Shrikant Sohani B. Arch AlIA • I. ~ f.rA.. Cormissbner OIl Rood. 9la0flU Rood. calOdo Comer. NasI: 422 002 Cel 94222 70504. - ARCIDTECT'S CERTIFICATE Date: - 26/09/2018. To, Mis Viraj Buildeon partnership firm, Partner. Mr. Rajendra M.Mankar & Mrs. Vishali R. Mankar, Nashik. Subject: Certificate of percentage of Completion of Construction Work of Resi. + Comm. Building Named - Viraj Appartment No. of Building(s) INos wing(s) of the =-_Phase of Project [MahaRERA Registration Number] P51600015801 situated on the Plot bearing Survey No. 324/1/B/3/112 Final Plot No. 02 demarcated by its boundaries (latitude and longitude of the end point s) Adj P.No. 21 to the North 6.00 M. W. Road to the South 12.00 M. W. Road to the East Adj. P.No. 01 to the west of Division Pathardi Village Nashik Taluka Nashik District Nashik PIN 422010 admeasuring 362.31 sq.mts. area being developed by Mis Viraj Buildeon partnership firm, Partner. Mr. Rajendra M.Mankar & Mrs. Vishali R. Mankar, [promoter's name] Sir, II We Ar.Shrikant M. Sohani have undertaken assignment as Architect 1Licensed Surveyor of certifying Percentage of Completion on Construction work of the Resi. + Comm. Building Named - Viraj Appartment Building (s) 1Building lwing(s) of the Building-Phase of the project, situated on the plot bearing Survey No. 324/1/B/3/1/2 Final plot No. 02 of Division Pathardi village Nashik Taluka Nashik District Nashik PIN 422010 admeasuring 357.00 sq.mts. area being developed by Mis Viraj Buildeon partnership firm, Partner. Mr. Rajendra M.Mankar & Mrs. Vishali R. Mankar [promoter's Name] • Following technical professionals are appointed by Owner 1 Promoter :- • Shri. Shrikant M. Sohani as L.S. 1 Architect • MIs. Yogin Kulkarni as Structural Consultant Based on Site Inspection, with respect to each of the Building 1Wing of the aforesaid Real Estate Project, I certify that on this certificate, the percentage of work done for each of the buildingIWing of the Real Estate Project as registered vide number P51600015801 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Shrikant Sohani B Arch AlIA • 1.WlwestlNCJ ~ Cor'rnlssIoner 00 Rood. ShaQnpU' Rood. Cmodo Comet Nasit 422 002 eel' 94222 70504 - TABLE-A Building / Wing Number 01 (to be prepared separately for each Building / Wing of the project) Sr. Tasks / Activity Percentage of work done No. (2) (3) (1) 01 Excavation 100% 02 01 number of plinth 100% 03 number of Podiums N.A 04 Stilt Floor 0% 05 05 number of Slabs of Super Structure 18% 06 Internal Walls, Internal Plaster, Flooring within 0% Flats/Premises, Doors and Windows to each of the Flat / Premises. 07 Sanitary Fittings within the Flat/Premises, 0% Electrical Fitting within the FlatlPremises. 08 Staircases, Lifts Wells and Lobbies at each 0% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 09 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fittings 0% and Equipment as per CFO NOC, electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing , Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Shrikant Sohani B. Arch AlIA 1.'M?NastrNcr I(A. CoomIsstnr OIl Rood. Shaorw Rood. Cooodo CelIna Nast 422 002. eel 94222 70504 - TABLE-B Internal and External Development Works in respect of the entire Registered Phase. Sr. Common areas and Facilities, Proposed Percentage Details No. Amenities (Yes / No.) of Work (5) (1) (2) (3) done (4) 01 Internal Roads & Footpaths No 0 - 02 Water Supply Yes 50% BOREWELL/ MUNICIPAL 03 Sewerage (chamber, lines, Yes 0% - spectic Tauk, STP_). 04 Storm Water Drains No - - 05 Landscaping & Tree Planting. No 0% 5 TREES 06 Street Lighting No - - 07 Street Lighting No - - 08 Treatment and disposal of No - - sewage and sullage water. 09 Solid Waste management & No - Disposal. 10 Water conservation, Rain water Yes 0% - harvesting 11 Energy management No - - 12 Fire protection and fire safety No - - requirements. 13 Electrical meter room, sub- Yes 0% - station, receiving station. 14 Others ( Option to add more) - - - ~Yours Faithfully, to. ~ ~ :::9--~' G~~~>~ Ar. Shrikant M Sohani