BHUSHAN HARESHWAR SARDA coNsu Lt NG crvr L ENGTBNEEl;lvrLl Flat No.7. Sancheti heishts Canada Corner, Nashik_422005. Mob :9822010744. I See Resulation 3 I 26102120ts ENGINEER'S CERTIFICATE (To be submitted the time of Registration of ongoing and for withdrawal of Money from designated Account - project wise) To, Nirmiti Buildtech partnership fiim through its partner Shri. yashpal Tatiya of Nashik. subiect:- certificate of cost Incurred for Development of "TowN seuARRE - RE5IDENTIAL" project for construction of Residential Building of the First Phase (Maha RERA Registration Number p51600012559) situated on the plot bearing Survey No. 108/8, Nashik shivar & crs No. 0138, Final plot No. boundaries (latitude and longitude of the end points) to the North sampat Dhotre plot to the -- demarcated by its south lzM wide road to the East Remaining Part of s.No.1o8 to the west 3oM wide Road of Div. Nashik village Nashitg Tal. Nashik, Dist Nashilg PIN 422003, Admeasuring 3637.10 sq,mt area being developed by Nirmiti Buildtech partnership firm through its partner's 1. shri. yashpat Abhay Tatiya 2. Deepak Balasaheb Dharrao. Ref r MahaRERA Registration Number p51600012559 5ir, I Mr. Bhushan Sarda have undertaken assignment of certifying Estimated cost for the real estate [TOWN SeUARRE - RESIDENTIALI Project for Construction of Commercial Building of the First Phase (Maha RERA Registration Number P51500012559) situated on the plot bearing Survey No. 108/8, Nashik Shivar & CTS No. 6138, Finat ptot No. --- demarcated by its boundaries (latitude and longitude of the end points) to the North Sampat Dhotre plot to the South 12M wide road to the East Remaining Part of S.No.108 to the West 30M wide Road of Div. Nashik Village Nashik, Tal. Nashik, Dist Nashik, PIN 422003, Admeasuring 3637.10 Sq.mt area being developed by Nirmiti Buildtech partnership firm through its partner 1. Shri. Yashpal Abhay Tatiya 2. Deepak Balasaheb Dharrao. 1. Following technical professionals are appointed by Owner/Promoter - (i) Shri Sagar Kabre as Architect (ii) Shri Milind Rathias Structural consultant (iii) M/s shri/smt as MEP Consultant (iv) M/s Shri/Smt as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEp & Allied work, of the buildings of the project. Our estimated cost calculations are based on the drawings / plans made available to us for the project under reference by the developer and Developer & Consultants & The appointed by* Schedule of items and quantity for the entire work as calculated by --- quantity surveyor Developers/ Engineer, and the Assumption of the cost of material, labour & other inputs made by Developer, & the site inspection carried out by us. 3. We estimate total estimated cost of completion of the buildings of the aforesaid proiect under reference as Rs. 6,3O,OO,qrO/- (Total of Table A & B). The Estimated total cost of project is with reference to the civil, MEP & allied works required to be completed for the purpose of obtaining occupation certificate & completion certificate for jurisdiction the the buildings from Nashik Municipal Corpotation, being the planning Authority under whose aforesaid project is being implemented. 4- The estimated Cost incurred till date is calculated at Rs. 3,15,OO,OOO/ the amount of estimated cost incurred is calculated on the base of amount of total estimated cost. subject project to obtain 5. The balance cost ol Comptetion of the civil, MEP & allied works of the building of the occuDation certificate and completion certificate from Nashik Municipal corporation is estimate at Rs' 3,15,(X),000/- 6. I certify that the cost of the civil, MEP & Allied work for the aforesaid project as completed on the date of the certificate is as given in the table A & B below. Table A Building called Town Squarre' RESIDENTIAL (To be prepared separately for each building /wing of the Real Estate Project) Particulars Amount Sr, No. of 63,00o,000 7 Total Estimated cost of the commercial building wing as on 31/07/2017 dated registration is 31,500,00o 2 cost incurred as on 31/12/2018 (based on the estimated cost) 50.o0% 3 Work done in Percentage (as percentage of the estimated cost) 31,500,000 4 Balance Cost to be Incurred (based on estimated cost) Cost Incurred on Additional/Extra ltems as on ------ On not included in the Estimated Cost (Annexure A) Table B (To be prepared separately for each building /wing of the Real Estate Project) Sr, No. Particulars Amount 1 Total Estimated Cost of the Internal and External Development works including amenities and facilities in the layout as on 3!lO7l2gl7 daled of registration is 2 Cost incurred as on 31/12/2018 (based on the estimated cost) Work done in Percentage (as percentage of the estimated cost) 0.00% Balance cost to be Incurred (based on estimated cost) Ntt cost Incurred on Additional/Extra ltems as on -------- on not included in the Estimated Cost(Annexure A) lls,rnru x. SA'?.DA Propriei.' (Licence No. per d rawings approved from time to time Note :- 1)The scope of work is to completed entire real estate project as so as to obtain occupation certificate /Completion certificate' -) 2) Quantity Survey can be done by office of engineer can be done by an independent Quantity surveyor, whose certificate of quantity calculated can be relied upon by the engineer. In case of independent quantity surveyor place marked and in case quantity are berng being appointed by Developer, the name has to be mentioned at the who is responsible for the calculated by office of Engineer the name of the person in the office of engineer, quantity calculated should be mentioned at the plane marked' and machinery required to carry out entrre worK' 3) The estimated cost includes all labour, material, equipment for the Development of the real estate project will 4) As this is an estimated cost, any Div' in quantity required result amendment of the cost incurred /to be incurred' 5) All Components of work with specification are indicative and not exhaustive' Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total cost) Ntt