Cell : 9422247125 SAGAR S. SHAH E-mail : er.sagarshah@gmail.com B.E.(Civil) AMIE 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 005 Date : ENGI N EER'S CERTIFICATE (FORM 2) Date:23/09/2017 To, Shree Krishna Reality Krishna Valley, Dindori Road, Mhasrul, Nashik-422004 Subject: Certificate of Cost lncurred for Development of Krishna Valley for Construction of 4 buildings A+B, C+D, E & F+G Wings, situated on the Plot bearing S.No. t0lt+2lL+L4lt+2/3, Nashik, demarcated by its boundaries (latitude and longitude of the end points) S.No. 289 to the North, Part of S.No. 14 to the South, 30Mtr. Wide DP Road to the East, Existing Nala to the West, of Division Nashik, Village Mhasrul, Taluka Nashik, District Nashik, PIN 422004 admeasuring 6850 Sq. Mtrs. area being developed by Shree Krishna Reality. Ref: MahaRERA Registration Number Sir, I Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MAHARERA, being 4 Buildings, A+B, C+D, E & F+G Wings situated on the Plot bearing S.No. t4lL+211,+L4lL+213, Nashik, of Division Nashik, Village Mhasrul, Taluka Nashik, District Nashik, PIN 422004 admeasuring 6850 Sq. Mts. area being developed by Shree Krishna Reality. L Following technical professionals are appointed by Owner / promoter :- (i) Shri VISHWAKARMA B. SHARDUL as L.S. / Architect; (ii) Shri. RAVINDRAKUMAR N. SINGH as Structural Consultant 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity'for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* . appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building of the aforesaid project under reference as Rs. 18,59,50,000/- (tn words Rupees Eighteen Crores Fifty Nine Lakhs Fifty Thousand Only) ( Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. 7,43,80,000/- (Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at Rs. L0,55,7O,000/- (Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A Building called KRISHNA VALLEY CONSISTING 4 BUILDINGS NAMED A+B, C+D, E, F+G WINGS Sr. No Particulars Amounts Total Estimated cost of the buildings -A+8, C+D, E, F+G Wings t Rs. 17,59,50,000/ rs on 23/09 /2077 date of Registration is lost incurred as on 23/09/2017 2 Rs. 7,43,80,O00/ based on the Estimated cost) ffork done in Percentage 3 40% as Percentage of the estimated cost) ]alance Cost to be lncurred 4 Rs. 10,55,70,000/- Based on Estimated Cost) lost lncurred on Additional /Extra ltems as on 23/Og/20t7 not 5 Nil ncluded in the Estimated Cost (Annexure A) e\$- Cell : 9422247125 SAGAR S. SHAH E-mail : er.sagarshah@gmail.com B.E.(Civil) AMIE 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 005 Date : TABLE B Sr. No. Particulars Amounts 1 Total Estimated cost of lnternal & External Development Works ncluding amenities and Facilities in the layout as on 23/09120L7 date Nil >f Registration is 2 lost incurred as on 23/09/2077 Nil based on the Estimated cost) 3 ffork done in Percentage Nil as Percentage of the estimated cost) 4 lalance Cost to be lncurred Nil Based on Estimated Cost) 5 lost lncurred on Additional/Extra ltems Nil as on 23/09/20t7 not included in the Estimated Cost (Annexure A) Yours Faithfully d-\. ER. SAGAR S. SHAH Signature of Engineer x Note L. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra /Additional ltems executed with Cost (Which were not parts of the original Estimate of Total Cost) NtL