o Vijaya Consultants BUILDING CONSULTING ENGINEERS PLANNERS 10, SIDDHI PARK, NEW PANDIT COIjONY NASHIK. a Ph.: (O) 257a602, Mob. : 9822020644. STRUCTURAL Email :- ashokjamdar@yahoo.com CONSULTANTS ASHOK JAMDAR FORM 1 certificate No. 0017 / 201.8 CERTIFICATE Date:28thAugust, 2018 To, Shri NaryanLabhuSarode Plot No. 9, PandurangNiwas, Sinhastha Nagar, Bhadrapad Sector, CIDCO, Nashik - 422009 Subject: Certificate of Percentage of Completion of Construction Work of Vastu park situated on the Plot bearing Gat No. 63lLA, Plot No.31+32 demarcated by its boundaries plot No. 30 to the North,Plot No. 33 to the South,12 Mtr Wide Road to the East,plot No. 21 to 23 to the West of Division Nashik,Village Chunchale, Taluka Nashik, District Nashik, ptN - 42201,0 admeasuring 555 Sq. Mtrs. Area being developed by Shri Narayan LabhuSarode. Sir, l,Er. Ashok N. Jamdarhas undertaken assignment as Licensed Engineer of certifying percentage ofCompletion of Construction Work of the Vastu Park Building situated on the plot bearing Gat No.53/14, Plot No.31+32of Division Nashik,Village Chunchale, Taluka Nashik, District Nashik, ptN - 4220L0 admeasuring 556 Sq. Mtrs. Area being developed by Shri Narayan LabhuSarode. 1. Following technical professionals are appointed by owner / promoter:- (i) Shri Ashok N. Jamdar as Licensed Engineer; (ii) Shri Ashok N, Jamdar as Structural Consultant Based on Site lnspection, with respect to the Building of the aforesaid Real Estate project, I certify that as on the date of this certificate, the Percentage of Work done for the building of the Real Estate Project as registered vide number P51600013305 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building and Overall Percentage of the work done with respect to each Building is detailed in the Table B. / Table A Sr.No. Tasks / Activity Percentage 1. Excavation 100 2 L number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 0 5 4 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / premises, Doors 100 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 1_00 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at eachFloor level connecting L00 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster,Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wine 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 100 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. / I TABLE - B lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/wo) done 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 Applied to NMC 3 Sewerage (Chamber, Lines,Septic Tank, STP) Yes 0 Only Septic Tank Done 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting No 0 NA 7 Community Buildings No 0 NA 8 Treatment and Disposal of 0 No NA Sewage and Salvage Water 9 Solid Waste Management and No 0 NA Disposal 10 Water Conservation and Rain Only Rain Water Harvesting Yes 0 Water Harvesting Done 11 Energy Management No 0 NA t2 Fire protection and Fire Safety 0 No NA Req uirements r3 Electrical Meter Room, Sub- No separate room for Yes 0 Station, Receiving Station Electrical Meter ER. ASHOK N. JAMDAR