SHREEDIP ASSOCIATES Office: 2, Golden Terrace Apartment. Near Charwak Chauk, ARCHITECT & INTERIOR DESIGNER Indira Nagar. Nashik. Ph 0253-2393774. E-mal shreedipassociales@yahoo com Ref Date Annexure A FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (Period Ended 31/12/2025) Date:19/01/2026 To, SHRIPAD VINAYAK THOMBRE Nashik, MAHARASHTRA, 422009 Subject: Certificate of percentage of Work of completion of construction work of SHRI VITTHALRESIDENCY having MahaRERA Registration Number P51600014806 (Only Applicable after project Registartion) being developed by SHRIPAD VINAYAK THOMBRE Sir. IWe DEEPALI ACHARYA THOMBARE have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of SHRI VITTHALRESIDENCY having MahaRERA Registration Number P51600014806 (Only Applicable after project Registration, being developed by SHRIPAD VINAYAK THOMBRE) Based on Site Inspection, with respect to Layout / each of the BuildingWing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table Aherein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/BuildingWing Number: SHRI VITTHALRESIDENCYWING A Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2 (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 Plinth, 100.00 Stilt Floor 100.00 6 Slabs of Super Structure 100.00 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 7 Flats/Premises Sanitary Fitting within the Flat/Premises 100.00 Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) Staircases, lifts Wells and Lobbies at each Floor level Overhead and 100.00 Underground Water Tanks 100.00 10 External plumbing and external plaster, elevation, completion of teraces with waterproofing of the Buildingwing. 100.00 11 installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fttings, mechanical environment/CRZ NOC, equipment, to entrance lobbyls,compliance to conditions ofof plinth protection,paving Riuildinto areas appurtenant to Compound and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A LayoutBuildingWing Number: SHRI VITTHALRESIDENCYMWING B Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2 (3) 1 Excavation 100.00 0.00 2 Basements (if any) 0.00 3 Podiums (if any) 4 Plinth, 100.00 5 Stilt Floor 100.00 20.00 6 Slabs of Super Structure 7 Internal walls, Internal plaster, Floorings, Floors and windows within 20.00 Flats/Premises 8 Sanitary Fitting within the Fla/Premises 0.00 Staircases, lifts Wells and Lobbies at each Floor level Overhead and 0.00 Underground Water Tanks external plaster, elevation, completion of terraces with andBuildingwing 0.00 10 External plurthe waterproofing Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 11 |CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Ming, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement ofl Sale. Any other activities. Table B-Common Areas (Internal and External Development Works) in respect of Registered Phase / Project Number) Percentage of Actual Details Sr.No Common areas and facilitles ls Available (Yes / No) Work Done (As on date of the Certificate) (3) (4) (5) (1) (2) 0.00 NA Internal Roads & Footpaths No 1 AS PER Yes 50.00 SANCTION 2 Water Supply PLAN A WING No 50.00 3 Sewerage (Chamber, Lines, Septic Tank, STP) COMPLETED 0.00 NA Storm Water Drains N 4 AS PER Yes 50.00 SANCTION 5 Landscaping &Tree Planting PLAN 0.00 NA Ng 6 Street Lighting 0.00 NA No 7 Community Buildings 0.00 NA Treatment And Disposal Of Sewage And Sullage Water No 8 0.00 NA NG 9 Solid Waste Management And Disposal NA No 0.00 10 Water conservation /Rain water harvesting NA No 0.00 11 Energy managemcnt 50.00 A WING No COMPLETED 12 Fire protection and fire safety requirements AS PER Yes 50.00 Electrical meter room, sub-station, receiving station SANCTION 13 PLAN 50.00 A WING Space No COMPLETED 14 |Aggregate area of recreational Open 0.00 NA No 15 Open Parking Yours Faithfuly thoor Propictc:THOMBARE of ACHARYA Signature & Name DEEPALI L.S/ Architect (CA/2000725668) Date of Certificate: Agreed and accepted by: Signature of Promoter THOMBRE Name: SHRIPAD VINAYAK Date: