Form 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for. ,Withdrawal of Money from Designated Account) Date:30.07.2025 To, K B Rohamare Housing Private Limited, 25, Vitthal Charani, Opp Big Bazat, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize" having MahaRERA Registration Number: P51600014658 being developed by K B Rohamare Housing Private Limited. Sir, We Dhiraj Walunj & Shital Walunj have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of the "Manomay Nafures paradize" having MahaRERA Registration Number: P51600014658 being developed by K B Rohamare Housing private Limited. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate projecl I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. (Dhirai T. Walunj) E.enctt-Er/2oos/36699 Office No. 308, Business Court, In front of Indco Park Apartment, Govind Nagar, Nashik - 422 001 . Email : vastumitras@gmail.com Table A Layout/Building/Wing No Lily Studio Wiog- A, B, C & D 9r. No. Tasly'Activity Percentage of actual work done (As on 30.05.202s) (1) (2) (3) Excavation 100% 1. 2. Basements (if any) Podiums (If any) 100% 3. Plinth 100% 4 Stilt Floor 700% 5. 100% 6. Slabs of Super Structure Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% 7. Within Flats /Premises Sanitary Fittings Within the Flat/Premises 25% 8. 100% 9. ilur"r, LiJts VV"[t und Lobbies at each Floor level overhead and Underground Water Tanks 10. ilulpt.r-Uiog uttd external Plaster, Elevatiory completion of 50% terraces with waterproofing of the building/wing. 11. lnrtulutiott of liftt, Water Purnps, Fire Fighting Fittings and 25% Equipment as Per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/ s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities' Layout/Building/Wing No Daffodil Row Bungalow- 37 to 42 Sr. No. Tasly'Activity Percentage of actual work done (As on 30.05.202s) (1) (2) (3) 1. Excavation 700% 2. Basements (if any) a J. Podiums (If any) 4. Plinth 100% 5. Sti]t Floor 700% 6. Slabs of Super Structure 700% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 700% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion of 700% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipmen! Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby / s, plinth Protectior! paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 43to 48 ir. No. Tasly'Activity Percentage of actual work done (As on 30.06.2025) (1) (2) (3) 1. Excavation 700% 2. Basements (if any) J. Podiums (If any) 4 Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 700% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats / Prernises 8. Sanitary Fittings Within the Flat/Premises 700% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead ]00% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion of 100% terraces with waterproofing of the building/wing' 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 700% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/'Ntng, Compound wall and all other requirements as may be required to complete the project as pel specilications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 49 to 54 Sr. No. Tasly'Activity Percentage of actual work done (As on 30.06.2025) (1) (2) (3) 1. Excavation 700% 2. Basements (if any) 3. Podiums (If any) 4. Plinth 700% 5. Sti]t Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 700% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lilts Wells and Lobbies at each Floor level overhead 100% and Underground Water Tanks r--4t B.rRctt 200s/ 10. External plumbing and external Plaster, Elevatiory completion of 700% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and ]00% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protectiory paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Layofi/Building/Wing No Daffodil Row Bungalow- 31to 36 9r. No. Tasly'Activity Percentage of actual work done (As on 30.06.2025) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 3. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% and Underground Water Tanks 10 External plumbing and external Plaster, Elevatiory completion of 0% terraces with waterproofing of the building/wing. 11 Installation of Lifts, Water pumps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/ s, plinth Protectiory paving of areas appurtenant to Building/t{tng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. (Dhiraj T. Walunj) B,ARGH-CAl20OSl3669s Nf,* Table B Common Areas (Internal & External Development Works) in respect of the registered phase /project number Sr. No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yey'IlIo) Actual Work Done (As on 30.06.202s) (1) (2) (3) (4) (s) 1. Internal Roads and Yes 95% Footpaths 2. Water Supply Yes 50% 3. Sewerage (chamber, Lines, Yes 45% Septic Tank, STP) 4. Storm Water Drains No 50% 5. Landscaping &Tree Planting Yes B0% 6. Street Lighting Yes 00% 7. Community Buildings No 00% B Treatment and Disposal of No 25% Sewage and Sullage water 9. Solid Waste Management & No 00% Disoosal t0. Water Conservation/ Rain Yes 75% Water harvesting t1. Energy Management No 00% 12. Fire Protection and Fire No 00% Safety Requirements t,3. Electrical meter room, Sub- Yes 00% Statiory Receiving station 14. Gymnasium, Library, Art & craft Yes 75% Room, Sport Court, & Lawns t5. Amphitheater, Open Gy^, & Play Yes 95% Area, Jogging Track. 16. Swimming Pool, Activity Deck, Yes 75% Spa Room 17. Skating Area, Turff Cricket court Yes 100% 14. Others (Option to Add more) (Dhirai T. w u B.nncn-cn/zoo Authorlsed Sl9 Yours Faithfully DHIRAJ WALUNI (License No. B. ARCH- CA/2005/36699) Agreed and Accepted by: For, K B Rohamare Housing Private Limited Signafure of Promoter Name: Amit Ramesh Rohmare Date:30.07.2025