1 SAGAR$. SH&H B.E.(Civil) M.l.E.,F.l.V. Cell : 9422247125 F "27433 E-mail : er.sagarshah@gmail.com r Approved Valuer r Gonsulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 005 FORM - 2 I ENGINEER'S CERTIFICATE Date: tBlOTlz01rg To, Monika Constructions Shop No. 3 & 4, Rajkamal Residency, Opposite Burkule Lawns, Ashwin Nagar, CIDCO, Nashik - 422009 Subject: Certificate of Cost lncurred for Development of SHIV PRIDE for Construction Work of 1 Building situated on Plot No. 15 + 17 bearing Survey No. 330/1 to7l2l3 demarcated by its boundaries (latitude and longitude of the end points) 9 Meter Road to the North, Open Space to the South, 6 Meter Road to the East, Plot No. 18 to the West of Division Nashik, t Village Pathardi, Taluka Nashik, District Nashik, PIN 422010 admeasuring 690.00 Sq. Mtrs. Area being developed by Monika Constructions. Ref: MAHARERA Registration Number P51600013284. Sir, l, Er. Sagar 5. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project registered under RERA, being 1 Building named SHIV PRIDE for Construction Work of 1 Building, situated on the Plot No. tG + t7 bearing Survey No. 330/1 to7l2l3, of Division Nashik, Village Pathardi, Taluka Nashik, District Nashik, PIN 422010 admeasuring 590.00 Sq. Mtrs. Area being developed by Monika Constructions. I Foltowing technical professionals are appointed by Owner / Promoter:- (i) Mr. Ashok N. Jamdar as Licenced Engineer; (ii) Mr. Ashok N. Jamdar as Structural Consultant t t 1. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings plans made/ available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost t of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the building SHIV PRTDE of the aforesaid project under reference as T 2,75,5O,OOOI- (ln words Rupees Two Crores Seventy Five takhs And Fifty Thousand Only| (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Municipa! Apartment being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred till date is calculated at { 2,75,50,000/- (Tota! of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of I Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation is estimated at Nil (Tota! of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below: s onrultlng -12 \lalucr * F -2i{33 t N 4S t{ I TABLE -A SHIV PRIDE Sr. No. Particulars Amounts L Total Estimated cost of the building/wing as on LLIOS/2OLI { 2,75,50,000 Cost lncurred as on L8/O7/20L9 2 (based on the Estimated cost) { 2,75,50,000 Work done in Percentage 3 LOO% (as Percentage of the estimated cost) Balance Cost to be lncurred 4 NIL t (Based on Estimated Cost) Cost lncurred on Additional /Extra ltems as on 18/07/2OL9 not 5 NIL included ln the Estimated Cost (Annexure A) TABLE - B Building called SHIV PRIDE Sr. No. Particulars Amounts Tota! Estimated cost of the lnterna! and Externa! Development L Works including amenities and Facilities in the layout as on NIL LLl08l20L7 t 2 Cost incurred as on L8/O7 /20L9 (based on the Estimated cost) NIL 3 Work done in Percentage (as Percentage of the estimated cost) NIL 4 Balance Cost to be lncurred (Based on Estimated Cost) NIL 5 Cost lncurred on Additional / Extra ltems as on L8/07120L9 not NIL included in the Estimated Cost (Annexure A) hRS. su Iriri g "1" Va lu ar ,t. b: l't\ t t Yours Faithfully GNi\ * *- TPPI ER. SAGAR S. SHAH AS * Note t t. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project wil! result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra /Additional ltems executed with Cost (Which were not parts of the original Estimate of Total Cost) t NIL t