ARCHITECT INTERIORS AR. JAYWANT N. PAWAR LANDSCAPE B.Arch. AlIA. MCA. DESIGNERS APPROVED VALUER FORM 1 Ref.: Date (seeRegulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (Period Ended- 31/10/2022) To, M/S ADITYA BUILDCON (Partnership Firms), Flat No.2, 2nd Floor, Saisrushti Apt, B/H Palm Hotel, Pathardi Road, Near Eco City, NASHIK-422010 Subject: Certificate of Percentage of Compietion of Tonstruction work of ADITYA ÂVENUE of the Project [MahaRERA Registration Number- P51600017211] situated on the Plot No.-7, of Survey no 319/2A/2B/1 Of Pathardi Shivar Nashik-422010. Sir, /We Jawant Pawar havc undertakcn assigaCnt as Architcct/Licenscd SuTVCyor of certifying Percentage of Completion of Construction Work of ADITYA AVENUE having [MahaRERA Registration Number - P51600017211](Only Applicable after project Registration)being developed by Mr. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Prujeci, icer üíy üiai as unüe iaie ví iüis cer üicaie, ie Perceiage uf Wurk iuHe fuI eaci uí iie building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentageof the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A ADITYA AVENUE (to be prepared scparately for each Layout/ Building/ Wing of the Project) Sr. No. (1) Tasks /Activity (2) Percentage of Actual Work Done (As on date of the Certificate) (3) 1. Excavation. 100% 2 Basement (if any). NA 3 Podiums (if any). NA 4. Piinth. 3,Sanskriti, Murkute Colony, New Pandit Colony, Gangapur Road, Nashik-2 Mo.: 9822817797, 9403519397, E-mail : jnppawar@gmall.com, Website: Findinnashik.in/ArJaywantPawar 5 Stilt Floor. 100% 6. Slabs of Super Structure. 100% 1. Internai waiis, InternaiPiaster, Hioorings, Doors and 100% windows within Flats/Premises. 100% 8. Sanitary Fittings within the Flat/Premises. 100% Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks. 100% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 100% 11. Installation of lifts, water pumps, Fire Fighting and Equipment as per CFO NOC, Electrical fittings, mechanical equipment,compliance to conditions of environment/CRZ NOc, Finishing to entrance lobby/s, plinth prctecticn, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as maybe required to complete project as per specification in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number Sr. No. Common areas and Facilities (2) Proposed Percentage Details (5) (1) (3) of Actual Work Done (4) 1 Internal Roads & Footpaths. NO N.A N.A 2 Water Supply. YES 100% Water Supply tobe Provided. 3. Sewerage (Chamber, iines, Septic Tank, YES STP). Septic tank outlet connecting to the NMC sewer line 4 Storm Water Drains. NO N.A N.A 5. Landscaping& Tree Planting. YES 100% Trees WillBe Planted 6 Street Lighting. NO N.A N.A 7 Community Buildings. NO N.A N.A 8 Treatment and disposalof sewage and sullage NO N.A N.A water. 9. Solid Waste management & Disposal. NO N.A N.A 10. Watcr conscrvaticrn, Rain watcr VES 100 Raii water harvesting. harvesting To Be provided NO N.A N.A 11. Energy management. NO N.A N.A 12.. Fire protection and fire safety requirements YES 100% Electrical meter 13. Electrical meter room, sub-station, room only. receiving station. 14. Others (Option to Add More.) Yours Faithfully, Signature & Name Jaywant Pawar of L.S/ Architect (License No.......... ...) AR. JAYWANT PAAR ARCHITECT CA/98/22561