Ar. ShitalWaluni Ar. DhirajWaluni # +91 9890191058 # +91 901 1 4 3651 6 Reg No CA/2010i48551 Reg. No : CAi2005i36699 VASTUMITRA'S architectur€ o interior o landscape designers ARCHITECTS Form 1 (See Regulation 3) ARCHITECT'S CERTIFTCATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date:09.01..2026 To, K B Rohamare Housing Private Limited, 25, Vitthal Charani, Opp Big Bazar, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize" having MahaRERA Registration Number: P5L6000L4558 being developed by K B Rohamare Housing Private Limited. Sir, We Dhiraj Walunj & Shital Walunj have undertaken assignment as Architect/Licensed Surweyor of certifying percentage of Completion of Construction work of the "Manomay Natures Paradize" having MahaRERA Registration Number: P51600014658 being developed by K B Rohamare Housing Private Limited. Based on site Inspectiory with respect to layout/each of the building/wng of the aforesaid Real Estate project. I certify that as on the ciate of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. I Dhirai T. Walunj) B.nncH-tn/2oos/366se *,n,h.,S-*,, 0tfice No. 308, Business Court, ln lront of lrtdco Park Apartment, Govind Nagar, Nashik - 422 001. Email : vestumitras@gmail.com - Table A Layout/Building/Wing No Lily Studio Wing- A, B, C & D Sr. No. Tasly'Activity Percentage of actual work done (As on 31.:1.2.2025) (1) (2') (3) 1,. Excavation 700% 2. Basements (if any) J. Podiums (If any) 700% 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100o/. Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lilts Wells and Lobbies at each Floor level overhead 1,00% and Undergrouncl Water Tanks 10. External plumbing and external Plaster, Elevatioru completion of 50% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 25% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipmen! Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protection, paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 37 to 42 Sr. No. Tasly'Activity Percentage of actual work done (As on 37.12.202s) (1) (21 (3) 1. Excavation 100% 2_ Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 1.00% -100% 6. Slabs of Super Structure 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion of 1.00% terraces with waterproofing of the building/wing. 1L. Installation of Lilts, Water pumps, Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby / s, plinth Protection, paving of areas appurtenant to Building/lNing, Compound wall ancl all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 43 to 48 Sr. No. Tasly'Activity Percentage of actual work done (As on 31.12.202s) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) (Dhiraj T. Walunj) B.ARCH-CA 12005136699 ^*f,*N- Podiums (If anY) Slabs of Super Structure ffilaster, Floorings, Doors and Windows Within Flats /Premises Sut ituty Fittings Within the Flat/Premises bies at each Floor level overhead and Underground Water Tanks 100% | terraces with waterproofing of the building/wing' @umps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipmen! Compliance to conditions of environment / CRZ NOC' finishing to entrance Lobby/s, plinth Protectiory paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as Per specifications in agreem"@ Layout/Building/Wing No Daffodil Row Bungalow- 49 to 54 Tasly'Activity Percentage of actual r. No. work done (As on 31..12.2025) (2) (3) (1) 700% 1. Excavation ----------------- 2. Basements (if anY) J. @ 100% 4. Plinth 0% e Sttlt Flr., 50% 6. 100% 7. Internal Wa1ls, Internal Plaster, Floorings, Doors and W Within F1ats /Premises 100% & s at each Floor level overhead 700% 9. -ry= and Unclerground Water Tanks f Dhi .i Y trl-t..^:\ B. nnc n --cn/ 2 oo s/ 36699 Ir h,N$r Authorl5dd Signatory , 10. External plumbing and external Plaster, Elevatioru completion of 700% terraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps, Fire Fighting Fittings and 700% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protectioru paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 3L to 35 Sr. No. Tasly'Activity Percentage of actual work done (As on 31..12.2025\ (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. PIinth 100% 5. Stilt Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls, Internal Plaster, Floorings, Doors and Windows 0% Within Flats / Prernises 8. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion of 0% terraces with waterproofing of the building/wing. 11.. Installation of Lifts, Water pdmps, Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipmen! Compliance to conditions of environment / CRZ NOC, finishing to entrance Lobby/s, plinth Protectiory paving of areas appurtenant to Building/Wng, Compound wall and all other requirements as may be required to complete the project as per specifications in agreement of sale. Any other activities. t Dhirai T. Walunj) B.nncn-tn lzoosl366ee \'Nsr AuthM Signatory I a Table B registered phase Common Areas (Internal & External Development works) in respect of the /project number Proposed Percentage of Details Sr. No. Common areas and Facilities, Amenities (Yes[.{o) Actual Work Done (As on 31,.12.2025\ (2\ (3) (4) (5) (1) 1,. Internal Roads and Yes 95% Footpaths 2. Water Supply Yes 50% Sewerage (chamber, Lines, Yes 45o/o Septic Tank, STP) 4. Storm Water Drains No 50% 5. Landscaping &Tree Planting Yes 80% 6. Street Lighting Yes 00% 7. Community Buildings No 00% B. Treatment and DisPosal of No 25% Sewage and Sullage water 9. Solid Waste Management & No I ooz Disposal t0. VV"t"r C..*,*ation/Rain I Yes 15% Water harvesting I I t1. Energy Management No 00% t2. Fire Protection and Fire No 00% Safety Requirements t3. Elechical meter room, Sub' Yes 00% Station, Receiving station -t o/ 14. Gymnasium, LibrarY, Art & cra{t Yes lJ /O Room, Sport Court, & Lawns 15. Amphitheater, Open GY-, & PlaY Yes 95% Area, Jogging Track. t6. Swimming Pool, ActivitY Deck, Yes 15% Spa Room t7. Skating Area, Turff Cricket court Yes 100% t4. Others (Option to Add more) ffiil iT b.nn*t-cn/2oos/3669e X*tUr Yours Faithfully (Dhiraj T. llllalunj) B.ARCH-CA 12005136699 Authorlsed r,, n.,o rr$NS- DHIRAJ WALUNJ (License No. B. ARCH- CA/2005/36699) Agreed and accepted by: For, K B Rohamare Housing Private Limited CI N: U45 202MH201 0ftc203998 K.B.R0HAMAdE H0US[,t0 I ..'-TD. 4.!.louour.a,- Name: Amit Ramern o.r?ll::Jo* Designation: Director Date: 09.0L.2026 Place: Nashik