JAVESH BATAVIA Structural Consultants Chartered Engineer,Valuers Email bataVla.asso®roolffmail.com REF NO: Misc/J.412 DATE: 12.2.2019 FORM-2 [See Regula~on 3] ENGINEER'S CERTIFICATE (T 0 be submited at the lime of Registration of Ongoing Projec;tand for withdrawal of Money from Designated Accoum- Project wise) To, The Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan Address: - Swami Vivekanand Nagar, Nr. Water Tank, Opp. to Irrigation Colony, Makhmalabad, Panchvati, Nashik - 422003. Subject: Certificate of Cost Incurred for Development of Shree Raj Vihar Apartment for Constructon of 01 building(s)/\Ning(s) of the Phase ( MahaRERA Registration Number) situated on the Plot bearing C.N. No.,cTS No.lSurvey No) Final Plot N0104 Sr. No. 417/3A demarcated by Its boundaries (latitude and longitude of the end points) 12 Mtr Road to the North Plot No. 105 to the South Open Space to the East Plot No. 103 to the West of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422003 admeasuring 320 sq.mts. area being developed by Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan Ref: MahaRERA Registration Number _ Sir, 1/ We Engg. Jayesh Batavia have undertaken assignment of certifYing Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being Shree Raj Vihar Apartment BUllding(s)1 \Ning(s) of the Phase situated on the plot bearing C.N. No.lCTS No.lSurvey No.1Final Plot No 104 Sr. No. 417/3A of Division ~ Village Nasik Taluka Nasik District Nasik PIN 422003 admeasunng 320 sq.mts area being developed by Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan 1. Following technical professionals are appointed by Owner I Promoter:- (i) Mis IShrilSmt Ravi Amrutkar as L.S I Architect; (ii) Mis IShri/Smt Eng9. Jayesh Batavia as Structural Consultant (iii) MIs IShri/Smt as MEP Consultant (iv) Mis IShrilSmt as Quantity Surveyor * 2. We have estrnated the cost of the completion to obtain Occupation Certlflcatel Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. OUr estimated cost caculatons are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quarnty for the entire work as calculated by Engg. Jayesh Batavia quan~ty surveyor' appointed by DeveloperlEngineer, and the assumption of the cost of material, labour and other Inputs made by developer, and the site inspection carried out by us. 3. We es~ma.te Total Estimated C.ost of completio~ of the bulldlng(s) of the.afores~ld project under referencet!a Rs. 87.83.996 1- (Total of Table A and B) The estimated Total Cost of project ISWith reference to the CiVil. MEP and allied works required to be completed for the purpose of obtairung occupanon certificate I completion certificate tor the building(s) from the Nasik Municipal Corporation being the Planning Authority under whos jurisdiction the aforesaid project ISbeing implemented. . ' 4. The Estimated Cost Incurred till date is calculated at Rs. 37,31.2001- (Total of Table A and B). The amount of Estimated Cost Incurred IScalculated on the base of amount of Total Estlmated Cost 5. The Balance cost of Completon of the CIVIl. MEP and Allied works of the BUlldlnglS) of the SUbject project to obtain occupanon Certificate I Completlon Certificate from Nasik MUnicipal Corporation (planning Authonty) is esnmated at Rs. 30.52,796/- ( Total of Table A and B) 8. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below' Clot No-2, TR,VJ1