trnlKW/\D ,/\R. s,/\rrsH GntKwnD '*|.tr'M'YoEESH MS in Construction.(USA), B.Arch, IIA B.Arch, IIA Construction Manager Architect Architect, Interior Designer Lisioning Consultant +9L-9649444777 +91-9373900813 +91-9405355650 +91-9545003813 tr,/\IKW/\D n550cr/\TE5 REF: - DATE: / FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project md for withdrawal of Money from Designated Account) Date l8-06-2018 IO, The . Ir4/S SHRINATHJI PALACE CO.OP.HSG. SOC.LTD. NASHIK THROUGH CIIAIRMAN Subject : Certificate of Percentage of Completion of Construction Work of RESIDENTIAL BIIILDING No. of Building 1 of the Project situated on the Plot No. 5+6+7 bearing Survey No. ,S.NO.988/10, demarcated by its boundaries 9 M ROAD to the North , S.NO.944 to the South 7.5M ROAD to the East, S.NO. 988/PART to the West of Division NASHIK Village, Nashit Taluka Nashik ,District Nashilq admeasuring 774.49 sq.mts. area being developed by IvVS SHRINATI{JI PALACE CO.OP.HSG. SOC.LTD. NASHIK THROUGH CIIAIRMAN Sfu, U We GAIKWAD ASSOCIATES have undertaken assignment as Architect of certiffing Percentage of Completion of Construction Work of the RESIDENTTAL BUILDING No. of Building I of the Project situated on the Plot No. 5+6+7 bearing Survey No. ,S.NO.988/10, to the West of Division NASHIK Mllage, Nashik, Taluka Nashik ,District Nashik, admeant:rting 774.49 sq.mts. area being developed by IWS SHRINATHII PALACE CO.OP.HSG. SOC.LTD. NASHIK THROUGH CIIAIRMAN 1: Following technical professionals are appolnted by Owner / Promoter (i) M/s GAIKWAD ASSOCIATES as L.S. i Architect ; (ii) Ir,f/s YOGESH THATTE as Structural Consultant (trD Shri. ..... -.................as MEP Consultant (ir,) Shri as Site Supervisor Based on Site Inspection, with respect to each ofthe Building/Wing ofthe aforesaid Real Estate Project, I certit/ that as on the date of this certificate, the Percentage of Work done for each of the building/Wrng of the Real Estate Project as registered vide number Under Maha RERA is as per table A herein below. The perc€nt€e of the work executed with ww w.gnikwadassociates. com Enail: info@gaikwadassociates.com Ph. 0253-6d4Si9h' C'A/O5'365€X! , gaikwadassociates.in@gmail.com, Address: 4-302, Third Floor, Prathamesh Plaza, Above Sony Paithani, Racca Colony, Sharanpur Road, Nashik-5 respect to each ofthe activity ofthe entire phase is detailed in Table B. TABLE-A Building f Sr. No. Tasks /Activity Percentage ofwork (1) (2) done (3) l. Excavation 00 2. I number Plinth 00 3 0 number of Podiums 00 4 Stilt Floor 00 5 5 nunber ofSlabs of Super Structure 00 6 Intemal Walls, Internal Plaster, Floorings within 00 FlatVPremises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings y/ithin the Flat/Premises, Electrical Fittings 00 within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 00 connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and extemal plaster, elevation, 00 completion of terraces with waterproofing of the Building/Wing. 10 Installation of liftq water pumps, Fire Fighting Fittings and 00 Equiprnurt as per CFO NOC, Electrical fittings to Cornmon Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protectioq paving of areas appurtenant to building,/tMing, Compormd Wall and all other requirements as may be required to obtain Occupation/Completion Certificate. {Yogeoh Gaikwad B-Afeb. CAl05-36580 TABLE-B lntemal and Extemal Development Works in respect of the entire Registered Phase. S.No. Common areas and Proposed Percentage Of Details Facilities, Amenities (YeVNo) Work Done fl) (2) (3) (4) (5) I I-nternal Roads & Footpaths. NO 00 2 Water Supplv \.ES 00 .' Sewarage (charnber, lines, YES 00 Septic Tank , STP). 4 Storrn Water Drains YES 00 S.No. Common areas and Facilities, Proposed Percentage Of Details Amenities (YesA{o) Work Done (1) (2) (3) (4\ (5) 5 Landscaping& Tree Planting. YES 0 6 Street Lighting NO 7 ComrnuniW Buildings NO 8 Treatrnent and disposal of sewage NO and sullase water. 9 Solid Waste management & NO Disoosal. l0 Water conservation, Rain water YES 00 harvestine. 11 Energy managemsnt NO t2 Fire protection and fire safety NO reourrements 13 Electrical meter room, sub-statiorl YES 00 receivins station. t4 Others ( Option to Add More). Yours Faithfully,