FORM - 21A [ see Maha-RERA order No. 5 of 2018 ] ENGINEER’S CERTIFICATE FOR QUATITY ASSURANCE (site supervisor's certificate - To be uploaded quarterly) To, Date:- 12 April 2019 The K. B. Rohamare Housing Pvt. Ltd., 25, Vitthal Charni, Opp. BIG Bazar, Collage Road, Nashik 422005. Quality Assurance Certificate (Certificate No. SA/04/19 for the quarter ending Mar-19) Subject : Certificate for quality of materials used and quality of Construction and workmanship for the Work of Manomay Natures Paradize No. of Building Six of the phase One of the Project situated on the Plot bearing Survey No. 553/A/554/A Final Plot No. 01 to 54 & Amenity Plot No. 55 & Open Space A,B,C,D demarcated by its boundaries Adj GAT no. 550 to the North Part of GAT No. 553/A & 554/A to the South GAT No. 551 & 552 to the East GAT No. 543 & 547 & 548 & 30Mtr Road to the West of Division Nashik Village Pimpari Saddruddin Taluka Igatpuri District Nashik PIN 422403 admeasuring 11998.04 sq.mts. area & Total of A+B+C+D & Open Space 1924.74 Sq.Mtr being developed by K. B. Rohamare Housing Pvt. Ltd. Reference: MahaRERA Registration No. P51600014658 Sir, I / We Amit Rohamare have undertaken an assignment of supervision of this real estate project. Our Responsibility: To carry out the work in accordance with the development approved permission and as plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. Material Testing: I / We, have applied following mandatory checks on the basic materials, used in the construction. i) Cement - It has been tested for its fineness, soundness, setting time, compressive strength etc. as per lS code 3535:1986 or as per other relevant lS/85/NBC code, or per industry standards and its results are within the permissible limits. ii) Coarse Aggregate - It has been tested, for deleterious materials, clay lumps, crushing value, impact value as per lS 2430:1986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. hv a G.uDay…. iii) Bricks/ Blocks - They have been tested for water absorption, crushing strength etc. as per lS 5454:1978 or as per other relevant IS/85/NBC code or as per industry standards and its results are within permissible limits. iv) Concrete / Ready-mix Concrete - It has been tested for compressive strength for various periods as 456:2000 and lS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v) Steel for Concrete - It has been tested as code or as per lS 2062:2011 or as per other relevant ls/Bs/NBC per industry standards for tensile strength, elongation and gauge length etc. and its results are within permissible limits. vi) Testing of Other Materials - Other materials like sand, crushed sand, floor tiles, fixtures and fittings, pipes and sanitary fittings etc. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the industry for a particular material. 2. Workmanship: - I / we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Electrical Materials and Workmanship: - Works of all the electrical wiring/ connections / lift installation electrical installations have been carried out under authorized /registered electrical engineer and its records has been maintained. The materials used conform to the relevant l.S/ B.S/ National Building codes or as per industry standards. 4. Structural2Engineer: - Promoters has engaged structural engineer Mr. Amit Rohamare having Licenses No. ___ having Cell No. +91 982 287 1903 The structural design of building(s) in this project has been done under his supervision. He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The formwork and concrete mix design have been done as per ls 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of Records: - Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. 6. Please specify materials or any other item of work which were not conforming to the standard specifications and which were not rejected. i) ____________________--NA--_______________________ ii) ________________________________________________ iii) ________________________________________________ Yours Faithfully, Signature of Engineer (Site Supervisor) Name: Mr. Amit Rohamare License No. (if any) ___ Phone No. +91 982 287 1903 Place: Nashik hv a G.uDay….