I 2. Ashirwad Pride.Opp.Tirupati Town. Near Akashwani Tower, Gangapur Road Na>~ik·13· Ph.: (OZ53)2344175· Cell 9860607888 BUILDWELL E·maJI: Jd_sonar@rediffmailcom BUID£IIS .. UNO DEVELOPERS ENGINEERS .. COIlTRACTDRS FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE ,To be slJbrruhed at thl wne of ReglstrcltiOn or Onge.ng Project and fO( ~ithdra...'11 of Money teem Oesrgnated Account- Pro~ 'M$e) Date: 30'h January 2019 To. The Mis SQUARE ESTATE,Shop No. 01, New Spring Field Apartment, Gangapur Road, Nr. Akashwani Tower, Nashik •• 422013. Subject: Certificate of Cost Incurred for Development of B·SQUARE for Construction of .Q.1.building(s)/= Wing(s) of the-·-- Phase P51600014876 situated on the Plot bearing C N. NO.ICTS No.ISurvey No I Final Plot No 03 Sr. No. 304/2/1 demarcated by its boundaries ( latitude and longitude of the end points) D. P Road to the North Plot No 2 to the South D. P Road to the East Open Space to the West of Division Nasik Village Naslk Taluka Nasik District Naslk PIN 422010 admeasuring 777.87 sq.mts, area being developed by MIs SQUARE ESTATE Ref: MahaRERA Registration Number P51600014876 Sir, II We Bhanuvilas Bhavsar have undertaken assignment of certrfylng Esllmated Cost for the Subject Real Estate Project B·SQUARE proposed to be registered under MahaRERA. being .Q.1.Burtding(s)!- •• Wing(s) of the = Phase snuateo on the plot bearing C.N. No ICTS No.lSurvey No.1Final Plot No.03 Sr. No. 3041211 of Division Nasik Village Nasik Taluka Nasik District Nasik PIN 422010 admeasuring 777.B7 sq.mts. area being developed by Mis SQUARE ESTATE 1. FOllowingtechnical professronals are appomteo by Owner I Promoter:- (I) Mis IShrilSmt Ravi Amrutkar as L S. I Architect; (ii) Mis IShri/Smt Bhanuvilas Bhavsar as Structural Consultant (iii) Mis IShnlSmt as MEP Consultant (iv) Mis IShri/Smt Jagdish Sonar as Site Surveyor' 2. We have estimated the cost of the completion to obtain Occupation Certificatei Completion Certificate. of the ClVlt.MEP and AllIed works. of the BUlldlng(s)of the project. Our esumated cost calculations are based on the Drawings/plans made available to us for tne project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor' appointed by Developer/Engineer. and the assumption of the cost of material, labour and other inputs made by developer and the sne rnspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs 2,10,12.500 ( Tolal of Table A and 8). The esemated Total Cost of project ~ Withreference to the Civil. MEP and aOiedworks required to be completed for the purpose of obtalntng occupation certificate I completion certificate for the building(s) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project Is being implemented. 4. The Estimated Cost tncurred till date is calculated at Rs 1.36,58,125 (Total of Table A and B)_ The amount of Estimated Cost Incurred IS calculated on the base of amount of Total Esnrnated Cost. 5. The Balance cost of Completion of the CiVil, MEP and Allied works of me BUlldlng(s)of the subject project to obra.n occupaucn Certificate I Complelton CenJficate from Nashik MuniCipal Corporation (planning Auihonty) rs estimated at Rs. 73,54,375 (Total of Table A and 8) 6. I cenafythat the COStof the CIVil MEP and allied work for the aforesaid Project as completed on the date of this certificate Is as gIVen In Table A and 8 below TABLE A Building IWing beaflng Number_ or called B-SQUARE (to be 2repared se2aratelr for each BUilding/WlnQ of the Real Estate Project) SL No Particulars Amounts in INR (1) I (2) (3) r. 2 Total Estimated cost of the building/wing as on 09/1212017 date of Registration is Cost incurred as on 30/01/2019 (based on the Estimated cost) 2,10,12,500 1,36,58,125 3 Work done in Percentage % 64.82 % (as Percentaqe of the estimated cost 1 4 Balance Cost to be Incurred 73,54,375 (Based on Estimated Cost) 5 Cost Incurred on Additional IExtra Items as on not 0 included in the Estimaled Cost (Annexure A) TABLE B (to be prepared for the enlire registered phase of the Real Estate pro],:::.ec::_:t'---:-777::=- __ -' srNoI Particulars f Amounts in INR I (2) 3 - (1)1 Total Estimated cost of the Internal and External \"L 0 I • Development Works including amenities and Facilities In the layout as on date of - ~ Registration is I Cost incurred as on 0 " (based on the Estimated cost). 3 Work done in Percentage 0% I I (as Percentage of the estimated cost). 4 Balance Cost to be Incurred 0 ~ased on Estimated Cost). ost Ineu rred on Additional/Extra Items as on 0 not included in the Estimated Cost (Annexure A). j Yours Faithfully Signature of Engineer. (Licence No )