Ar. ShitalWaluni Ar. DhiraiWaluni # +91 9890191058 # +91 90114 36516 Beg, No.: CA/2010148551 Reg. No.: CAl2005/36699 architecture r interior r landscape designers ARCHITECTS Form 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Regiskation of Ongoing project and for Withdrawal of Money from Designated Account) Date:}l.04.2024 To, K B Rohamare Housing Private Limited, 25, VitthalCharani, Opp Big Bazar, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize "having MahaRERA Registration Number :P51600014658 being developed by K B Rohamare Housing Private Limited. Sir, I / \Ne Dhiraj Walunj & Shital Walunjhave undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Conskuction work of the Manomay Nafures Paradize "having MahaRERA Regishation Number:P51600014658 being developed by K B Rohamare Housing Private Limited. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. lDhlro.l r WolunJ) 8. ARCH - CA / 2005 I 36699 Auth 0ffice No. 308, Business Court, ln front of lndco Park Apartment, Govind Nagar; Nashik - 422 001. Email : vastumitras@gmail.com Table A Layout/ Building/Wing No Lily Studio Wing-A,B,C&D 9r. No. Tasly'Activity Percentage of acfual work done (As on 31,.\2.2023) (1) (2) (3) 1,. Excavation 100% 2. Basements (if any) J. Podiums (If any) 700'/" 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100y. 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Prernises 8. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion 50% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 25% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/ s,plinthProtection, Paving of areas appurtenant to Building/t{tng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. tDhtroj r Wolunfl B" ARCH - CA / 2005 / 36699 Layout/Building/Wing No Daffodil Row Bunglow- 37 to 42 Sr. No. Tasly'Activity Percentage of acfual work done (As on 31.12.2023) (1) (2) (3) 1. Excavation 1.00% 2. Basements (if any) J. Podiums (lf any) 4. Plinth 100% 5. Stilt Floor 700% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100Yo Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion 100% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments ,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/ s,plinthProtection, Paving of areas appurtenant to Building/Wtng,Compound wall and a1l other requirements as may berequired to complete the project as Per specifications in agreement of sale. Any other activities. (phhoj r wolunJ) ASClt- CA r 200s / 36699 Layout/Building/Wing No Daffodil Row Bunglow- 43 to 48 Sr. No. Tasly'Activity Percentage of actual work done (As on 37.12.20231 (1) (2) (3) '1.000/" 1. Excavation 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100'/. Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100y. 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 100% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 1.00% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby / s,plinthProtection, Paving of areas appurtenant to Building/WngCompound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. (Dhtruj ' Wolunj) clt- cA r 2005 / 36699 Layout/Building/Wing No Daffodil Row Bunglow 49 to 54 Sr. No. Tasly'Activity Percentage of actual work done (As on 37.12.2023) (1) (21 (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 0% 6. Slabs of Super Shucture 50% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 07o ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / Ct