202, Second Floor, Roongta Arcade, Opp. Kulkarni Garden, Sharanpur Road, Nashik-422001. Ph : 0253 - 2232575. e-mail : jadhavpankaj02@gmail.com Ar. Pankaj Jadhav Annexure A FORM I (See Regulation 3) ARCHITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 14/10/2023 To, VIVA HIGHWAYS LIMITED S. No 113/2 3rd Floor, Ashoka Business Enclave, Wadala Road, Nashik - 4220010 Subject: Certificate of Percentage of Completion of Construction Work of Project "Atharva Heights" having MahaRERA Registration Number P51600015843 (only Application after project Registration) being developed by Viva Highways Limited Sir, 1/We have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of Atharva Heights having Maha RERA Registration Number P5 1600015843 being developed by Viva Highways Limited Based on Site inspection, with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entiçre phase is detailed in Table B. Ar. Pànkaj P. Jadhav B. Arch. CA/2U14/64783 Office No. 202, ungta Arcade Apartment Opp. Kulkarni Garden, Sharanpur Road, Nashik-422 005 TABLE-A Layout/Building/Wing Number 'Wing A' (to be prepared separately for each Layout/Building /Wing of the Project) Sr.No Percentage of Actual Work Done Tasks / Activity (1) (as on date of the Certificate) (2) (3) Excavation 100% 2. RCC-100%,waterproofing-100%, Basements (if any) Finishing-0% 3. Podiums (if any) - 4. Plinth 100% RCC-100%,waterproofing-%, 5 Stilt Floor' Finishing-25% 6. Slabs of Super Structure 100% internal walls, internal Plaster, Floorings, doors Internal wall-100%, Internal and windows within Flats/Premises plaster-100%, Flooring-80%, Doors & windows within flat/premises- 50%. 8. Sanitary Fittings within the Flats/Premises 10% Staircases. lifts Wells and Lobbies at each Floor Staircase-90%, Lift wells & lobbies level Overhead and Underground Water Tanks at each floor level-90%, Overhead water tank-75%, Underground water tank-95%. External plumbing and external plaster, External plumbing-65%, External elevation, completion of terraces with plaster-100%, elevation, completion 10 waterproofing of the Building/wing, of terraces with waterproofing of the Building/wing-60% Installation of lifts, water pumps, Fire Fighting Installation of lifts commertial- Fittings and Equipment as per CFO NOC, 80%, water pumps-50%, Fire electrical fittings, mechanical equipment, Fighting Fittings and Equipment as compliance to Conditions of environment /CRZ per CFO NOC, electrical fittings, NOC. Finishing to entrance lobby/s. plinth mechanical equipment, compliance protection, paving of areas appurtenant to to conditions of environment /CRZ Building/Wing. Compound Wall and all other NOC-Commercial -90% & residential requirements as may be required to complete -40%. Finishing to entrance project as per Specifications in agreement of lobby/s-50%. plinth protection- NA, Sale. Any other activities, paving of areas appurtenant to building/ Wing -0%. Compound Wall -90% and all other requirements as may be required to complete project as per Other activities (terrace garden with jogging track, community hail, garbage chute, rainwater harvesting, ground and basement parking)-0%. Ar. Pnk'aj P. .Jadhav B. Arch CA/2U14/64783 Office No. 202, Rungta Arcade Apartment Opp. Kulkarni Garden, Sharanpur Road, Nashik-422 OO TABLE-A Layout/Building/Wing Number 'Wing B' (to be prepared separately for each Layout/Building /Wing of the Project) Percentage of Actual Work Done Sr.No Tasks / Activity (as on date of the Certificate) 1) (3) Excavation 100% RCC-100%,waterproofing-100%, 2. Basements (if any) Finishing-0% 3. Podiums (if any) - 4. Plinth 100% RCC-100%, waterproofingO%, 5. Stilt Floor Frnishing-0% 6. Slabs of Super Structure 100% internal walls, internal Plaster, Floorings, doors internal walls-100%, internal and windows within Flats/Premises Plaster-100%, Floorings-60%, doors and windows within Flats! Premises-7 5% 8. Sanitary Fittings within the Flats/Premises 5% Staircases, lifts Wells and Lobbies at each Floor Staircase-85%, Lift wells & level Overhead and Underground Water Tanks lobbies at each floor level-42%, Overhead water tank-95%, Underground water tank-95%. External plumbing and external plaster, External plumbing-60%, external elevation, completion of terraces with plaster-100%, elevation, 10. waterproofing of the Building/wing, completion of terraces with waterproofing of the Building/wing-60% Installation of lifts, water pumps, Fire Fighting Installation of lifts-40%, water Fittings and Equipment as per CFO NOC, pumps-0%, Fire Fighting Fittings electrical fittings, mechanical equipment, and Equipment as per CFO NOC, compliance to Conditions of environment /CRZ electrical fittings, mechanical NOC. Finishing to entrance lobby/s. plinth equipment, compliance to protection, paving of areas appurtenant to Conditions of environment /CRZ Building/Wing. Compound Wall and all other NOC-25%. Finishing to entrance requirements as may be required to complete lobby/s-10%. plinth protection- project as per Specifications in agreement of NA, paving of areas appurtenant 11. Sale. Any other activities, to Building/Wing-0%. Compound Wall 90%. and all other equipment's as may be required to complete project as per Specifications in agreement of Sale. Other activities (terrace garden with jogging track, community hail, garbage chute, rainwater harvesting, ground and basement parkingj-0%. ArS1arikaj P. Jadhav 8. Aith. CA/2 014/64783 Office No. 202, Rungta Arcade Apartment Opp. Kulkarni Garden, Sharanpur Road Nashik-422 005 TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered Phase! Project Number- P51600015843 Sr. No Common areas and facilities Proposed Percentage of Details (1) (2) (Yes / No) Actual Work Done (s) (3) (As on date of the Certificate) (4) 1. Internal Roads & Footpaths No Not Applicable 2. Water Supply Yes 30% To be obtained from NMC on completion of the project 3. Sewerage (Chamber, Yes 10% Will be provided lines, Septic tank, SIP) only if required by NMC UDCPR Rules 4. Storm Water Drains Yes 10% NA 5. Landscaping & Tree Yes 0% Will be provided Planting only if required by NMC UDCPR Rules 6. Street Lighting No - NA 7. Community Buildings Yes COMMUNITY HALL AT WING-A 8. Treatment and disposal of Yes 35% Will be provided sewage and only if required by sludge water. NMC UDCPR Rules 9. Solid Waste Yes 10% NA management & Disposal 10. Water conservation / No - Will be provided Rain water harvesting only if required by NMC UDCPR Rules 11. Energy management No - NA 12. Fire protection and lire Yes 30% Will be provided safety only if required by Requirements NMC UDCPR Rules 13. Electrical meter room, sub- Yes 35% Individual Electric station, Meter provided Receiving station. after completion 14. Others (Option to Add Yes 0% more): Driveway Yours Faithfully, Signature of Promoter AR. NKAJP.JADHAV (CA/2014/64783) Anup S. Katariya Ar. Pankaj P. Jadhav Director B. Arch. DIN: 08574432 CA/2014/64783 Office No. 202, Rungta Arcade Apartment Opp. Kulkarni Garden, Sharanpur Road, Nashik-422 005