l.... ?' Consultanttng Engineers. Er. Rajendra g. Birla R.C.C.ConsuitaOl • M Tech SI""'"'" (II T Bomb •• 1 ;:7 Steel Design Consuham • 8 E CiYiliHons.I /"" /) Cost Incurred on Additional IBxlra Items Not Applicable ason not includcdinthe Esurnated Cost (Annexul'oA) _;._:__-- TAOI.F.B (to be prepared for the entire register!'" phase of the Real Estate Projecu Sr. No. Pa rticu lara Amounts (1) (2) (3) ----- 1 Total Estimated cost of the- Internal andExternal Rs. 760000001- Development Works including amemtresand Facilities in the layout ason30107/2017date of Rcgietration is (1) (2) ( 2 Cost incurred as on (based on the Rs.50+ Estimated cost). 3 Work done in Percentage 08.00% (as Percentage of the estimated cost). 4 Balance Cost to be lncurred