AMOL SHASHIKANT AHIRRAO CIVIL ENGINEERS AND CONTRACTORS Flat No. 04, Yatin Appt, Gpp. S T Divisional Office, N. D. Patel Road, Nashik-1 Contact +91 942 396 3054 mail: -ahirraobuildcon@gmail.com FORM-2A [see Maha-RERA order NO.5 of 2018] ENGINEER'S CERTIFICATE FOR QUATTIY ASSURANCE (site supervisor's certificate) (To be uploaded quarterly) To, The M/s Ahirrao Buildcon Pvt. Ltd. Flat No. 04, Yatin Apartment, N.D. Patel Road, Nashik 422001. Quality Assurance Certificate (Certificate No. ABPL 01/2018 for the ending July 17 - Mar 19) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work of Swanandi Blossom No. of Building 01 of the Project situated on the plot bearing SUIVeyNo 96/3 Final plot no. 1+2 demarcated by its boundaries Colony Road to the North Open Space to the East Colony Road to the West Adj. Sr. No. 95 to the South to the west of Division Nashik Village Nashik Taluka Nashik District Nashik PIN 422013 admeasuring 550.31 Sq. Mtr. Area being developed by M/s Ahirrao Buildcon Pvt. Ltd. Reference: Maha-RERA Registration No. PS16oo012647 Sir, I / We Arnol Shashikant Ahirrao have undertaken an assignment of supervision of this real estate project. Our Responsibility: To carry out the work in accordance with the development approved permission and as plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorized laboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. Material Testing: 1/ We, have applied following mandatory checks on the basic materials, used in the construction. i) Cement- It has been tested for its fineness, soundness, setting time, compressive strength etc. as per IS code 3535:1986 or as per other relevant IS/85/NBC code, or per industry standards and its results are within the permissible limits. ii) Coarse Aggregate - It has been tested, for deleterious materials, clay lumps, crushing value, impact value as per IS 2430:1986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. iii) Bricks/ Blocks - They have been tested for water absorption, crushing strength etc. as per IS 5454:1978 or as per other relevant IS/Ss/NBC code or as per industry standards and its results are within permissible limits. iv) Concrete / Ready-mix Concrete - It has been tested for compressive strength for various periods as 456:2000 and IS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v) Steel for Concrete - It has been tested as code or as per IS 2062:2011 or as per other relevant Is/Bs/NBC per industry standards for ten' e strength, elongation and gauge length etc. and its results are within permissible limits. vi) Testing of Other Materials - Other materials like sand, crushed sand, floor tiles, fixtures and fittings, pipes and sanitary fittings etc. (List out all items) used in this project conform to relevant IS/BS/NBC code or as per standards laid down by the industry for a particular material. 2. Workmanship: - I / we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Electrical Materials and Workmanship: - Works of all the electrical wiring/ connections / lift installation electrical installations have been carried out under authorized /registered electrical engineer and its records has been maintained. The materials used conform to the relevant 1.S/ B.S/ National Building codes or as per industry standards. 4. Structural Engineer: - Promoters has engaged structural engineer Mr. Amol Shashikant Ahirrao having Licenses No. -NA-- having OfficeNO.+91253 250 9600 CellNo. +919423963054 The structural design ofbuilding(s) in this project has been done under his supervision. He has checked the soil report before laying PCCfor foundation in consultation with soil consultant. The formwork and concrete mix design have been done as per Is 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITYand SAFETYhave been kept on record. 5. Preservation of Records: - Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision oflaw. 6. Please specifymaterials or any other item of work which were not conforming to the standard specifications and which were not rejected. i) --NA-- _ ii) _ ili) ___ Yours Fait Signature of Engineer (Site Supervisor) Name: Amol Shashikant Ahirrao License No. (if any) -NA- Phone No. +91942 396 3054 Place: Nashik