SHARDUL Regd. No. ARCHITECT AND SINGH AM/86 188-2/5, CE/1072/5 NMC/49/200, C/A 2011/51112 CONSULTING ENGINEERS DESIGN'S Ref. No. FORM 1 Date Date: 04/02/2020 To, Shree Krishna Reality Krishna Valley, Dindori Road, Mhasrul, Nashik-422004 Valley for Construction of Subject: Certificate of Percentage of Completion work of Krishna the Plot bearing S.No. 14/1+2/1+14/1+2/3 4 buildings A+B, C+D, E & F+G Wings, situated on demarcated by its boundaries (latitude and longitude of the end points) S.No. 289 to the to the East, Existing Nala to the North, Part of S.No. 14 to the South, 30Mtr. Wide DP Road District Nashik, PIN 422004 West, of Division Nashik, Village Mhasrul, Taluka Nashik, admeasuring 6850.00 Sq. Mtrs. area being developed by Shree Krishna Reality. Sir, Architect of certifying Percentage of , Ar. V. B. Shardul have undertaken assignment as for Construction of 4 Completion of construction work of the project Krishna Valley of buildings A+B, C+D, E & F+G Wings situated on the Plot bearing S.No. 14/1+2/1+14/1+2/3 Division Nashik, Village Mhasrul, Taluka Nashik, District Nashik, PIN 422004 admeasuring 6850.00 Sq. Mts. area being developed by Shree Krishna Reality. 1. Following technical professionals are appointed by Owner/Promoter: (i) Mr.V. B. Shardul as Architect; (i) Mr. R. N. Singh as Structural Consultant; Based on Site Inspection, with respect to each of the Buildings of the aforesaid Real Estate Project,I certify that as on thedate of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51600013456 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building/Wing and Overall Percentage of the work done with respect to each Building/Wing is detailed in the Table B. 42 Ar. Shardul Vishwakárma CA/2011/51112 Nashik PushpakAppt. New Pandit Colony, Mob.9422255752, Emalilvshardul@yahoo.com Shop. No. 6, Pushpak Appt, Opp. Gopal Park, Old Pandit Colony, Nashik - 422 002. Tel. 2315146 Mob. 94-222-55752, 94-227-47144 E-mail:rksinghnashik@gmail.com, vshardul@yahoo.com Table A KRISHNA VALLEY BUILDING A+B Sr. No. Tasks/ Activity Percentage 100 1 Excavation 1 number of Plinth 100 2 NA 3 0 number of Podiums Stilt Floor 100 100 5 7 number of Slabs ofSuperStructure Internal Walls, Internal Plaster, Floorings within the Flat/ Premises, Doors 100 and Windows to each ofthe Flat/ Premises within the Sanitary Fittings within the Flat / Premises, Electrical Fittings 100 Flat/Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing ofthe Building/Wing 10 Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment/ CRZ NOC,| of areas 100 Finishing to Entrance Lobby/s, Plinth. Protection, Paving to Building/ Wing, Compound Wall and all other| appurtenant requirements as may be required to obtain Occupation / Completion Certificate. Ar. Shardul Vishwaka>ma CA/2011/51112 Nashik Now Pandit Colony, Pushpak Appt. s422255752, Email vshardul@yahoo.com Table A KRISHNA,VALLEY BUILDING C+D Percentage Sr. No. Tasks/Activity 100 1 Excavation 100 2 1 number of Plinth NA 3 0 number of Podiums 100 4 Stilt Floor 100 5 7 number of Slabs of Super Structure Doors 5 Internal Walls, Internal Plaster, Floorings within the Flat/ Premises, 100 and Windows to each of the Flat/ Premises Electrical Fittings within the Sanitary Fittings within the Flat/ Premises, 100 Flat/Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing ofthe Building/Wing 10 Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as Areas, Electro, Mechanical per CFO NOC, Electrical Fittings to CommonEnvironment Equipment, Compliance to conditions of / CRZ NOc, |Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 100 appurtenant to Building Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Ar. Shardul Vishwakarma CA/2011/51112 Pushpak Appt. Naw Pandit Colony, Nashik 5.9422255752, Emalvshardul@yahoo.com Table A KRISHNA VALLEY EWING Sr. No. Tasks Activity Percentage Excavation 100 2 1 number of Plinth 100 0 number of Podiums NA 4 Stilt Floor 100 100 5 6 number of Slabs of Super Structure 6 Internal Wall, Internal Plaster, Floorings within the Flat/ Premises, Doors 100 and Windows to each ofthe Flat/Premises Sanitary Fittings within the Flat/ Premises, Electrical Fittings within the 100 Flat/Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Water Tanks Staircases and Lifts, OverheadandUnderground External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing ofthe Building/ Wing Installation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as 10 per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment/ CRZ NOC, 100 Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas appurtenant to Building/ Wing, Compound Wall and all other requirements as may be required to obtain Occupation/ Completion Certificate. A: Slherdul Vishwakarma GA/2011/51112 Nashik Pandit Colony, Fuahpak Appl. New vshardu@yahoo.com is8 M2804 , kansl Table A KRISHNA VALLEY BUILDING F+G Percentage Tasks/Activity Sr. No. 100 Excavation 100 1 2 1 number of Plinth NA 0 number of Podiums 100 3 100 4 Stilt Floor Structure Slabs of Super 7 number of 5 Floorings within the Flat/Premises, Doors 100 Internal Plaster, 6 Internal Walls, each of the Flat/ Premises and Windows to within the 100 Premises, Electrical Fittings within the Flat / Sanitary Fittings Flat/Premises, Floor level connecting 100 and Lobbies at each Lifts Wells Tanks Staircases, Underground Water Overhead and Staircases and Lifts, Completion of Terraces Elevation, 100 External Plaster, External Plumbing and 9 of the Building/ Wing with Waterproofing as and Equipment Installation of Lifts, Water Pumps, Fire Fighting FittingsElectro, Mechanical 10 Common Areas, Electrical Fittings to CRZ NOC, per CFO NOC, to conditions of Environment / 100 Equipment, Compliance Plinth Protection, Paving of areas Entrance Lobby/s, al other Finishing to Wall and Wing, Compound appurtenant to Building / Completion be required to obtain Occupation requirements as may Certificate. Ar. Shardul Vishwakarma CA/2011/51112 Pushpak Appt. New Pandit Colony, Nashik Mob. 9422255752, Emall vshardul@yahoo.com TABLE-B KRISHNA VALLEY project Internal &External Development Works in Respect ofthe Percentage Proposed Details Common Roads and Facilities, of Work Sr.No. Amenities (Yes/No) done NA 0 Internal Roads and Footpaths No 1 Obtained from NMC Yes 100 2 Water Supply Septic Tank Done Sewerage (Chamber, Lines, Septic Yes 100 3 Tank, STP) NA Storm Water Drains No 4 NA o 0 5 Landscaping and Tree Planting By NMC Yes 100 6 Street Lighting NA Community Buildings No NA Treatment and Disposal of No 8 Water Sewage and Salvage NA Solid Waste Management and No 9 Disposal Done Rain Water Harvesting Conservation and Rain Yes 100 Water 10 Water Harvesting NA No 0 11 Energy Management NMC DC Rules Fire Safety 100 Doneas per 12 Fire protection and Yes Requirements Individual Meters Taken Electrical Meter Room, Sub- Yes 100 13 Station, Receiving Station Yours Faithfully Ar. Shardul Vishwakarma CA/2011/51112 Pushpak Appt. Naw Pandit Colony, Nashik Mob. 9422255752, Emal vshardul@yahoo.com V. B.Shardul Architect