DElTACOM STRUCTURAL CONSUlTANTS FORM - 2 (see Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date: 21/12/2017 The SHAIKHPRAVEENGAMIRAND OTHER Subject: Certificate of Cost Incurred for Development of (SHAIKH PRAVEENGAMIRAND OTHER)Construction work of 1 of building 1, wing(s) of the Single Phaseof the project (Maha Rera Registration Number) situated on the Plot bearing C.N. no/CTS no.jS.No.jFinal Plot NO.9+10 demarcated by its boundaries (latitude and longitude of the end points) 7.5 M road to the North P.No. 70 & 71 to the South P.No.73 & 74 to the East P.No.72 to the West of Division Nashik East Village Wadala, Tal- Nashik, Dist-Nashik, Pin No.422101.Admeasuring 444.22 sq.Mts. area being developed by SHAIKHPRAVEENGAMIRAND OTHER Ref: MahaRERA Registration Number __; Sir, I/We Bhanuvilas Bhawsar have undertaken assignment of certifying Estimated Cost for the . Subject Real Estate Project proposed to be registered under NahaRERA,being work of 1 of building 1, wing(s) of the Single Phaseof the project (Maha Rera Registration Number) situated on the Plot bearing C.N. no/CTS no.jS.No./Final Plot No.9+10 demarcated by its boundaries (latitude and longitude of the end points) 7.5 M road to the North P.No. 70 & 71 to the South P.No.73 & 74 to the East P.No.72to the West of Division Nashik East Village Wadala, Tal- Nashik, Dist-Nashik, Pin No.422101.Admeasuring444.22 sq.Mts. area being ,~~~~s=... developed by SHAIKH PRAVEENGAMIRAND OTHER Following technical professionals are appointed by Owner/Promoter :_ ::at/)!!'to..~ ~,." 'St ~)~ ~~ Ci) M/SjShri. $aurabh Ravi Amrutkar as L.S./Architect ~ ~ ~ .. (ii) M/SjShri. Bhanuvilas Bhawsaras Structural Consultant ~ ~ .(iii) . M/S/Shri/S'mt as MEPConsultan ). n!lJ~~y. (iv) M/S/ShrijSmt as Quantity Surveyor~~~ 1. We have estimated the cost of the completion to obtain Occupation Certificate/ . Complenon Certification, of the Civil, MEPand allied works, of the Building(s) of the project . our estimated cost calculations are based on the drawings/plans made avallable ; to us for the project under reference by the Developer and i Nashik Office: "Avdhoot Aadhar" Opp. Hotel Vihar, Old Gangapur Naka, Nashik - 422 005. Tel No. : 0253 - 2314995, 2571096 Email: design@deltacomcpl.com Pune Office: "Laxmintara Market", 214, "0" Wing, Oange Chowk, Chinchwad, Pune - 411033. Tel No. : 020-27272335. Email: design.pune@deltacomcpl.com consultants and the schedule of items and quantity for the entire work as .':,,-,.' .-j calculated by Quantity Surveyor*. appointed by Developer/Engineer, and the assumption of the cost of material, labour and other lnputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building(s) of the. aforesaid project under.reference as Rs. 1, 02, 34,650/- (Total of Table A and B). The estimated total cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/completion certificate for the building(S). from the being the planning. authority under whose jurisdiction the aforesaid project is being implemented. ·3. The estimated Cost Incurred till date is calculated at (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of total estimated CO$t. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completiori . certificate from (planning Authority). is estimated at Rs. (Total of Table A and B.) 5. I certify that the cost of the Civil, ME,?and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below:· Building/Wing bearing Number or called _ Table A (To be prepared separately for each Building /Wing of the Real Estate Project) Sr. No Particulars Amounts 1 Total Estimated cost of the building/wing as Rs. 1,02,34,650/- . on date of Registration is 2 Cost incurred as on nil _(basedon the Estimated cost) 3 Work done in percentage nil (As percentage of the estimated cost) 4 Balance Cost to be Incurred nil (Based On Estimated Cost) 5 Cost incurred on additional/Extra Items nil As on not included in The Estimated Cost(Annexure A) Table B , '- ... - " (To be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulars Amounts· 1 Total Estimated cost of the Internal and Rs. Rs. 1,02,34,650/- External Development works including amenities and facilities in the layout as on date of Reolstretion is 2 Cost incurred as on (Based on the Estimated cost) 3 Work done in percentage (As percentage of the estimated cost) 4 BalanceCost to be Incurred (Based On Estimated Cost) 5 Cost incurred on additional/Extra Items As on not included in The Estimated Cost (Annexure A) . Yours faithfully, Bhavsar Bhanuvilas P. Structural Consultant Nn'iC. Stru. -41.