o Vijaya Consultants BUILDING CONSULTING ENGINEERS PLANNERS 10, SIDDHI PARK, NEW PANDIT COLONY NASHIK. a Ph.: (O)2574602, Mob. : 9822020644. STRUCTURAL Email :- ashokjamdar@yahoo.com CONSULTANTS ASHOK JAMDAR FORM 1 Certifacate No 0031/2019 CERTIFICATE Date:30.09.2019 To, Hardik Developers Basement, Dharmabhakti Complex, 6th Scheme CIDCO, Near Symboisys collage, Nashik 422009 Subject: Certificate of Percentage of Completion work of building name DURGA PALACE for Construction Work of 1 Building situated on the Plot No. 3 bearing Survey. No 31/1/84+31/1/88 demarcated by its boundaries (latitude and longitude of the end points) Adj. S.no 31l117A+TBllto the North, D.P. Road to the South, Adj S. No. 27 to the East, Plot No. 2 to the West of Division NASHIK, Village Anandwalli, Taluka NASHIK, District NASHIK, PIN 422013 admeasuring 646.51 Sq. Mtrs. area being developed by Hardik Developers. Sir, I Er. Ashok Jamdar have undertaken assignment as Engineer/ Licensed Engineer /Surveyor of certifying Percentage of Completion of construction work of the project DURGA PALACB situated on the Plot No. 3 bearing Survey. No 31/1/8A+3llll8B, of Division NASHIK, Village Anandwalli, Taluka NASHIK, District NASHIK, PIN 422013 admeasuring 646.51 Sq. Mtrs. area being developed by Hardik Developers 1. Following technical professionals are appointed by Owner / Promoter:- (i) Shri Ashok Jamdar as L. S. / Engineer ; (ii) Shri Prasanna Bhore as Structural Consultant Based on Site lnspection, with respectto each of the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51600015780 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A DURGA PALACE Building Sr.No Tasks / Activity Percentage 7 Excavation 100 2 L number of Plinth 100 3 0 number of Podiums 0 4 1 Stilt Floor 100 5 7 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 100 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 100 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing 1.0 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 100 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE - B DURGA PALACE Building lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done I lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 Applied to NMC 3 Sewerage (Chamber, Lines, Septic Yes 100 Septic Tank Done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 100 By NMC 7 Community Buildings No 0 NA 8 Treatment and Disposal of No 0 NA Sewage and Salvage Water 9 Solid Waste Management and No 0 NA Disposal 10 Water Conservation and Rain Yes 100 Rain Water Harvesting Done Water Harvesting TL Energy Management No 0 NA 12 Fire protection and Fire Safety No 0 NA Requirements L3 Electrical Meter Room, Sub- Yes 0 Some lndividual Meters Station, Receiving Station Taken 74 Others (Option to add more) fr Fa ly Er. Ashok Jamdar L. S. / Engineer