o Vijaya Consultants BUILDING CONSULTING ENG!NEERS PLANNERS 10, SIOOHI PARK, NEW PANDIT COLONY, NASHIK. o Ph.: (O) 2574602, Mob. : 98220 20644 STRUCTURAL Email - ashokiamdar@yahoo.com : CONSULTANTS ASHOK JAMOAR FORM 1 CERTIFICATE Date:18/0712OL9 Ce rtif icate No. OL25/ 2021, To, Monika Constructions Shop No. 3 & 4, Rajkamal Residency, Opposite Burkule Lawns, Ashwin Nagar, CIDCO, Nashik- 422OO9 Subject: Certificate of Percentage of Completion work of building nameSHlV PRlDEfor Construction Work of L Buildingsituated on Plot No. 15 + 17 bearing Survey No.330/1 to Tl2l3demarcated by its boundaries (latitude and longitude of the end points) 9 Meter Road to the North,Open Space to the South, 6 Meter Road to the East,Plot No. 18 to the West of Division Nashik,Village Pathardi, Taluka Nashik, District Nashik, PIN 422010 admeasuring 690.00 Sq. Mtrs. Area being developed by Monika Constructions. Sir, l,Er. Ashok Jamdar have undertaken assignment as Licenced Engineer of certifying Percentage of Completion of construction work of the projectSHlV PRlDEfor Construction Work of 1 Building,situated on the Plot No. LG + L7 bearing Survey. 33OlL to 71213, of Division Nashik,Village Pathardi, Taluka Nashik, District Nashik, PIN 422010 admeasuring 690.00 Sq. Mtrs. Area being developed by Monika Constructions. 1. Following technical professionals are appointed by Owner / Promoter:- (i) Shri Ashok Jamdar as Licenced Engineer ; (ii) Shri Ashok Jamdar as Structural Consultant ; Based on Site lnspection, with respect to each of the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51600013284 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A SHIV PR!DE Sr.No. Tasks / Activity Percentage 7 Excavation 100 2 1 number of Basement &Plinth 100 3 0 number of Podiums 0 4 l Stilt Floor 100 5 5 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 100 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 100 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 100 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABTE -B SHIV PRIDE lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done t lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 100 Obtained From NMC Sewerage (Chamber, Lines,Septic 3 Yes 100 Septic Tank done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 100 By NMC 7 Community Buildings No 0 NA Treatment and Disposal of 8 No 0 NA Sewage and Salvage Water Solid Waste Management and 9 No 0 NA Disposal Water Conservation and Rain Rain Water Harvesting done 10 No 100 Water Harvesting 7L Energy Management No 0 NA 12 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub- L00 lndividual Meters taken Yes Station, Receiving Station Yours Er. Ashok Jamdar Engineer / L.S. Er. Ashok Jamdar R.Ho - PELR121 Lb.No _ 134199