AYA ENEiINEERS I YOGIN ARVIND KULKARNI AMIT MADHUKAR SANAP M, Tech, (Structures) BE. (Civil) MS. (Civil) Chartered Engineer 'ADHAR" Bunglow, Kulkarni Colony, Sharanpur Road, Civil Structural Engineer Nashik-422 002, Mob : +9L 982291.2965, +9t 9850572648, Govt. Regd. Valuer E-ma i I : info@ ayaengineers.com I www.ayaengineers.com ENGINEER'S CERTIFICATE Dote:23/04/2024 To, K B ROHAMARE HSG. PW. LTD., 24.25, VIITHAL CHARANI APARTMENT OPP BIG BAZZAR, COLLEGE ROAD, Noshik 422005. Subfect: Cerllflcote of Cost lncurred for Developmenl of "Monomoy Nolure's Porqdlze", 13 bulldlng(s), 3 open spqces / 6 Wlngs (MqhqRERA Reglslrollon Number P51600014658) sltuoled on the Plot beorlng Gol no. 553A/ 554A, & Flnol Plot no. 1 to 54, Amenlty plot no. 55 & Open Spoces A,B,C,D ol Plmprl Soddruddln Tql. lgolpurl, Dlgl. Noshlk demorcoted by lls boundorles (lotltude 1 ?"40'40.62"N ond longllude 73"34'51 .52"E). Boundorles To ihe North : Adf. Gql no.550, To lhe Soulh : Gol no.553/A & Got no.554/A To the Eost : Gol no.551(P) & Got no.552(P). To lhe Wesl : Gol no.543,Gol no. 547, Gol no. 548 & 30.m wlde rood, Of Vllloge Plmprl Sqddruddln Tol. lgolpurl, Dlsl. Noshlk, Pln -422 403, odmeosurlng 13922.79 sq mlrs. oreo belng developed by K B ROHATTAARE HSG. PW. tTD. Ref : MohoRERA Registrotion Number P51600014658 Sir, l, Er. AMIT MADHUKAR SANAP hove undertoken ossignment of certifying Estimoted cost for the subject Reol Estote project proposed to be registered under MohoRERA, being Monomoy Nolure's Porodlze Buldllng(s) 05 number, Open spoces 3 number, 4 Wing(s) situoted on the plot beoring Got no. 553/A& SS4IA, ol plmprl Soddruddln Tol. lgolpurl, Dlst. Noshlk odmeosuring 13922.78 sq.mts. oreo beirrg developed by K B ROHA iARE HSc. PW. tTD Following technicol professionols ore oppointed by Owner / promoter :- 0 Ur. Dhhof Wolunf & Mrs. SheetolWolunf os L.S./ Architect ; (D Snri. Yogln Kulkornl os Structurol Consultont (riilSnri. Deepok Mlstry os MEP Consultont (iv)Sfrri. Bobqsoheb Thorql os Office Engineer We hove estimoted the cost of the completion to obtoin Occupotion Certificote/ Completion Certificote, of the Civil ond Allied works, of the Building(s) of the project. Our estimoted cost colculotions ore bosed on the Drowings/plons mode ovoiloble to us for the project under reference by the Developer ond Consultonts ond the Schedule of items ond quontity for the entire work os colculoted by Offlce Englneer Mr. Bobosoheb Thorol quontity surveyof oppointed by Developer/Engineer, ond the qssumption of the cost of moteriol, lobour ond other inputs mode by developer, ond the site inspection corried out by us. 3. We estimote Totol Estimoted Cost of completion of the building(s) of the oforesoid phose of the project under reference os Rs,7,24,02,315/- (ln words: Rupees Seven Crore Twenty Four Lokh Two Thousond Three Hundred & Flfleen Only) (Toiol of Toble A.l.l+ A.2.1+ A.3.1+ A.4.1+ A.5..l+4.6.1 ond B.l). The estimoted Totol Cost of project is with reference to the Civil ond ollied works required to be completed for the purpose of obtoining occupotion certificote / completion certificote for the building(s) from the Town Plonning office of Noshik District being the Plonning Authority under whose jurisdiction the oforesoid project is being implemented. The Estimoted Cost lncuned till dote is colculoted of Rg. 6,17,34,051/- (ln words: Rupees Slx Conore Sevenleen lokh Thlrly Four & Flfty () OneOnly) (Totol of Toble A.1.2+ A.2.2+A.3.2+ A.4.2+4.5.2+A.6.2ond B.2). The omount of Estimoted Cost lncuned is colculoted on the bose of omount of Totol Estimoted Cost. 5. The Bqlonce cost of Completion of the Civil, MEP ond Allied works of the Building(s) of the subject project to obtoin Occupotion Certificote / Completion Certificote from Noshik Regionol Town Plonning (plonning Authority) is estimoted of Rs. 1,06,68,2641- (ln wordt: Rupees one crore Slx Lokhg Slxty Elghl Thousqnd Two Hundred & Slxty Four Only) (Totol of Toble A.1.4 + A.2.4 + A.3.4+ A.4.4 + 4.5.4+A.6.4 ond B.4). 6. I certify thot the Cost of the Civil, MEP ond ollied work for the oforesoid Project os completed on the dote of this certificote is os given in Toble A ond B below: Toble A.l Bulldlng : Llly Studlo Aporlmenl (Locoled qt PIot no. l2 Ulllng A+8+61 (to be prepared separately for each Building Ailing of the Real Estate Project) Sr. Porticulors Amounts No I Totol Estimoted cost of the building os on 29105/2019 Rs.3,6?,58,31O/- dote of Registrotion is 2 Cost incuned os on 3010912023 Rs.3,21,64,563/ - (bosed on the Estimoted cost ) 3 Work done in Percentoge 87.02% (os Percentoge of the estimoted cost ) 4 Bolonce Cost to be lncuned Rs.47,?3,747 /- (Bosed on Estimoted Cost) 5 Cost lncuned on Additionol /Exko ltems os on Ntt 30/09/2023 not included in the Estimoted Cost (AnnexureA) 3 Toble A.2 Bulldlng : Uly Sludlo Aportmenl (locoted qt Plol no. l2 Wlng D) (to be prepared separately for each Building Ailing of the Real Estate Project) Sr. Porticulors Amounts No 1 Totol Estimoted cost of the building os on 2910512019 Rs.I,23,50,1OO/ - dote of Registrotion is 2 Cost incuned os on30lA9n023 Rs,l,12,47,585/- (bosed on the Estimoied cost ) 3 Work done in Percentoge 91.O7% (os Percentoge of the estimoted cost ) 4 Bolonce Cost to be lncuned Rs.l 1,02,515/- (Bosed on Estimoted Cost) 5 Cost lncuned on Additionol /Extro ltems os on NtI 30109/2023 not included in the Estimoted Cost (AnnexureA) Toble A.3 Bulldlng : Dqffodll Row Bunglows (Locoted ot Plol no. 37 lo 42) (to be prepared separately for each Building AMing of the Real Estate Project) Sr. Porticulors Amounts No I Totol Estimoted cost of the building os on 05112/2017 Rs,43,27,800/- dote of Registrotion is 2 Cost incurred os on30lO9l2O23 Rs.43,27,800/- (bosed on the Estimoted cost ) 3 Work done in Percentoge 100.00% (os Percentoge of the estimoted cost ) 4 Bolonce Cost to be lncurred Nrt (Bosed on Estimoted Cost) 5 Cost lncuned on Additionol /Extro ltems os on NIL 3010912023 not included in the Estimoted Cost (AnnexureA) 'o: