(To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: -09/04/2019 To, The K. B. Rohamare Housing Pvt. ltd. , 25, Vithal Charni, Opp. BIG Bazar, Collage Road, Nashik - 422005. Subject: Certificate of Percentage of Completion of Construction Work of "ManomayNature's ParadizePhase 1."13 No. of Building(s)/06Wing(s)tTypes of the First Phase of the Project [MahaRERA Registration Number:- P51600014658] situated on the Plot bearing Gat No. 553/A1554/A&Final·Plot No01 to 54. Amenitv PlotNo.55 & Open Spaces A,B,C,D demarcated by its boundaries (latitude and longitude of the end points) Adj. Gat No. 550 to the North .Part of Gat No. 553/A& 554/A to the South Gat No. 551 & 552 to the East Gat No.543&547&548 & 30 M WIDE ROAD to the West of Division Nashik. VillagePimpri Saddruddin Taluka Igatpuri District Nashik PIN 422403 admeasuring 11998.04 sq.mts. plot area & total of A+B+C+D OPEN SPACE AREA IS 1924.74 sqm & TOTAL OF OPEN SPACE & PLOTED AREA 1513922.78 SQM being developed by K. B. Rohamare Housing Pvt. Ltd. Sir, 1/ We Dhiraj Walunj & Shital Walunj have undertaken assignment as Architect ILicensed Surveyor of certifying Percentage of Completion of Construction Work of the "ManomayNature's ParadizeFirst Phase" of the Project, situated on the plot bearing Gat No. 553/A1554/A&Fiilal Plot No. 01 to 54, Amenity Plot No.55 & Open Spaces A,B,C.D of Division Nashik Village Pimpr! Saddruddin Taluka Igatpuri District Nashik PIN 422403 admeasuring 11998.04 sq.mts. plot area & total of A+B+C+D OPEN SPACE AREA IS 1924.74 sqm & TOTAL OF OPEN SPACE & PLOTED AREA IS13922.78 SQM being developed by K. B. Rohamare Housing Pvt. Ltd. 1. Followingtechnical professionalsare appointed by Owner I Promoter :- (i) M/s/ShrifSmt. Dhiraj Walunj as LS. I Architect; (ii) MIs IShri I Smt. Yogin Kulkarni as Structural Consultant (iii) Mis IShri I Smt. Oeepak Mistry as MEP Consultant· . (iv) Mis IShri I Smt. Nilesh Surde as Office Engineer Based on Site Inspection,with respect to each of the BuiidingIWingof the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildinglWing of the Real Estate Project as registeredvide numberP51600014658 under MahaRERA is as per table A herein below. The percentageof the work executed with respect to each of the activity of the entire phase is detailed i~ Table B. Office No. 308, Business Court, In front of Indco Park Apartment, Govind Nagar,Nashik - 422 001. Email: vastumitras@gmail.com TABLE-A Building Mling Number Lily Studio Wing-A,B&C (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) 1 Excavation 100% 2 01 number of Plinth 100% 3 o number of Podiums 0% 4 Stilt Floor slab 100% 5 3number of Slabs of Super Structure 100 % 6 Internal Walls, Internal Plaster, Floorings within ··25% Flats/Premises, Doors and Windows to each of tne Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases, and Lobbies at each Floor level connecting 100.% Staircases 9 The external plumbing and external plaster, elevation, 25% completion of terraces with waterproofing of the BuildinglWing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 2 Building lWing Number Lily Studio Wing-D (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done J1)_ (2) (3) 1 Excavation 100% 2 01 number of Plinth 100% 3 o number of Podiums 0% 4 Stilt Floor slab 100% 5 04 number of Slabs of SURer Structure 100% 6 Internal Walls, Internal Plaster, Floorings within 25% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 100% Staircases. 9 The external plumbing and external plaster, elevation, 25% completion of terraces with waterproofing of the BuildinglVVing. 10 Installation Electrical fittings to Common 0% Areas,Finishing to entrance lobbyls, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 3 TABLE-A Building !Wing Number Daffodil Row Bunglow 15 to 22 (to I:?eprepared separately for each Building !Wing of the Project)· Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) 1 Excavation 0% 2 01 number of Plinth .0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildinglWi ng. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 4 " », -. TABLE~A Building NVing Number Daffodil Row Bunglow- 37 to 42 (to be prepared separately for each Building Mling of the Project) . Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) 1 Excavation 100% 2 01number of Basement(s) and Plinth 100 % 3 o number of Podiums -- 4 First slab 100 % 5 Sloping roof 100 % 6 Brick work & cladding Brick work 100 % 7 External Plaster 100% 8 Internal Walls, Internal Plaster, Floorings within 100 % Flats/Premises, Doors and Windows to each of the Flat/Premises. 9 Sanitary Fittings within the Flat/Premises, Electrical 90% Fittings within the Flat/Premises. 10 Staircases and Lobbies at each Floor level connecting 100% Staircases. 11 The external plumbing and external plaster, elevation, 100 % completion ofterraces with waterproofing of the BuildinglWing. 12 Installation of Electrical fittings to Common Areass, 100% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant'to BuildingMiing, Compound Wall and all other requirements as may be required to obtain Occupation / Com_QletionCertificate. 5 «, -, TABLE-A Building !Wing Number Daffodil Row Bunglow - 43 to 48 (to be prepared separately for each Building !Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) . (2} . (3) 1 Excavation 100% 2 01number of Basement(s) and Plinth 100% 3 o number of Podiums ---..._-- 4 First slab 100 % 5 Sloping roof 100 % 6 Brick work & cladding Brick work 100 % 7 External Plaster 100% 8 Internal Walls, Internal Plaster, Floorings within 100% FlatS/Premises, Doors and Windows to each of the Flat/Premises. 9 Sanitary Fittings within the FlaUPremises, Electrical 100 % Fittings within the Flat/Premises. 10 Staircases and lobbies at each Floor level connecting 100% Staircases 11 The external plumbing and, completion of terraces with 100 % waterproofing of the BuildingIVVing_. 12 Installation of Electrical fittings to Common Areas, 100% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 6 ·TABlE-A Building Mling Number Daffodil Row BungloYi - 49 to.54 (to be prepared separately for each Building Mling of the Project) Sr. No. Tasks /Actlvity Percentage of work done (1) (2) (3) 1 Excavation 100% 2 01 number of Plinth 100% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. , 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor'level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildinglWing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 7 -', TABLE-A Building /Wing Number Aster Row Bunglow - 23 to 30 (to be prepared separately for each Building NVing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) . (~) 1 Excavation 0% 2 01 number of and Plinth 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises, 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 0% Staircases, 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildingJ\t\ling. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BLiildingJ\t\ling, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. ~ .. ~,~;.--., ~"".': .. (Dhri·r.j.X'r. tVcjunD :.8. Af\CH .•CJ).J 2005 I 36G99 ~q~ Authorised Signatory 8 .. TABLE·A Building /Wing Number Aster Row Bunglow - 31 to 36 (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) (3J 1 Excavation 100% 2 01 number of and Plinth 100% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor leyel connecting 0% Staircases; 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildinglWing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 9 '. TABLE·A Building I\Ning Number Orchid Bungalow - 01 to 03 (to be prepared separately for each Building NVing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) . 1 Excavation 2 01 number of Plinth 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the FlatiPremises. 8 Staircases and lobbies at each Floor level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildinglWing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 10 TABLE-A Building !Wing Number Orchid Bungalow - 04 to 05 (to be prepared separately for each Building !Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) 1 Excavation 2 01 number of Plinth 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor. level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BUildingNl/ing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BUilding!Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. 11 TABLE-A Building /Wing Number Orchid Bungalow - 06 to 08 (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) .: (3) 1 Excavation 2 01 number of Plinth 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/wing. 10 Installation of Electrical fittings to Common Areas, . 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. 12 TABLE-A Building MJing Number Orchid Bungalow ~ 09 (to be prepared separately for each Building /Wing of the Project) Sr. No. Tasks IActivity Percentage of work done (1) (2) (3) 1 Excavation 2 01 number of Plinth 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the . 0% Flat/premises. 7 Sanitary Fittings within the FlatlPremises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the . BuildinglWing. 10 Installation of Electrical fittings to Common Areas, 0% Finishing to.entrance lobby/s, plinth protection, paving of areas appurtenant to BuildinglWing, Compound Wall and all other requirements as may be required to obtain Occup_ation/ ComQletion Certificate. -, TABLE-A Building NVing Number Orchid Bungalow - 10 to 11 (to be prepared separately for each Building NVing of the Project) Sr. No. Tasks IActivity Percentage of work done (.1) (2) . (3) 1 Excavation 2 01 number of Plinth· 0% 3 00 number of Podiums 0% 4 Stilt Floor 5 02number of Slabs of Super Structure 0% 6 Internal Walls, Internal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the Flat/Premises. 7 , Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises. 8 Staircases and Lobbies at each Floor level connecting 0% Staircases. 9 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the BuildinglWing, 10 Installation of Electrical fittings to Common Areas, 0% Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingNVing, Compound Wall and all other requirements as may be required 'to obtain Occupation I Completion Certificate. 14 TABLE-8 Internal and External Development Works in respect of the entire Registered Phase of Project ManomayNature's Paradize Phase I. Sr. Common areas and Facilities, Proposed Percentage of Details No. Amenities (Yes/No) Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths Yes 75% 2 Water SupQly Yes 15% 3 Sewarage (chamber, lines, Septic Yes 15% Tank, STP). 4 Storm Water Drains No 10% 5 Landscaping& Tree Planting. Yes 40% 6 Street Ug_htiQ9 Yes 0% 7 Community Buildings No 0% 8 Treatment and disposal of sewage and No 0% sullage water. 9 Solid Waste management & Disposal. No 0% 10 Water conservation, Rain water Yes 15% harvesting. 11 Energy mana~ement No 0% 12 Fire protection and fire safety No 0% requirements. 13 Electrical meter room, sub-station, Yes 0% receiving station. 14 Gymnasium, Library, Art & craft Room, Yes 75% Sport Court, & Lawns 15 Amphitheater, Open Gym, & Play Yes 75% Area, Jogging Track. 16 Swimming Pool, Activity Deck, Spa Yes 0% Room 17 Skating Area, Turf Cricket court Yes 90% .... " :" Yours Faithfully, Signature & Name (IN BLOCK LETIERS) of L.SI Architect (License No ) 15' Lily Studio Wing ~A,B&C Sr. Appartment Type Carpet Area Number of no. (Sq.Mts.) Appartment 1 1BHK + 2 Covered Verandhas 48.23 08 2 1BHK + 2 Covered Verandhas 49.59 03 3 1 RK + Covered Verandhas 31.22 15 4 1BHK + 2 Covered Verandhas .48.26 04 5 1BHK + 2 Covered Verandhas 49.28 03 6 1 RK + Covered Verandhas 30.99 03 Lily Studio Wing~D Sr. Apartment Type Carpet Area Number of No. (in Sq.Mts) Apartment 1 1 BHK + 2 Covered Verandas 58.30·· 04 2 1 BHK + 2 Covered Verandas 62.12 04 16 Daffodil Row Bunglow - 15 to 22 Sr.No. Row Bunglow Typ.e Carpet Area Number of ( Sq.Mts) Appartment 1 2BHK 62.26 01 2 2BHK 62.32 06 3 2BHK 71.95 01 Daffodil Row Bunglow- 37 to 42 Sr.No. Row Bunglow Type Carpet Area Number of (in Sq.Mts) Apartment 1 2BHK 61.33 01 2 2BHK 62.32 04 3 . 2BHK 83.00 01 Daffodil Row Bunglow - 43 to 48 Sr.No. Row Bunglow Type Carpet Area Numberof ( Sq;Mts) Appartment 1 2BHK 62.28 01 2 2BHK 62.32 04 3 2BHK 61.33 01 Daffodil Row Bunglow - 49 to 54 Sr.No. Row Bunglow Type Carpet Area Numberof (Sq.Mts) . Appartment 1 2BHK 61.35 01 2 2BHK 62.32 04 3 2BHK 66.19 01 ~,>-" "7 _" _ . Yf.,;; .' (Dhl'r'OJ't. \iV'CdunJ) " ·S A(1CH r CiA I,OOS/3GQOt .~<\\~ , Authorised Signatarv Aster Row Bunglow- 23 to 30 Sr. No. Row House Type Carpet Area Number of _(in Sq.Mts) Apartment 1 1 BHK 68.02 01 2 1 BHK 59.72 06 3 1 BHK· 64.09 01 Aster Row Bunglow- 31 to 36 Sr.No. Row House Type Carpet Area Number of (in Sq.Mts) Apartment 1 1 BHK 70.70 01 2 1 BHK 59.76 04 3 1 BHK 59.00· 01 Common Facilities and Amenities Sr.No. Row House Type Carpet Area Number (in Sq.Mts) 1 Library 18.90 01 2 Gymnasium 18.90 01 3· Spa Room 28.46 01 4 Changing Room 28.08 01 5 Art Room 01 6 Swimming Pool - 01 7 8 Am_1?hitheater Open Gym, & Chjldren Play Area -- 01 01 9 Sport Court, & Lawns -- 01 18 •... Orchid Villas - 1 to 17 Sr.No. Orchid Villas Type Carpet Area Number (in Sq.Mts) of Villas 1 2BHK+Balcony Area 146.07 01 2 2BHK +Balcony Area 148.41 03 3 2BHK+Balcony Area 143.73· 01 4 2BHK+Balcony Area 142.51 02 5 2BHK+Balcony Area 144.70 01 6 2BHK+Balcony Area 147.63 02 7 2BHK+Balcony Area 148.02 02 8 2BHK+Balcony Area 143.81 02 9 2BHK+Balcony Area 143.05 01 10 2BHK+Balcony Area 143.54 01 11 2BHK+Balcony Area 140.03 01 Yours Faithfully, Signature & Name (IN BLOCK LETTERS)of L.S/Architect (license No ) (Dhkdj 'r, Wakmj) ..e..AAC~~~.~Cf."1 2.0051 36699 . i.;~_t.~;'j_~~,;,:·:~::~q .