@ Office: 2571589, 231937 Resi. : 2313885 Ravi Amrutkar B.E. (Civil), M.LE., F.LV CONSULTING ENGINEERS UILDING PLANNERS & DESIGNERS AND GOVT. APPROVED VALUER Regd. No. : M 126535 FIV: F 6069 CAT: 1-567-99 Office: Yeolekar Mala Road, Near Shraddha Petrol Pum College Road, Nashik. E-mail: r.amrutkar.asso@gmaiLcom Resl.: Ravi-Jay Bungalow, Sahadev Nagar, Near Chintaman Mangal Karyalaya, Gangapur Road, Nashik. FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date :- 25/01/2019 To, The Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan Address: - Swami Vivekanand Nagar, Nr. Water Tank, Opp. to Irrigation Colony, Makhmalabad, Panchvati, Nashik - 422003. Subject: Certificate of Percentage of Completion of Construction Work of Shree Raj Vihar Apartment No. of Building(s)1 01 Wing(s) of the Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing C.N. No/CrS No.lSurvey No.1 Final Plot No. 104 Sr. No. 417/3A demarcated by its boundaries (latitude and longitude of the end points) 12 Mtr Road to the North Plot No. 105 to the South Open Space to the East Plot No. 103 to the West of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422003 admeasuring 320 sq.mts. area being developed by Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan Sir, 1/ We Ravi Amrutkar have undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of Completion of Construction Work of the Shree Raj Vihar Apartment Building(s)1 01 Wing(s) of the Phase of the Project, situated on the plot bearing C.N. Nol CTS No.lSurvey No.lFinal Plot No. 104 Sr. No. 417/3A of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422003 admeasuring 320 sq.mts. area being developed by Mr. Rahul Bhaskarrao Thakare & Mr. Ajay Abaji Chavan 1 1. Following technical professionals are appointed by Owner I Promoter :- (i) M/s/Shri/Smt. Ravi Amrutkar as L.S. I Architect; (ii) M/s IShri I Smt. Engg. Jayesh Batavia as Structural Consultant (iii) Mis IShri I Smt. ----------- as MEP Consultant (iv) Mis IShri I Smt. ----------- as Site Supervisor Based on Site Inspection, with respect to each of the Building/wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/wing of the Real Estate Project as registered vide number P551600017066 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building /Wing Number Shree Raj Vihar Apartment (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1 ) (2) (3) 1 Excavation 100 % 2 01 number of Plinth 100 % 3 o number of Podiums --- 4 Stilt Floor 100 % 5 04 number of Slabs of Super Structure 100 % 6 Internal Walls, Internal Plaster, Floorings within 60 % Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases, Lifts Wells and Lobbies at each Floor level 0% connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/wing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 2 TABLE-B Internal and External Development Works in respect of the entire Registered Phase. Sr. No. Common areas and Facilities, Proposed Percentage Details (1) Amenities (Yes/No) of Work (5) (2) (3) done (4) 1 Internal Roads & Footpaths NO ----- 2 Water Supply YES 0% 3 Sewarage (chamber, lines, Septic YES 0% Tank, STP). 4 Storm Water Drains NO ---.-- 5 Landscaping & Tree Planting. YES 0% 6 Street Lighting NO ----- 7 Community Buildings NO ----- 8 Treatment and disposal of NO ----- sewage and sullage water. 9 Solid Waste management & NO ----- Disposal. 10 Water conservation, Rain water YES 0% harvesting_. 11 Energy management NO ---.-- 12 Fire protection and fire safety NO ----- re_quirements. 13 Electrical meter room, sub- YES 0% station, receiving station. 14 Others (Option to Add more). ~ RAY. AMRUtTjtlAtRully, B.E.(ClvlllM.I E.F.I.V Signature & Name (IN BLOCK ~Wf;hitect ~UI(DIN' PLANNERS & DESIGNERS (L ' ' ... $Qvt APPROV£¥) VALUER ,cerwb~'t(;"'Ma"ci' 'Co1lege Road Nashik- 422 005. t~02S3·25i15~9 Mob 9823056132. 3 Sr. Apartment Type Carpet Area Number of No. (in Sq. Mts) Apartment 1 1BHK 29.46 03 2 1BHK 28.55 03 3 1BHK 28.45 01 4 1BHK 27.75 03 5 1BHK 26.36 03 6 Shop 13.70 01 7 Shop 10.45 01 Total 388.96 15 RAV, Yours Faithfully, AMRUT~ Signature & Name (IN BLOCK LEnER3I)1£ltltl~~tf~ CONSULTIN . All .rt.v . BIJI.LDING 0LAN G ~GINEERS (License ~