RAVI AMRUTKAR ASSOCIATES arc hit e c t u r e' lin t e rio r s I I and scap e ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money . from Designated Account) Date 19th DEC,2017 To, The SHAIKH PRAVEEN GAMIR AND OTHER Subject: Certificate of Percentage of Completion of Construction Work of1 No. of Building(s)/1Wing{s) of the SINGLE Phase of the Project [MahaRERA Registration Number] situated on the Plot bearing C:N. No/CTS No.lSurvey No.1Final Plot No. 9+10 demarcated by its boundaries (latitude and longitude of the end points)7.5 M ROAD to the North P NO .70 & 71 to the South P NO .73 & 74to the East P NO .72 to the West of Division NASHIK EAST Village WADALA Taluka NASHIK District NASHIK PIN 422 -101admeasuring 444.22sq.mts. area being developed by SHAIKH .PRAVEEN GAMIR[Promoter's Name] Sir, II We AR.SAURABH R. AMRUTKARhave undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of Completion of Construction Work of the 1 Building(s)1 1Wing(s) of the SINGLE Phase of the P-roject,situated on the plot bearing C.N. Nol CTS No.lSurvey No.lFinal Plot NO.9 + 1OofDivision NASHIK EAST village WADALA Taluka NASHIK District NASHIK PIN 422 -101 admeasuring 444.22 sq.mts. area being developed by SHAIKH PRAVEEN GAMIR + OTHER 1. Following technical professionals are appointed by Owner I Promoter:- (i) M/s/Shri/Smt AR.SAURABH RAVI AMRUTKAR as1.S.1 Architect; (ii) MIs IShri I Smt. DETLACOM(MR.BHANUVILAS BHAVSAR) as Structural Consultant. (iii) MIs IShri I Smt. NOT APPLICABLE as MEP Consultant (iv) MIs IShri I Smt. NOT APPLlCABlEas Site Supervisor Based on Site Inspection, Withrespect to each of the BuildinglWing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registered vide number _______ under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailedin Table B. +9 r-9766444333 con t act @ r a via m ru t k ar ass 0 cia t e s. com yeolekar m o t o c o I l e q e road,noshik-422005 i ore hit e c t.u rei in t e rio r s I Ion d S cop e TABLE-A Building /Wing Number1 (to be prepared separately for each Building /Wing of the Project) Sr. Tasks IActivity Percenta'ge of work No. done (2) (1) (3) 1 Excavation 0% 2 o number of Basement(s) and Plinth 0% 3 o number of Podiums 0% 4 Stilt Floor 0% 5 5 number of Slabs of Super Structure. 0% 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of 0% the Flat/Premises, 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises, 0% 8 Staircases; Lifts Wells and Lobbies at each Floor level connectlnp Staircases and Lifts, 0% Overhead and Underqround Water Tanks, 9 The external plumbing and external plaster, elevatio.n,completion of terraces with 0% waterproofing of the BUilding/wing, . ~ 1 10 Installation of lifts, water pumps, Fire Fighting . FiUin.gs~~d Equipment as per eFO NOe, Electrica]ifittings to Common Areas, electro,' mechanic!alequipment, Compliance to . 0% r I·', . conditions ofien¥ironment /CRZ NOe, Finishing lo entrance 16b~y/s, plinth protection, paving of . areas apPlJrteriaht'to ~uilding/wing,' Compound Wa!1and all oth~r requirements as may be , .u i' !X· .t "! r I}.. ',' '; : ';'. :+91-976644433:3 C 0 ~.t 9 {'f.t @j r? v i 0 m rut k 0 r 0 s S"O c i0 t ~ S.' com yeo I e k 0: r ! ~m0 I'0 ,eo II e 9 e roo d,n 0 s h I k - 4 2 2 0 0 5 . : ': i R A V I A M R U 'T K A R ASS 0 C I ATE S architecture interiors landscape required to obtain Occupation I Completion Certificate. '. TABLE-B Internal and External Development Works in respect of the entire Registered Phase. Sr. No. Common areas and Facilities, Proposed Percentage Details Amenities (Yes/No) • of Work (1) done (5) (2) (3) (4) : 1 Internal Roads & Footpaths NO 0% 2 Water Supply YES 0% 3 Sewarage (chamber, lines, YES 0% Septfc Tank, STP). , : 4 Storm Water Drains YES 0% Landscaping& Tree Planting. NO o ~o 6 Street Lighting NO 0% 7 ; Community Buildings NO I; :i 0%,. , " ! ;. I ; 'I' 8 :Treatment and disposal of : , i' ' : : NO 0% :sewage and sullage water. : 1 I " 9 '! Solid .Waste management & ;Disposal. . YES 0% 10 :Water conservation, Rain water .:harvesting.; , .. YES 0% 11 ;Energy . management: , NO 0%. i ',1. .: i . . II ' + 9 11- 9 7 6 6 4 4 4 ~ 3 3 . ; ~i p con t act @ r a v j m rut k a r a fl soc i OJt e s::. com yeo I e k ? r m a I a c 0 II e g e r 0 alld ,n a :5 h I k .:;4 2 2 0 0 5 I ! i! .. . RAVI AMRUTKAR ASSOCIATES architecture I interiors [ l o n d sc c p e 12 Fire protection and fire safety NO 0% requirements. 13 Electrical meter room, sub- YES 0% station, receiving station. 14 Others(Option to Add more). NO 0% Yours Faithfully, (License No. CAJ:75269/2017) +91-97664.44333 con t act@ r a via m rut k a r ass 0 c i ate s. com yeo I e k arm a I a coil e 9 e.r 0 ad, nos h i k- 4 2 2005 I