I 2, Ashirwad Pride, Opp.Tirupatl Town, Near Akashwani Tower, Gangapur Road Nashlk -13 • Ph.: (0253) 2344175. Cell: 9860607888 f-mail: jd_sonar@rediffmail.com FORM-2 BUILDWELL 8UIDERS & LAND DEVELOPER ENGINEERS & CONTRACTOR [See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted al the trne of Registration of OngOIll9 Prosectand for WIthdrawal of Money from Designated Account- Project wise) Date. To, The Mis SQUARE ESTATE,Shop No. 01, New Spring Field Apartment, Gangapur Road, Nr. Akashwanl Tower, Nashlk. - 422013. Subject: Certificate of Cost Incurred for Development of B-SQUARE for Construction of Q1_buildlng(s)/-- Wlng(s) of the= Phase P51600014876 situated on the Plot bearing C.N. NolCTS No.lSurvey No.1 Final Plot NO.03 Sr. No. 304/211 demarcated by Its boundaries (Iatrtude and longitude of the end points) D. P Road to the North Plot No 2 to the South D. P Road to the East Open Space to the West of Division Nasik Village Nasik Taluka Nasik District Naslk PIN 422010 adrneasunnq 777.87 sq.mts area being developed by Mis SQUARE ESTATE Ref: MahaRERA Registration Number P51600014876 Sir 1/ We Mis SQUARE ESTATEhave undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project B-SQUARE proposed to be registered under MahaRERA. being Q1_Building(s)1==.Wlng(s) of the = Phase situated on the plot bearing C N No ICTS No.lSurvey No I Final Plot No.03 Sr. No. 304/211 of Division Naslk Village Nasik Taluka Nasik District Nasik PIN 422010 admeasuring 777.87 sq.mts. area being developed by Mis SQUARE ESTATE 1. FollOWingtechnical professionals are appointed by Owner I Promoter.- (I) Mis IShn/Smt Ravi Amrutkar as L.S I Architect; (il) MIs IShrVSmt Bhanuvilas Bhavsar as Structural Consultant (IIi) Mis IShnlSmt as MEP Consultant (IV) Mis IShrrlSmt Jagdish Sonar as Site Surveyor· 2. We have estrmated the cost of the completion to obtain Occupation Certifcate/ Completron Certificate. of the Civil, MEP and Allied works, of the BUllding(s)of the project. Our eslJmatedcost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of Items and quanlJty for the entire work as calculated by quanlJtySurveyor' appointed by Qeveloper/Engineer, and the assumptron of the cost of matenal. labour and other Inputs made by developer, a~~ the sit~ inspection carried out by us 3. We estimate Total Estimated Cost of completion of the building(s) at the aforesaid project under reference as Rs. 2.10.12.500 (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate 1 completion certificate for the building(s) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 34.50.875 (Total of Table A and B)_. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate I Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at Rs. 1.75.61.625 ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this cerlificate is as given in Table A and B below: TABLE A Building !Wing bearing Number__ or called B-SQUARE (to be prepared separately for each BuildinQ!WinQ of the Real Estate Project) Sr. No Particulars Amounts in INR (1) (2) (3) 1 Total Estimated cost of the building/wing as on 2,10,12,500 09/12/2017 date of Registration is 2 Cost Incurred as on 04/06/2018 34,50,875 (based on the Estimated cost) 3 Work done in Percentage % 16.42 % (as Percentaae of the estimated cost) 4 Balance Cost to be Incurred 1,75,61,625 (Based on Estimated Cost) 5 Cost Incurred on Additional/Extra Items as on not 0 included in the Estimated Cost (Annexure A) TABLE B Sr. No . I , (to be prepared for the entire rec.stered chase of the Real Estate Project) Particulars Amounts in INR (1) (2) (3) 1 Total Estimated cost of the Internal and External 0 Development Works including amenities and Facilities in the layout as on date of Registration is 2 Cost Incurred as on 0 (based on the Estimated cost). 3 Wprk done i'l Percentage 0% (as Pe~~ritage of the estimated cost). 4 Balance Cost to be Incurred 0 (Bas~d on Estimated Cost). 5 Cost Incurred on Additional/Extra Items as on 0 • not included in the Estimated Cost (Annexure A). Yours Faithfully, Signature of Engineer. (Llcence No ) fo' II ",," 0 -~..