I 2, Ashirwad Pride, Opp.Tirupati Town N . Nashik -13 • Ph . (0253) 2344175 C' ear Akashwam Tower, Gangapur Road E-man..... Jd_sonar@rediffmaiLcom • ell: 9860607888 8UILOWE SUlDERS & LAND DEV ENGINEERS & CONTR FORM-2 (See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 15th April 2019 To, The Mis SQUARE ESTATE,Shop No. 01, New Spring Field Apartment, Gangapur Road, Nr. Akashwani Tower, Nashik. - 422013. Subject: Certificate of Cost Incurred for Development of B-SQUARE for Construction of Q1_ building(s)/------ Wlng(s) of the:.:.:::.:::Phase P51600014876 situated on the Plot bearing C.N. No.lCTS No.lSurvey No I Final Plot No.03 Sr. No. 304/2/1 demarcated by its boundaries ( latitude and longitude of the end pomts) D. P Road to the North Plot No 2 to the South D. P Road to the East Open Space to the West of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422010 admeasuring 777.87 sq.mts. area being developed by Mis SQUARE ESTATE Ref' MahaRERA Registration Number P51600014876 Sir 1/ We Bhanuvilas Bhavsar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project B-SQUARE proposed to be registered under MahaRERA, being 01 Building(s)1:=:.::..Wing(s)of the:.:.:::.::: Phase situated on th~ plot bearing C.N. No.lCTS No.lSurvey No I Final Plot No.03 Sr. No. 304/2/1 of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422010 admeasuring 777.87 sq.mts. area being developed by Mis SQUARE ESTATE 1. Following technical professionals are appointed by Owner I Promoter'- (i) Mis IShrilSmt Rav! Amrutkar as L.S. I Architect; (ii) Mis IShri/Smt Bhanuvilas Bhavsar as Structural Consultant (iii) Mis IShri/Smt ..:..:_ as MEP Consultant (IV) MIs IShn/Smt Jagdish Sonar as Site Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificatel Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor" appointed by De~~loper7Engine~r,.and the assumption of the cost of material, labour and other inputs made by developer, and.ttre site inspection carried out by us. For ASHIP I n DUILDWELl .....ull (or 3. We estimate Total Estimated Cost of completion of the buildlng(s) of the aforesaid project under reference as Rs 2,10,12,500 ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate I completion certificate for the building(s) from the Nashik Municipal Corporation being the Planning Authority under whose Jurisdictionthe aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs 1,36,58,125 (Total of Table A and B)_ The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate I Completion Certificate from Nashik Municipal Corporation (planning Authonty) is estimated at Rs. 73,54,375 ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate IS as given In Table A and B below: TABLE A Building NVing bearing Number__ or called B-SQUARE (to be prepared separately for each Bulldina NVina of the Real Estate Protect) Sr No Particulars Amounts in INR I (1) (2) (3) 1 Total $stimated cast of the building/wing as on 2,10,12,500 09/12/2017 date of Registration is 2 Cost incurred as on 30/01/2019 1,36,58,125 (based on the Estimated cost) 3 Work done in Percentage % 64.82 % .(as Percentage of the estimated cost) ~. • I. I 4 • ,B~lance Cost to be Incurred 73,54,375 '(Based on Estimated Cost) 5 I Cost Incurred on Additional/Extra Items as on not 0 , Included in the.Bstimated Cost (Annexure A) TABLE B I Sr No " r1 I (to be prepared for the entire recistered ohase of the Real Estate Proiect) Particulars Amounts In INR (1) (2) (3) 1 Total Estimated cost of the Internal and External 0 Development Works including amenities and Facilities in the layout as on date of Registration is _. 2 Cost incurred as on 0 (based on the Estimated cost). 3 Work done in Percentage 0% (as Percentaqe of the estimated cost). 4 Balance Cost to be Incur~~d 0 5 I {l3ased on Estimated Cos . Cpst Incurred on Additional/Extra Items as on '. ,'not I , .• _ included in the 0 Estimated Cost (Annexure A). Yours Falthful~y" _. Signature of Engineer. (Licence No ..... '.. :... :.) f"" . -c;" nQn~~IBtJlL;O.wa-L 1'. :, t i .: r' -, ... ' f ~, , ! P! 1~~Of-t~ • ~J