Cell : 9422247125 SAGAR S. SHAH E-mail : er.sagarshah@gmail.com B.E.(Givil) AMIE 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 005 Date : ENGINEER'S CERTIFICATE (FORM 2) Date:27 /12/2017 To, M/S Yogeshwar Realty Shop no.3&4, Rajkamal Residency, Opposite Burkule lawns, Kamathwade, Nashik 422OO9 Nashik Subject: Certificate of Cost Incurred for Development of SHIVALIK SKy APARTMENT lor construction of 1 building situated on the pl,ot bearing Survey No.9o7/2/l plot tto. 2+3/A+2+31B, demarcated by its bound-aries ( latiude ani longitude or /A, irre end points) Plot no. 1 to the North, plot no 2+g/c to the s""it, Layout of Adj. 9O7/part to the East, 18.O Meter wide D.P. Road to the west, of Division Nashik, S. no Village Nashik, Taluka Nashik, District Nashik, plN - 422009 admeasuring Mtrs. area being deveicped b1- M/S yogeshwar Realty. lool.oo Sq. Ref: MahaRERA Registraticn Number Sir, I trr' Sagar S. Shah have undertaken assignment of certilying Estimated Cost for the subject Real trstate Project proposed to be registered under Meninpne, being 1 Building situated on the plot bearing Survey No. goil2lllA, plot iisjrr*z+3/8, Division of Nashik, village Nashik, Taluka Nashik, District Nashik,"i.prN - 422t09 admeasuring 1OO1.OO Sq. Mtrs. area being developed by M/S yogeshwar Realty. Following technical professionals are appointed by owner / promoter :- (i) Shri. ASHOK JAMDAR as L.S. / Architect; (ii) Shri. PRASANNA BHORE as Structural Consultant 2. we have estimated the cost of the compretion to obtain occupation certificate/ completion certificate, of the civil, MEp and Al1ied works, tte Building of the project' our estimated cost calculations are based on the ofDrawings/p1ans made available to us for the project under reference by the Develope. .r.1a corr"rrtants and the schedule of items a,d quantity ror the entiie work as carcurated by Er. sagar S. shah quantity surveyor" appointed by Developer/trngineer, and the assumption of the cost of material, labour and other inputs made ty d"eveloper, ..rJ trr" site inspection carried out by us. 3. we estimate Total trstimated Cost of compietion of the building of the aforesaid project under reference as Rs. 4,s3,2s,ooo/- (rn words Rupees Four crores Fifty Three Lakhs T\renty Five Thousand only) (Total of rable A and B). The estimatei Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of_obtaining occupation certificate completion for the building from the Nashik Municipal Corporation being /the planning Authority certificate under whose.jurisdiction the aforesaid project is being implem"ented. \ d")- 4. The trstimated Cost Incurred tiil date is calculated at NIL (Tota1 of Table .A, and B . Tr:e amount of trstimated Cost Incurred is calculated on the trstimated Cost. base of arnoun: o: To:a: 5. The Balance cost of completion of the civii, Mtrp and A-11ied rvorks of the BuilciLng oi the-subject project to obtain occupation certificate compleiion / Municipal corporation (pranning Authority) is estimatei certrllcate from )3sn1t< (Total ar-Rs. +,s3,2s,ooo/- of Table A and B). I certify that the cost of the civil, MEp a''d allied work for the aforesard project as completed on the dare of this certificate is as given in g i"rn.*. Table a -J , TABLE A Building called SHIVALIK SKy APARTMENT. 1 building Sr. No. Particulars Amounts I Total trstimatecl co ts on 27 / 12/2017 date of Registration is l 2 jost rncurred as on 27 / 12 / 2Ol7 0 based on the Estimated cost) .) ^ uul1c lrl rcl'cenlage /y ur Oo/o as Percentage of the estimated costi 4 Ja_lance Cost to be Incurred Rs. qEe,rspo% Based on Estimated Cost) 5 lost Incurred on Rdditffi Nil 27 / 72 / 2017 not included in the Estimated Cost Annexure A) TABLE B Total trstimated cost of Gt..r,at A A"te."al elopment Works including amenities and aciiities in the layout as on 2Z /1,2 /201,7 date of gistration is incurred as on Z7 / lZ / 2At7 sed on the Estimated cost) 4-s" / Cell : 9422247125 SAGAR S. SHAH E-mail : er.sagarshah@gmail.com B.E.(Givil) AMIE 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 005 Date : ork done in Percentage s Percentage of the estimated cost) alance Cost to be Incurred Based on Estimated Cost) ost Incurred on Additional /extra tterns as on 27 / 12 /2017 not included in he Estimated Cost (Annexure A) Yours FaithfuJly a\SS ER. SAGAR S. SHAH Signature of Engineer * Note 1' The scope of work is to complete entire Re.al Estate project as per drawings from time to time so as to obtain occupation Certificate approved f compretlon certificate. 2' As this is an estimated cost, any deviation in quantity required for development Real estate Project will result in amendment oi the of the l.i"i l.'"".."a/to be incurred. 3' A11 components of work with specilications are indicative ald not exhaustive. Annexure A List of Extra / Additional Items executed with Cost (which were not part of the original trstimate of Total Cost) NIL