ARCHITECT INTERIORS AR. JAYWANT N. PAWAR LANDSCAPE B.Arch. AIIA. MCA. DESIGNERS APPROVED VALUER FORM 1 Ref. Date (seeRegulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (Period Ended-31/03/2022) To, M/S ADITYA BUILDCON (Partnership Firms), Flat No.2, 2nd Floor, Saisrushti Apt, B/H Palm Hotel, Pathardi Road, Near Eco City, NASHIK-422010 Subject: CertiYicate of Percentage of Compietion of Construction Work of AD0TYÄÄVENUE od tne Project (MahaRERA Registration Number- P51600017211) situated on the Plot No.-7, of Survey no 319/2A/2B/1 Of PathardiShivar Nashik-422010. Sir, /We JeywantPawar have undertakcn assignncrtt as Architcot /Liccnscd Surveyor of certifjing Percentage of Cornpletion of ConstructionWork of ADITYA AVENUEhaving [MahaRERA Registration Number - P51600017211](Only Applicable after project Registration) being developed by Mr. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Prujeui, iceruíy iiai as un ire aie uf liis cer ificaie, iite Percerriage uf wur¢ HUIe íur eacii ví iie building/Wing of the Real Estate Project under MahaRERA 0s as per Table Aherein below. The percentage of the workexecuted with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A ADITYA AVENUE (to be prepared scparately for each Layout/ Building/Wing of the Project) Sr. No. (1) Tasks / Activity (2) Percentage of Actual Work Done (As on date of the Certificate) (3) 1. Excavation. 100% 2 Basement (if any). NA 3. Podiums (if any). NA 4. Piinth. l00% 3, Sanskriti, Murkute Colony, New Pandit Mo.: 9822817797, 9403519397, E-mail Colony, Gangapur Road, Nashik-2 5. Stilt Floor. 100% 6 Slabs of Super Structure. 100% 1. Internal waiis, Internai Piaster, ioorings, DOors and 100% windows within Flats/Premises. 50% 8. Sanitary Fittings within the Flat/Premises. 100% Staircases. Lifts WNells and Lobbies at each Floor level Overhead and Underground Water Tanks. 70% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 0% 11, Installation of lifts, water pumps, Fire Fighting and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, pinth protecticn, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities. TABLE-B Common Areas (Internal and External Development Works) inrespect of the Registered Phase/ Project Number Sr. No. Common areas and Facilities (2) Proposed Percentage Details (5) (1) (3) of Actual Work Done (4) 1. Internal Roads & Footpaths. NO N.A N.A 2. Water Supply. YES 0% Water Supply to be Provided. 3. Sewerage (Chamber, ines, Septic Tank, YES Ü% Septic tank STP). outlet connecting to the NMC sewer line 4. Storm Water Drains. NO N.A N.A Landscaping& Tree Planting. YES 0% Trees Will Be 6 Street Lighting. Planted NO N.A 7. Community Buildings. N.A NO N.A N.A 8. Treatment water. and disposal of sewage and sullage NO N.A N.A 9. Solid Waste management & Disposal. NO N.A N.A 10. Watcr conscrvation, Rain watc YES harvesting. Rain water harvesting To Be provided 11. Energy management. NO N.A N.A 12. Fire protection and fire safety NO N.A N.A requirements 13. Electrical meter room, sub-station, YES 0% Electrical meter receiving station. room only. 14. Others (Option to Add More.) Yours Faithflly, Signature & Name Jaywant Pawar of L.S/ Architect (License No. ... ....) AR.JAYWANT PAVAR ARCHITECT CA/98/22561