Hdeash Rakholiya & Asso. K.Hirji Bunglow.P.No.17,S.No.313/3,Opp.ShivMandir.Narhari Nagar.Pathardi, Nashik.Mob.No9403410513 Date: o/11/2020 FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Building/Wing wise) To Mr. Arvindbhai B. Rakholiya,Shiv Plaza, Mandlik Nagar, Chandashi, Nashik Subject: Certificate of Percentage of Completion of Constructie Work of SHIVPLAZA, Building /Phase of the Project situated on the Plot bearing Survey no. 48/3+48/4+50/1+3/2+50/1+3/3+50/2+50/4+50/5+86/1 Final Plot no 69+70+71 demarcated by its boundaries (latitudee and longitude of the end points) 12.00 M. WIDE ROAD to the North P.NO.72 to the South P.NO.76&77 to the East 9.00 M. WIDEROAD to the West of Division CHANDASHIL village CHANDASHItaluka NASHIK District NASHIK PIN422003 admeasuring 837.87 sq.mts. Area being developed by MR. ARVINDBHAI B. RAKHOLIYA Sir, /we HITESH RAKHOLIYA have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of the SHIV PLAZA situated on the plot bearing Survey no. 48/3+48/4+50/1+3/2 50/1+3/3+50/2+50/4+50/5+86/1 Final Plot no 69+70+71 of Division CHANDASHl village CHANDASHI taluka NASHIK District NASHIK PIN 422003 admeasuring 837.87 sq.mts. Area being developed by MR. ARVINDBHAI B. RAKHOLIYA 1 . Following technical professionals are appointed by Owner/Promoter (i) M/s/Shri / Smt HITESH RAKHOLIYA as L. S. / Architect; (ii) M/s/Shri / Smt HITESH RAKHOLIYA as Structural Consultant (ii) M/s/Shri/ Smt as MEP Consultant (iv) M/s/ Shri/Smt as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date ofthis certificate, the Percentage of Work done for each of the building/ Wing of the Real Estate Project as registered vide number P51600015770 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building/ Wing and Overall Percentage of the work done with respect to each Building/Wing is detailed in the Table B. Table A Sr.No Tasks/Activity Percentage 1 Excavation 100 % 2 Plinth 100 % 3 RCC-5 number of Slabs of SuperStructure 100 % 4 Masonry/ walls 100 % 5 Internal Plaster 100 % 6 External Plaster, elevation- In progress 100 % 7 Flooring within Flats / Premises 100 % 8 Door and Windows to each of the Flat/ Premises 100 % 9 External plumbing down take lines,CP/ Sanitary Fitting within the Flats/ Premises- Electrical 100 % Fitting within the Flats/ Premises, 10 Electrical switches and wiring inside apartment 100 % 11 Painting 100 % 12 Staircases, Lifts Wells and Lobbies at eachFloor level connecting Staircases and LiftsOverhead and 100 % Underground Water Tanks 13 Completion of terraces with waterproofing of the 100 % Building 14 Installation of lifts 100 % 16 Fire Fighting Fittings and Equipment's as per CFO NOC NA 17 Electrical fittings to Common Areas, water 100 % pumps,electro mechanical equipment's 18 Finishing of entrance lobby/s, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain 100 % Occupation /Completion Certificate TABLE B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Proposd Percentage of Details Amenities | (Yes/No) Work done O Side margin pavement YES 100% AS PER PLAN 2 Water Supply OBTAINED BY YES 100% NMRD 3 Sewerage (chamber, sewage lines), YES 100 % AS PER PLAN Storm Water Drains 4 Landscaping & Tree Planting YES 100% AS PER PLAN 5 Common area Lighting YES 100% AS PER PLAN 6 Water conservation, Rain water YES 100% AS PER PLAN harvesting Fire protection and fire safety NO NA NA requirements 8 Electrical meter room, sub station, receiving station NO NA NA Yours Faithfully HITESH RAKHOLIYA of L. S. / Architect HITESH RAKHOLIYA (Licenseno. 558) Engineer Reg..s58