Ar. Dhirai Waluni 91 9890191058 # +91 901 14 36516 Reo. No": CA/2005/36699 architecture r interior r landscape designers ARCHITECTS Form L (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of project and for Withdrawal of Money from Designated Date:08.04.2025 To, K B Rohamare Housing Private Limited, 25, VitthalCharani Opp Big Bazan, College Road, Nashik 422005. Subject: Certificate of percentage of completion of work of "Manomay Natures Paradize"having MahaRERA Registration Number:P51. 4658being developed by K B Rohamare Housing Private Limited. Sir, WeDhiraj Walunj have undertaken assignment as Architect/Licensed of certifying percentage of Completion of Conshuction work of the"Manomay Natures Paradize" ing MahaRERA Registration Number:P51600014658being developed by K B Rohamare Housing Priv Limited. Based on site Inspectiory with respect to layout/each of the building/ of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percenta of work done for each of the building/wing of the Real Estate project under MahaRERA is as per ta A herein below.The percentage of the work executed with respect to each of the activity of the entire is detailed in table B. i (Dhrot Wolunfl E IRCH:cA/2oos/36699 hntqr luth66}6 S,d,r-. Office No. 308, Business Court, ln front of lndco Park Apartment, Govind Nagar, Nashik 422 001. Email : vastumitras@gmail.com Table A Layout/Building/Wing Nolily Studio Wing-A,B,C&D Sr. No. Tasly'Activity Percentageof acfual work done (As on 31.03.202s) (1) (2) (3) 1,. Excavation 100% 2. Basements (if any) J. Podiums (lf any) 100Yo 4. Plinth 100% 5. Stilt Floor 1,00% 6. Slabs of Super Structure 1.00Y, 7. Internal Walls,Internal Plaster, Floorings, Doors and Win dows 100% Within Flats /Prernises 8. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lifts Wells and Lobbies at each Floor level ov rhead 1.00% and Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru comp etion 50% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps,Fire Fighting Fittings Lnd 2s% Equipment as per CFO NOC, Electrical Fittings, Mechani ,cal EquipmentCompliance to conditions ofenvironment / CIRZ NOC finishing to entrance Lobby /s,plinthProtection, paving o f areas appurtenant to Building/Wing,Compound wall and all rther requirements as may berequired to complete the project rs Per specifications in agreement of sale. Any other activities. lDhtroJ r WolunJ) ts. AACH - CA / 2005 / 3669e *,,brM,,,, Layout/Building/Wing No Daffodil Row Bungalow- 37 to 42 Sr. No. Tasly'Activity Percentageof actual work done (As on 31.03.202s) (1) (2) (3) 1. Excavation 700% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 700% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Wir]dows 100% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 1.00% 9. Staircases, Lifts Wells and Lobbies at each Floor level ov$rhead 100% and Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion 100% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts, Water pumps,Fire Fighting Fittings and 700% Equipment as per CFO NOC, Electrical Fittings, Mechanical EquipmentCompliance to conditions ofenvironment / CRZ NOC, finishing to entrance Lobby/ s,plinthProtectiory paving of areas appurtenant to Building/Wng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 43 to 48 Sr. No. Tasly'Activity Percentageof actual work done (As on 31.03.202s) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (lf any) I un **"M_si Behcr.cnlzoos/366ee 4. Plinth 100% 5. Stilt Floor 700% 6. Slabs of Super Structure 1.00y. 7. Internal Walls,Internal Plaster, Floorings, Doors and Wir fows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level ovr rhead 100% and Underground Water Tanks 10. External plumbing and external Plaster, Elevation, comp etion 100% ofterraces with waterproofing of the buitding/wing. 11.. Installation of Lifts, Water pumps,Fire Fighting Fittings i nd 1.00% Equipment as per CFO NOC, Elechical Fittings, Mechan :al Equipment,Compliance to conditions ofenvironment / C RZ NOC, finishing to entrance Lobby/ s,plinthProtection, paving o areas appurtenant to Building/Wing,Compound wall and all t ther requirements as may berequired to complete the project rS per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bungalow- 49 to 54 Sr. No. Tasly'Activity Percentageof actual work done (As on 31.03.202s) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (lf any) 4. Plinth 100% 5. Stilt Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls,Internal Plaster, Floorings, Doors and Wir dows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 1.00Yo 9. Staircases, Lifts Wells and Lobbies at each Floor level ov :rhead 100% and Underground Water Tanks 10. External plumbing and external Plaster, Elevation, comp etion ofterraces with waterproofing of the building/wing. B, ARCH - CA 2005 36 36699 \$\r' Autn,$ileci Siqnatun ' 11. Installation of Lifts, Water pumps,Fire Fighting Fittings a. 1,00% Equipment as per CFO NOC, Electrical Fittings, Mechanical EquipmenfCompliance to conditions ofenvironment / CE