Chaware & Associates Urban Designers, Architects, Environmental Consultants, Town planners, Arbitrators & Valuers FORM 1 ARCHITECTS CERTIFICATE Date: 30/09/2023 To KHC GLOBAL LIMITED 2nd Floor, Gulmohar Status, Above Business Bank, Samarth Nagar, Nashik- 422005 Subject: Certificate of Percentage of Completion of Construction Work of 1 Building of the Project Number PS1600014676 (Only applcab Hari Aakrutl Phase Il having MahaRERA Registratlon Limited. after Project Registration) being Developed by KBC Global Sir as Architect / Llcensed Surveyor of IKuldeep Chaware have undertaken assignment of 1 Building of the Project Hari Aakruti Certifying Percentage of Completion of Construction Work PS1600014676 (Only applicable after Project Phase ll having MahaRERA Registration Number Registration) being Developed by KBC Global Limited. /each Bulding/Wing ot the atoresad Based on the Site Inspection, witlhrespect to the Layout for each of this Certificate, the Percentage of Work Done Real Estate Project, I certify that as on date The the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. of the activity of entire Phase is detailed in Table percentage of work executed with respect to each of B. 1 of 1 Ca Chaware & Associates Architects, Urban Designers Environmental Consultants, Town planners, Arbitrators & Valuers TABLE-A Building: S. No. Tasks / Activity Percentage of Actual Work Done (As on date of the Certificate) (2) 3) 1. Excavation 2 Basements (if any) 100 iums (if any) Plinth Stilt Floor 100 Slab of Super Structure 100 Internal Walls, Internal Plaster, Floorings, Doors, windows 80 within Flats/ Premises Sanitary Fittings within Flats/ Premises 30 Staircases, Lift Wells & Lobbies at each Floor Level 50 Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 90 Completion of Terraces, with waterproofing of the Building/Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings 11 CFO NOC Flectrical Mechanical Equipments, Compliance to conditions of Environment/ CRZ NOC, Finishing to Entrance Lobby/s, Pinth Protection, Paving of Areas appurtenant Building/Wing Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity 1 of 2 Ca Chaware & Associates Architects, Urban Designers, Environmental Consultants, Town planners, Arbitrators & Valuers TABLE-B Common Areas (lnternal & External Development Works) in respect of the Registered Phase/ Project Number- Hard Aakruti Phase 1l S. Common Areas &Facitities Proposed Percentage of Detalls No (Yes/ actual Work NO) (As on date of Certificate) (5) (1) (2) (3) (4 1. Internal Roads &Footpaths Tes B0O 2. Water Supply es 50 Sewerage (Chamber, Lines, Septic Yes 60 Tank, STP) . Strom Water Drains Yes 5. Landscaping &Tree Planting Ver 50 Buildings NA NA 8. Treatment &Disposal of Sewage and Yes 0 Sullage Water 9.Solid Waste Management &Disposal | NA N 10. Water Conservation / Rain Water Yes Harvesting NA 11. EnergyManagement 12. Fire Protection & Fire Safety Yes requireheRoom. Sub-Station, 13. Electrical Yes 14. 0thers Rerreational open space 15.Open Parkin: Yours faithfully. Signature & Name (!N BLOCK LETTERS) of Archite:KNLDEEP CHAWARE License Number Agreed &Acceptec PROPRIETOR CHAWARE &ASSOCUATES Signature Name of: Date: