SAGARS. SHAH B.E.(Civil) l/l.l.E.,F.l.V. Cell : 9422247125 F .27433 E-mail : er.sagarshah@gmail.com r Approved Valuer r Consulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422005 FORM - 2 ENG!NEEtrS CERTIFICATE Date:2310712O2L To, Shivpooja Buildcon Flat No. 7, Madhuban Apartment, Ambad Link Road, Prasad Nagar, CIDCO, Nashik - 4220L0 Subject: Certificate of Cost lncurred for Development of SAI SHRADDHA APARTMENT for Construction Work of 1 Building, situated on Plot No. 24+25+25 bearing S.No. 32l1,l + L2l2 demarcated by its boundaries (latitude and longitude of the end points) S.No. 32/10 to the North, Colony to the South, Plot No. 23 to the East, Colony Road to the West of Division Nashik, Village Makhmalabad, Taluka Nashik, District Nashik, PIN 422003 admeasuring 7L7.05 Sq. Mtrs. Area being developed by SHIVPOOJA BUIIDCON. Ref: MAHARERA Registration Number P51600014819. Sir, l, Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the SubjeA Real Estate Project registered under RERA, being 1 Building named SAI SHRADDHA APARTMENT, situated on Plot No. 24+25+26 bearing S.No. 32lt7- + t2l2 of Division Nashik, Village Makhmalabad, Taluka Nashik, District Nashik, PIN 422003 admeasuring 717.05 Sq. Mtrs. Area being developed by SHIVPOOJA BUIIDCON. Following technical professionals are appointed by Owner / Promoter:- (i) Mr. Ashok N. Jamdar as Licenced Engineer; (ii) Mr. Ashok N. Jamdar as Structural Consultant G) il {< F-2? 433 S 1. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civi!, MEP and AIIied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building SA! SHRADDHA APARTMENT of the aforesaid project under reference as { 2,11,22,6631- (tn words Rupees Two Crores Eleven Lakhs Twenty Two thousand Six Hundred And Sixty Three Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipal Apartment being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred till date is calculated at T 2,11,22,663/- (Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civi!, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated at Nil (Total of Table A and B). 5. I certifu that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: s A Valuer * F-27{.33 S TABTE -A SAI SHRADDHAAPARTMENT Sr. No. Particulars Amounts L Total Estimated cost of the building/wing as on 23/071202L < 2,LL,22,653 Cost lncurred as on 23lo7l2O2L 2 < 2,tL,22,663 (based on the Estimated cost) Work done in Percentage 3 LOOo/o (as Percentage of the estimated cost) Balance Cost to be lncurred 4 NlL (Based on Estimated Cost) Cost lncurred on Additional/ Extra ltems as on 23/07l2O2Lnot 5 NIL included in the Estimated Cost (Annexure A) TABTE -B Building called SAI SHRADDHA APARTMENT Sr. No. Particulars Amounts Total Estimated cost of the lnternal and Externa! Development L Works including amenities and Facilities in the layout as on NIL 23lO7l2i2t 2 Cost incurred as on 2310712021 (based on the Estimated cost) NIL 3 Work done in Percentage (as Percentage of the estimated cost) N!L 4 Balance Cost to be lncurred (Based on Estimated Cost) N!L 5 Cost lncurred on Additiona! / Extra ltems as on 2310712021 not NIL included in the Estimated Cost (Annexure A) s.s # \a\ue't r-t1 {jr i/ AS Yours Faithfully N C onsu lting r"lv,t EngtnSer , Approred Valuer {< F.2t !,33 ER. SAGAR S. SHAH SH + Note 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Realestate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra lAdditional ltems executed with Cost (Which were not parts of the original Estimate of TotalCost) Ntt