DmlCOM mUCTURAl CONSUlTANTS FORM - 2 (see Regulation3) ENGINEER'S CERTIFICATE (TO be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date: 16/05/2018 To, The SHAIKHPRAVEENGAMIRAND OTHER Subject: Certificate of Cost Incurred for Development of (SHAIKH PRAVEENGAMIRAND OTHER)Construction work of 1 of building 1, wing(s) of the Single Phaseof the project (Maha Rera Registration Number) situated on the Plot bearing C.N. no/CTS no./S.No./Final Plot No.9+10 demarcated by its boundaries (latitude and longitude of the end POints)7.5 M road to the North P.No. 70 & 71 to the South P.No.73& 74 to the East P.No.72to the West of Division Nashlk East Village Wadala, Tal- Nashik, Dist-Nashik, Pin No.422101.Admeasuring 444.22 sq.Mts. area being developed by SHAIKHPRAVEENGAMIRAND OTHER Ref: MahaRERA Registration Number _ Sir, I/We Bhanuvilas Bhawsar have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA,being work of 1 of building 1, wing(s) of the Single Phaseof the project (Maha Rera Registration Number) situated on the Plot bearing CN. no/CTS no./S.No./Final Plot No.9+10 demarcated by Its boundaries (latitude and longitude of the end points) 7.5 M road to the North P.No. 70 & 71 to the South P.No.73 & 74 to the East P.No.72 to the West of DiVisionNashik East Village Wadala, Tal- Nashik, Dist-Nashik, Pin No.422101.Admeasuring444.22 sq.Mts. area being developed by SHAIKHPRAVEENGAMIRAND OTHER ....-'!OS:::14='=S==U:::::I."'" "v~ 1! Following technical professionals are appointed by Owner/Promoter :_ ~ (i) M/S/Shri. Saurabh Ravi Amrutkar as L.S./Architect '0 ~ ~ (ii) M/S/Shri. Bhanuvilas Bhawsaras Structural Consultant -?d- <, ..__/.$ (iii) M/S/Shri/Smt as MEPConsultant =IS WQ')'Cl'>- (iv) M/S/Shri/Smt as Quantity Surveyor* ~::::a:::~ 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certification, of the Civil, MEPand allied works, of the Building(s) of the project. our estimated cost calculationsare based on the drawings/plans made available to us for the project under reference by the Developer and consultants uhlk Offlc. : 'Avdhool Aadhar'" Opp HOlelVlhar. Old Gangapur Naka, Nashd<' 422 005. Tel No 0253,2314995. 2571096 Email. design@deltacomcpl com un. Office: 'Laxminlara Marker 214, '0' Wing. Dange Chowk. Ch.nc:nwad Pune, 411033 Tel No 0.20-27272335.Ema,l ,des.gn,pune@dellacomcpl.com and the schedule of items and quantity for the entire work as calculated by ______ Quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 1, 02, 34,650/- (Total of Table A and B). The estimated total cost of project is with reference to the Civil, MEPand allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(S) from the being the planning authority under whose jurisdiction the aforesaid project is being implemented. 3. The estimated Cost Incurred till date is calculated at Rs. 65,25,193/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of total estimated cost. 4. The Balancecost of Completion of the Civil, MEPand Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion certificate from (planning Authority) is estimated at Rs. 37,09,457/- (Total of Table A and B.) 5. I certify that the cost of the Civil, MEPand allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: Buildlng/Wing bearing Number or called _ Table A (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing as Rs. 1,02,34,650/- . on date of R~istratjon is 2 Cost incurred as on Rs. 65,25,193/- (based on the Estimated cost ) 3 War!