Ar. ShitalWaluni Ar. DhirajWalunj # +91 9890191058 # +91 90114 36516 Reg, No.: CA/201 0/48551 Reg. No.: CA/2005136699 architectur€ r interior r landscape des ARCHITECTS Form 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date:)1..04.2024 To, K B Rohamare Housing Private Limited, 25, VitthalCharani, Opp Big Bazar, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize"having MahaRERA Registration Number:P51600014658 being developed by K B Rohamare Housing Private Limited. Sir, I / \Ne DhirajWalunj & Shital Walunj have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Conshuction work of theManomay Natures Paradize"having MahaRERA Registration Number:P51500014658 being developed by K B Rohamare Housing Private Limited. Based on site Inspectiory with respect to layout/each of the building/wng of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. tDhlroj r WolunJ) 0ffice No. 308, Business Court, ln front of lndco Park Apartment, Govind Nagar, Nashik - 422 001 . Email : vastumitras@gmail.com Table A Layout/ Building/ Wing No Lily Studio Wing-A,B,C&D Sr. No. Tasly'Activity Percentage of actual work done (As on 31..03.20241 (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 100% 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 50% ofterraces with waterproofing of the building/wing. l't. Installation of Lifts,Water pumps,Fire Fighting Fittings and 2s% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CI?Z NOC, Finishing to entrance Lobby / s,plinthProtectior; Paving of areas appurtenant to Building/Wtng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any othet activities. tDhrr'oj r Wolunf) - cA / 2005 36699 ' Layout/Building/Wing No Daffodil Row Bunglow- 31to 35 Sr. No. Tasly'Activity Percentage of actual work done (As on 31.03.20241 (1) (2) (3) 1. Excavation 100% 2. Basements (if any) 3. Podiums (lf any) 4. Plinth 100% 5. Stilt Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 07o 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 0% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 07o Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/s,plinthProtectiory Paving of areas appurtenant to Building/Wng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. oo \ur Layout/Building/Wing No Daffodil Row Bunglow- 37 to 42 Sr. No. Tasly'Activity Percentage of acfual work done (As on 37.03.2024) (1) (21 (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 1.0070 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 700% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 1,00% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 100o/o ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby /s,plinthProtection, Paving of areas appurtenant to Building/Wing,Compound wall and all other requirements as may berequired to complete the project as Per specifications in agreement of sale. Any other activities. r Wolunfl Ara005/36699 Layout/Building/Wing No Daffodil Row Bunglow- 43 to 48 Sr. No. Tasly'Activity Percentage of acfual work done (As on 37.03.20241 (1) (21 (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100o/r 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 100% ofterraces with waterproofing of the building/wing. '1.00'/o 11,. Installation of Lifts,Water pumps ,Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/ s,plinthProtectiory Paving of areas appurtenant to Building/Wing,Compound wall and all other requirements as may berequired to complete the project as Per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bunglow- 49 to54 Sr. No. Tasly'Activity Percentage of acfual work done (As on 37.03.20241 (1) (2) (3) 1.. Excavation 100% 2. Basements (if any) J. Podiums (lf any) 4. Plinth 100% 5. Stilt Floor 0% 6. Slabs of Super Structure 50% 7. Internal Walls,lnternal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 0Yo ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/s,plinthProtection, Paving of areas appurtenant to Building/Wrng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. Table B Common Areas (Internal & External Development Works)in respect of the registered phase /proiect number Sr.No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yey'ItIo) Actual Work Done (As 31..O3.2024) 1) (21 (3) (4) (s) 1. Internal Roads and Yes 95% Footpaths 2. Water Supply Yes 50% J. Sewerage (chamber, Lines, Yes 45% Septic Tank, STP) 4. Storm Water Drains No 50Yo 5. Landscaping &Tree Planting Yes 80% 6. Street Lighting Yes 00% 7. CommunityBuildings No 00% 8. Treatment andDisposal of No 2s% Sewage andSullage water 9. Solid WasteManagement & No 00% Disposal [0. Water Conservation/ Rain Yes 15% Waterharvesting t1. EnergyManagement No 00% t2. Fire Protectionand Fire No 00% SafetyRequirements 13. Electrical meterroom, Sub- Yes 00% Statiory Receiving station 4. Gymnasium, Library, Art & craft Yes 75% Room, Sport Court, & Lawns 5. Amphitheater, Open Gy*, & PIay Yes 95% Area, Jogging Track. t6. Swimming Pool, Activity Deck, Yes 15% Spa Room t7. Skating Area, Turff Cricket court Yes 1.00% 14. Others (Option toAdd more) rlunfl Yours Faithfully Agreed and Accepted by: For, K B Rohamare Housing Private Limited K.B.R0HAMAitE H0U' ll,lti I',:-TD. -{'1 louoruo < DIRE0T0R signature of Promoter Name: Amit Ramesh Rohmare Date:01..04.2024