Ar. ShitalWaluni Ar. DhirajWaluni # +91 9890191058 # +91 90114 36516 Beg, No.: CA/2010148551 Reg. No.: CA/2005/36699 architectur€ r interior r Iandscape designers ARCHITECTS Form 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing project and for Withdrawal of Money from Designated Account) Date:01..04.2024 To, K B Rohamare Housing Private Limited, 25, VitthalCharani, Opp Big Bazar, College Road, Nashik 422005. Subject: Certificate of percentage of completion of construction work of "Manomay Natures Paradize"having MahaRERA Registration Number:P516ffi014658 being developed by K B Rohamare Housing Private Limited. Sir, I / WeDhiraj Walunj & Shital Walunj have undertaken assignment as Architect/Licensed Surveyor of certifying percentage of Completion of Construction work of theManomay Natures Paradize"having MahaRERA Registration Number:P5l600014558 being developed by K B Rohamare Housing Private Limited. Based on site Inspection, with respect to layout/each of the building/wing of the aforesaid Real Estate project. I certify that as on the date of this certificate, the percentage of work done for each of the building/wing of the Real Estate project under MahaRERA is as per table A herein below.The percentage of the work executed with respect to each of the activity of the entire phase is detailed in table B. ti.!hnr:J r rr*golunl) ."-,,:5;ff--' Office No. 308, Business Court, ln front of lndco Park Apartment, Govind Nag4 Nashik- 422 001. Email : vastumitras@gmail.com Table A Layout/ Building/Wing No Lily Studio Wing-A,B,C&D Sr. No. Tasly'Activity Percentage of acfual work done (As on 30.06.2023) (1) (2) (3) 1. Excavation 1O0o/. 2. Basements (if any) J. Podiums (lf any) 700% 4. Plinth 100% 5. Stilt Floor 1.00% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 25% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 50Yo ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 25% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments ,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/s,plinthProtectiory Paving of areas appurtenant to Building/Wing,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. :.,'lr ".",i.1i ll bN-'' Layout/Building/Wing No Daffodil Row Bunglow- 37 to 42 3r. No. Tasly'Activity Percentage of actual work done (As on 30.06.2023) (1) (2) (3) 1,. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 700% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 700% ofterraces with waterproofing of the building/wing. ']..00'/, 11.. Installation of Lifts,Water pumps,Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CRZ NOC, Finishing to entrance Lobby/s,plinthProtection, Paving of areas appurtenant to Building/Wrng,Compound wall and all other requirements as may berequired to complete the project as Per specifications in agreement of sale. Any other activities. Ua!unJ) r0*5 / 36699 Layout/Building/Wing No Daffodil Row Bunglow- 43 to 48 Sr. No. Tasly'Activity Percentage of acfual work done (As on 30.06.2023) (1) (2) (3) 1.. Excavation 100% 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 100% Within Flats /Premises 8. Sanitary Fittings Within the Flat/Premises 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 100% Underground Water Tanks 10. External plumbing and external Plaster, Elevatioru completion 100% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps,Fire Fighting Fittings and 100% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments,Compliance to conditions ofenvironment / CI?Z NOC, Finishing to entrance Lobby/ s,plinthProtection, Paving of areas appurtenant to Building/lNng,Compound wall and all other requirements as may berequired to complete the project as per specifications in agreement of sale. Any other activities. Layout/Building/Wing No Daffodil Row Bunglow- 49 to 54 5r. No. Tasly'Activity Percentage of acfual work done (As on 30.06.2023) (1) (2) (3) 1. Excavation 1000/, 2. Basements (if any) J. Podiums (If any) 4. Plinth 100% 5. Stilt Floor 07o 6. Slabs of Super Structure 50Yo 7. Internal Walls,Internal Plaster, Floorings, Doors and Windows 0% Within Flats /Premises B. Sanitary Fittings Within the Flat/Premises 0% 9. Staircases, Lifts Wells and Lobbies at each Floor level overhead 0% Underground Water Tanks 10. External plumbing and external Plaster, Elevation, completion 0% ofterraces with waterproofing of the building/wing. 11. Installation of Lifts,Water pumps ,Fire Fighting Fittings and 0% Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipments ,Compliance to conditions ofenvironment / CI