ARCHITECT INTERIORS AR. JAYWANT N. PAWAR LANDSCAPE B.Arch. AIIA. MCA. DESIGNERS APPROVED VALUER FORM 1 Ref.: Date : [seeRegulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (Period Ended-31/03/2021) To, M/S ADITYA BUILDCON (Partnership Firms), Flat No.2, 2nd Floor, SaisrushtiApt, B/H Palm Hotel, Pathardi Road, Near Eco City, NASHIK-422010 Subject: Certificate of Percentage oi Compietion or Construction work of ADITYA ÂVENUE of the Project (MahaRERA Registration Number- P51600017211] situated on the Plot No.-7, of Survey no 319/2A/2B/1 Of Pathardi Shlvar Nashik-422010. Sir, /We Jaywant Pawar have undertaken o:signment s Architect/iccnscd urveyor of certifying Percentage of Completion of Construction Work of ADITYA AVENUE having [MahaRERA Registration Number- P51600017211] (Only Applicable after project Registration) being developed by Mr. MOHAN BORADE PARTNER OF M/S ADITYA BUILDCON. Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Prujeui, icer iyiiai a> unüie daie uf üis cer uiiaie, üie Peceniage uf Wurk dune fu eacii uf ie building/Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A ADITYA AVENUE (to be prepared scparately for each Layout/ Building/ Wing of the Project) Sr. No. (1) Tasks / Activity (2) Percentage of Actual Work Done (As on date of the Certificate) (3) 1. Excavation. 100% 2. Basement (if any). NA 3. Podiums (if any). NA 4. Pintn. ijU% 3, Sanskriti, Murkute Colony, New Pandit Colony, Gangapur Road, Nashik-2 Mo.: 9822817797, 9403519397, E-mail: jnppawar@gmail.com, Website :Findinnashik.in/ArJaywantPawar 5. Stilt Floor. 100% 100% 6 Slabs of Super Structure. Internai waiis, InternaiPiaster, Fioorings, Doors and 50% 1. windows within Flats/Premises. 50% Sanitary Fittings within the Flat/Premises. 100% Staircases. Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks. 70% 10. External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing. 0% 11. Installation of lifts, water pumps, Fire Fighting and Equiprnent as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, pinth protecticn, paving cf areas appurtenant to Building/Wing, Compound Wall and allother requirements as may be required to complete project Sale. Any other as per specification in agreement of activities. TABLE-B Works) in respect of the Registered Phase/ Project Common Areas (Internal and External Development Number Common areas and Facilities (2) Proposed Percentage Details (5) Sr. No. (3) of Actual (1) Work Done (4) Internal Roads & Footpaths. NO N.A N.A 1 2. Water Supply. YES 0% Water Supply to be Provided. 3. Sewerage (Chamber, iines, Septic Tank, YES Septic tank STP). outlet connecting to the NMCsewer line 4 Storm Water Drains. NO N.A N.A 5 Landscaping& Tree Planting. YES 0% Trees WillBe Planted NO N.A N.A 6. Street Lighting. NO N.A N.A 7 Community Buildings. Treatment and disposal of sewage and sullage NO N.A N.A 8. water. N.A N.A 9 Solid Waste management &Disposal. NO YES Rain water Watcr cOnSCrvation, Ra wtCr harvesting To harvesting. Be provided NO N.A N.A 11. Energy management. NO N.A N.A 12. Fire protection and fire safety requirements 0% Electrical meter Electrical meter room, sub-station, YES 13. room only. receiving station. 14. Others (Option to Add More.) Yours Faithfully, Signature &Name Jaywant Pawar of L.S/ Architect (License No. AR. JAYWANT PAWAR ARCHITECT CA/98/22561