Ar. ShitalWaluni Ar. DhiraiWalunj # +91 9890191058 # +91 90114 36516 Reg. No.: CA/201 0148551 Res. No": CA/2005/36699 architecture . interior r landscape designers ARCHITECTS Form 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Regishation of Ongoing project and for Withdrawal of Money from Designated Account) Date:01..04.2024 To, K B Rohamare Housing Private Limited, 25, VitthalCharani, Opp Big Bazan, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize"having MahaRERA Registration Number :P51600014658 being developed by K B Rohamare Housing Private Limited. Sir, I / We Dhiraj Walunj & Shital Walunjhave undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Conshuction work of theManomay Natures Paradize"having MahaRERA Registration Number:P5l6000L4658 being developed by K B Rohamare Housing Private Limited. Based on site Inspectiory with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. --^ffi"' (Dhtrul r WolunJ) 0fficeNo.308,BusinessCourt, lnfrontollndcoParkApartment,GovindNagar,Nashik-422001. Email :vastumitras@gmail,com Table A Layout/ Building/ Wing No Lily Studio Wing-A,B,C&D Sr. No. Tasly'Activity Percentage of actual work done (As on 30.09.2023) (1) (21 (3) 1,. Excavation 700o/. 2. Basements (if any) J. Podiums (lf any) 100% 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Shucture 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100,/. Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 50% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 25% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CIiZ NOC, Finishing to entrance Lobby/s,plinthProtection, Paving of areas appurtenant to Building/Wing,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. WolunJ) 2005 / 36699 Layout/Building/Wing No Daffodil Row Bunglow- 37 to 42 Sr. No. Tasly'Activity Percentage of actual work done (As on 30.09.2023) (1) (2) (3) 1. Excavation 100Yo 2. Basements (if any) J. Podiums (lf any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 100% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 1.00Yo Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CIiZ NOC, Finishing to entrance Lobby / s,plinthProtection, Paving of areas appurtenant to Building/Wing,Compound wall and all other requirements as may berequired to complete the project as Per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bunglow- 43 to 48 Sr. No. Tasly'Activity Percentage of actual work done (As on 30.09.2023) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion 700% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CPZ NOC, Finishing to entrance Lobby / s,plinthProtection, Paving of areas appurtenant to Building/WingCompound wall and all other requirements as may berequired to complete the project as per specffications in agreement of sale. Any other activities. .-, ,. ,:'fflunf] ' Ir ":tico !. r U., Jur W Layoutf Btilding/Wing No Daffodil Row Bunglow- 49 to 54 Sr. No. Tasly'Activity Percentage of acfual work done (As on 30.09.2023) (1) (21 (3) 1. Excavation 100% 2. Basements (if any) Podiums (If any) 4. Plinth 100% 5. Stilt Floor 0Yo 6. Slabs of Super Structure 50% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 0% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/ s,plinthProtection, Paving of areas appurtenant to Building/Wtng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bunglow- 31to 36 Sr. No. Tasly'Activity Percentage of acfual work done (As on 30.09.2023) (1) (2) (3) 1. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100Yo 5. Stilt Floor 0% 6. Slabs of Super Structure 507o 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevatiory completion 0% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/s,plinthProtection, Paving of areas appurtenant to Building/WingCompound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. fdotunJ) 2005 / 36699 Table B Common Areas (Internal & External Development Works)in respect of the registered phase /project number Sr.No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yey'I.,lo) Actual Work Done (As 30.09.2023) 1) (2) (3) (4) (s) 1. Internal Roads and Yes 95% Footpaths 2. Water Supply Yes 50Yo J. Sewerage (chamber, Lines, Yes 4s% Septic Tank, STP) 4. Storm Water Drains No 50% 5. Landscaping &Tree Planting Yes 80% 6. Street Lighting Yes 00% 7. CommunityBuildings No 00% 8. Treatment andDisposal of No 25% Sewage andSullage water 9. Solid WasteManagement & No 00Yo Disposal r0. Water Conservation/ Rain Yes 15% Waterharvesting 11. EnergyManagement No 00% t2. Fire Protectionand Fire No 00% SafetyRequirements t3. Electrical meterroom, Sub- Yes 00Yo Station, Receiving station t4. Gymnasium,Library, Art & craft Yes 75% Room, Sport Court, & Lawns [5. Amphitheater, Open Gy-, & Play Yes 95% Area, Jogging Track. t6. Swimming Pool, Activity Deck, Yes 15% Spa Room t7. Skating Area, Turff Cricket court Yes 100% 4. Others (Option toAdd more) ,g Yours Faithfully :i,irili"rli . "':1,1i-i i) ..:i*;"i ' -. DHTRAJ \$V *Orrr'l \ ( (License No...................) Agreed and Accepted by: For, K B Rohamare Housing Private Limited K.B.HOHAMAilE HOUSING I '.!.T0. + '1 '!,orr'owo' < DiREcToR signature of Promoter Name: Amit Ramesh Rohmare Date:01..04.2024