umesh bogul orchitect first floor, podmo-vishwo center, old pondit colony, noshik. tel.- 0253 2579667. e.moil - orumeshblO@gmoil.com ARCH TTECTiS CERTtFtcl$E Date:26/A6/2A2O To The "Mfs S. N. Construction Through Partner Shailesh S. Guirathi & Other one Through G.P.A.H M/s. Anuraj Buildcon Partnership Firm Through Partner Shri.Ravi R.Mahajan.", 109,113 TO 116 Presidency, Old Agree Road, Gadkari Chowk, Nashik. Subject: Certificate of Percentage of Completion of Construction Work of "AARADHyA APARTMENfl, the Project situated on the S.NO. 457/1, out of which P.NO. ---Demarcated by its boundaries (latitudeand longitudeof the end points*go"5g'1.G.7!"N,73"49'2L.67"E) On or towards East 467/2 On or towards West 468 On or towards South 15.O M. WIDE D.P. ROAD On or towards North 7.50 M. WIDE ROAD of Division Nashik, Tal- Nashik, Dist Nashik-422011 admeasuring 1909.00 Sq.m. Area being developed by "M/s S. N. Construction Through Partner Shailesh 5. Gujrathi & Other one Through G.p.A.H M/s. Anurai Buildcon Partnership Firm Through Partner Shri. Ravi R Mahajan." Sir, I Ar. UMESH BAGUL have undertaken assignment as Architect certifying Percentage of Completionof ConstructionWorkof the"AARADHYA APARTMENT'the Project,situatedon the s.No. 46713', outof which P.No.--, of Division Nashik, Tal- Nashik, Dist- Nashik- 422ALL admeasuring 1909.00 Sq.m. Area, being developed by "Mfs S. N. Construction through Partner Shailesh S. Gujrathi & Other one, Through G.P.A.H M/s. Anuraj Buildcon partnership Firm through Partner Shri. Ravi R. Mahajan. 1. Following technieal professionals are appointed by owner / promoter :- i. Mr. Umesh Bagulas Architect ii. Mr. Prasanna Bhore as Structural Consultant iii. Mr. Sachin Chaudhary as Site Supervisor Based on Site fnspection, with respect to each of the Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of work done for each of the Wing of the Real Estate Project is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 6> Ar. Umech Brgul Page 1 of 3 cA/93/15997 umesh bogul orchitect first floor, podmo-vishwo center, old pondit colony, noshik. lel.- 0253 2579667. e.moit - orumeshbl0@gmoil.com Table A "AARADHYAAPARTMENT' Sr. No Tasks / Aaivity Percentage of work done {%} t Excavation 100 2 Plinth t00 3 .....number of Podiums N.A. 4 Stilt Floor 100 5 Slabs of super Structure 100 6 lnternalwalls, Internal Plaster, Floorings within Flats / 65 Premises, Doors Windows to each of the Flat / Premises 7. Sanitary Fitting within the Flat / Premises, Electrical 50 Fittings within the Flat / Premises 8 Staircase, Lifts Well and Lobbies at each Floor level 75 connecting Staircase and Lifu, Overhead and Underground Water Tanks 9 The External plumbing and external plaster, elevation , 80 completion of terraces with waterproofing of the Building/ Wing, L0 Installation of lifts, water pumps, Fire Fighting Fitting and 10 Equipment as per CEO NOC, Electrical Fitting to Common Areas, electro, mechanical equipment Compliance to conditions of environment / CRZ NOC, Finishing to entrance lobby / s, Plinth protection , paving to areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certifi cate 6l, Ar. Umesh Begul cA/93/159e7 Page 2 of 3 umesh bogul orchitect first floor, podmo-vishwo cenier, old pondit colony, noshik. tel.- 0253 2579667. e.moil - orumeshbtO@gmoil.com TABTE- B lnternal & External Develooment works in respect of the entire "AAF|ADHYA APARTMENT" S.no. Common areas and Facilities, Proposed ( Percentage of Details Amenities Yes/ No) work done 1.. Internal Roads & Footpaths NO 0 Not Applicable 2. Water supply YES 0 To be obtained from NMC on completion of the proiect 3. Sewerage (chamber, lines, septic YES 60 Chamber, Line & tank, STP) Septic tank 4. Storm Water Drains YES 0 Work yet to start 5. Landscaping & Tree Planting YES 0 Work yet to start 6. Street Lighting NO 0 NA 7. Community Buildings NA 0 NA 8. Treatment and disposal of sewage NO 0 NA and sullage water 9. Solid Waste management & NO 0 NA Disposal 10. Water conservation, rain Water YES o Work yet to start harvestine 11. Energy management NO 0 NA L2. Fire protection and fire safety YES 0 Work yet to start requirements 13. Electrical rneter room, sub-station, YES 0 Work yet to start receiving station L4. Open Parking YES 0 Work yet to start Yours Faithfully Signatr,tpe &-name AR. UMESH BAGUL {License No. CA/93/15997) Ar. Umesh Brgul cA/93/15997 Page 3 of 3