Hitesh Rakholiya & Asso. Mob.No.9403410513 Narhari Nagar, Pathardi, Nashik. K.Hirji Bunglow, P.No.17,S.No.313/3, Opp.Shiv Mandir, Date: 5/9/2olo FORM-2 ENGINEER'S CERTIFICATE withdrawal of Money from of Ongoing Project and for (To be submitted at the time of Registration Designated Account-Project wise) To The Kamdhenu Co-Operative Housing Society of Kamdhenu Co-Operative Housing Society Subject: Certificate of Cost Incurred for Development the Kamdhenu Co-Operative Housing Society for Construction Work of 1 Building(s) / Wingls) of N. No / CTS No. / Survey no. / Final Plot No. Plot No. Building situated on the Plot bearing C. of demarcated by its boundaries (latitude and longitude 02+06+07 S No. 28/2-1+5/2/28-4+55/1A/1 North Plot No. 5,8 and 7.5 mtrs Colony the end points) 18 mtrs. D.P. Road to the to the West of Division Nashik Road to the South Plot No. 1 of S No. 28/2 to the East Open Space Area Nashik PIN 422010 admeasuring 3332.80 sq.mts. village Kamathwade Taluka Nashik District being developed by Kamdhenu Co-Operative Housing Society Reference: RERA Registration Number P51600016952 Sir, of certifying Estimated Cost for the Subject /we Er. Hitesh Rakholiya have undertaken assignment under RERA, being Building(s) Wing(s) of the Real Estate Project proposed to be registered Kamdhenu Co-Operative Housing Society situated on the plot bearing C. N. No/ CTS No. Survey no./ of Division Ambad village Nashik Final Plot no Plot No. 02+06+07 S No. 28/2-1+5/2/28-4+55/1A/1 taluka Nashik District Nashik PIN 422010 admeasuring 3332.80 sq.mts. Area being developed by Kamdhenu Co-Operative Housing Society 1. Followingtechnical professionals are appointed by Owner/Promoter: M/s/Shri/Smt Hitesh Rakholiya as L. S. / Architect; (ii) M/s/Shri/ Smt Rameshbhai Rampariya as Structural Consultant (ii) M/s/Shri/ Smt as MEP Consultant (iv) M/s/Shri / Smt as Quantity Supervisor HITESH RAKHOL!YA Engineer Regd.No.558 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Buildingls) of the project. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Hitesh Rakholya quantity Surveyor appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 9,00,00,000/. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the buildingls) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 9,00,00,000/. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Planning cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated as Nil. aforesaid Project as completed on 6. I certify that the Cost of the Civil, MEP and allied work for the the date of this certificate is as given in Table A and B Below. TABLE A 1 Buildingls)/ Wingls) bearing Number Real Estate Project) (To be prepared separately for each Building/Wing of the Particulars Amounts Sr. No. Total Estimated cost of the building/wing as on 22/06/2018 i.e. date of Registration is Rs.9,00,00,000/- 2 Cost incurred as on 30/06/2020 (based on the RS.9,00,00,000/ Estimated cost) 100% 5 Work done in Percentage (as Percentage ofthe estimated cost) Nil Balance Cost to be Incurred 4 HITESH RAKHOLIYA Engineer Regd.No.558 (Based on Estimated Cost) 5 Cost Incurred on Additional / Extra Items as on Nil 30/06/2020 not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registered phase of the Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the Internal and External Development Works including amenities and 9,00,00,000/ Facilities in the layout as on 22/06/2018 date of Registration is Cost incurred as on 30/06/2020 (based on the 9,00,00,000/ Estimated cost) 3 Work done in Percentage 100% (as Percentage of the estimated cost) Balance Cost to be Incurred Nil (Based on Estimated Cost) Nil 5 Cost Incurred on Additional / Extra Items as on 30/06/2020 not included in the Estimated Cost (Annexure A) Yours Faithfully Signature of Engineer HITESH RAKHOLIYA (Licence No.. Engineer Regd.No.558