RAMESH B . WAGH 6, SHRADHA SANKUL, OLD GANGAPUR NAKA, GANGAPUR ROAD, NASHIK-422005 ER. RAMESH B, WAEiH Email: - rameshwagh2 l@gmail.com istrillr)t r:n(;i{}ee & 3Ca: {:{,5.9ir91 Phone: (0253| 2982222, Mob.- 1 ENGINEER'S CERTIFTCATE (FORM 2I Date:13.02.2021 To, SEIAL BUITDCON PVT. tTD. 1,5,6 Shradhha Sankul Co. Op. Hsg. Society, Gangapur Naka, Gangapur Road, Nashik 422005 Subject: Certificate of Cost lncurred for Development of SEJAT GTORY APARTMENT for Construction Work of 1 Building situated on the Plot No. 2L+22+23 bearing Survey No. 82/1A demarcated by its boundaries (latitude and longitude of the end points) Plot No. 24 to the North, 7.5 Meter Road to the South, Plot No. 28,29 & 30 to the East, 7.5 Meter Road to the West of Division NASHIK, Village NASHIK, Taluka NASHIK, District NASHIK, PtN 422003 net admeasuring 637.47 Sq. Mtrs. area being developed by SEJAT BUILDCON PVT. LTD. Ref: MahaRERA Registration Number P51600015796. Sir, l, Er. Ramesh B. Wagh have undertaken assignment as Licensed Engineer of certifying Percentage of Completion of construction work of the project SE AL GTORY APARTMENT situated on the Plot No. 2L+22+23 bearing Survey No. 82/14, of Division NASHIK, Village Nashik, Taluka NASHIK, District NASHIK, PIN 422003 net admeasuring 637.47 Sq. Mtrs. area being developed by SUAI BUILDCON PVT. tTD. Following technical professionals are appointed by Owner / Promoter:- (i) Er. Ramesh B. Wagh as L. S. / Architect; (ii) Er. Ramesh B. Wagh as Structural Consultant t. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Ramesh B. Wagh quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the SEJAT GTORY APARTMENT of the aforesaid project under reference as Rs. 2,O7,lO,O00l- (ln words Rupees Two Crores Seven Lakhs And Ten Thousand Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred titl date is calculated at Rs. 2,07,10,000/- (Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at NIL ( Total of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABTE A SEIAL GTORY APARTMENT Sr. No. Particulars Amounts L Total Estimated cost of the building Rs.2,07,10,0fiV- as on 15.02.2018 date of Registration is 2 Cost incurred as on L3.O2.2O2L Rs. 2,07,10,000/- [based on the Estimated cost) 3 Work done in Percentage LOO/o [as Percentage of the estimated cost) 4 Balance Cost to be lncurred Nil IBased on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems as on Nil L3.02.2O2t not included in the Estimated Cost (Annexure A) TABTE B SE'AI GTORY APARTMENT Sr. No. Particulars Amounts L Total Estimated cost of lnternal & External Nil Development Works including amenities and Facilities in the layout as on 15.02.2018 date of Registration is 2 Cost incurred as on L3.O2.2O21 Ni! (based on the Estimated cost) 3 Work done in Percentage Nil [as Percentage of the estimated cost) 4 Balance Cost to be Incurred Nil IBased on Estimated Cost) 5 Cost lncurred on Additional/Extra ltems Nil as on 13.02.2021 not included in the Estimated Cost (Annexure A) Yours Faithfully ER. RAMESH B. WAGH Signature of Engineer RAIIESI{ B. WAGIf * Note Res. No. ie[n?Ji'fr. ror,. 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive Annexure A List of Extra lAdditional ltems executed with Cost (which were not part of the original Estimate of Total Cost) NIt