILDCON. 2. We have estimated the cost Civil, MEP and allied workS of the Occupation Certificate/CompletionCertificate, of the Civil, MEP and completion obtain to Allied works, of the building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project underreference by the Developer and Consultants and the Schedule of items and quantity for the entirework as calculated by quantity Surveyor* appointed by assumption of the cost of material, labour and other inputs Developer/Engineer, and the made by developer, and thesite inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid projectunder reference as Rs.35640500/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed forthe purpose of obtaining occupation certificate / completion building(s) from the N.M.C. being the Plarnning Authority under whosecertificate for the aforesaid project is being implemented. jurisdiction the 4. The Estimated Cost Incurred till date is and B) The amount of Estimated Cost calculatedisat Rs.23710219/- (Total ofTable A Materials/ services used and unit cost of theseIncurred items. calculated on the basis oflnput 5. The Balance cost of Completion of the Civil, apartments and proportionate completion MEP and Allied works for of internal & external completion of the specifications mentioned in agreement of sale, of the project is estimated Rs.works, as per (Total of Table Aand B). l1930281/ Nashik : 6Avdhoot Aadhar, Opp.Hotel Vihar, Old Gangapur Naka, Pune : 29, Kshitij Bunglow,Gulmohar Path, Amar Society, Nashik - 422 005 Ph, 0253-2314995, 2571096 Emall : Erandwane, Pune-411004 Contact: 9422252335 ,8380021794 deltacomcpl@gmai. com Email : dscplpune@gmal.com AI certify that the Cost of the Civil, MEP and allied proportionate nternal & external works, as Sale, of the aforesaid project as work per specifications for the apartments and A and B below: mentioned completed on the date of this certificate in agreemernt of is as given in Table TABLEA Building called ADITYA AVENUE. (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No (1) Particulars Amounts (2) (3) 1 Total Estimated cost of the as on 31/03/2022 date ofbuilding/wing updation is Rs.35640500/ 2 Cost incurred as on31/03/2022 (Based on the Estimated cost) Rs.23710219/ 3 Work done in Percentage 66.52% (As Percentage of the estimated cost) 4 Balance Cost to be Incurred Rs.l1930281/ (Based on Estimated Cost) Cost Incurred on Additional /Extra Items 5 as on not inluded in the Rs. NIL Estimated Cost (Annexure A) TABLE B Internal & External Development Works in Respect oftheRegistered Phase Sr. No. Particulars Amounts (1) (2) (3) 1. Total Estimated cost of the Internal and ExternalNIL Development Works including amenities and Facilities in the layout as on date of Registration is 2. Cost incurred as on NIL (based on the Estimated cost). 3. Work done in PercentageN.A (as Percentage of the estimated cost). A Balance Cost to be IncurredNIL (Based on Estimated Cost). 5. Cost Incurred on Additional /Extra ItemsN.A (as per future condition) as on not included in the Estimated Cost (Table C). Yours Faithfully, Mr, B P Bhavsar, Signature of Engineer Local Authority license no.- STATE/R/2022/APL/02659( If applicable) * Note: Estate Project as per drawings approved 1. The scope of work isto complete entire RealCertificate/Completion Certificate. from timeto time so as to obtain Occupation can be done by an 2. (*) Quantity survey can be done by office of Engineer or independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantity are being calculated by office of Engineer, the nameof the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4.theAs this is an estimated cost, any deviation in quantity required for development of Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations/ qualitications, Example: Any deviations in input material used from specifications in agreement of sale. TableC List of Extra/ Additional/ Deleted Items considered in Cost (which were not part of the original Estimate of Total Cost) List of Extraj Additional/Deleted Items Amount (In Rs.)