FORM 1 ISee Regulation 3] ARCHITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/0612018 To, The Nirmit Buildtech, Nashik Subject : Certificate of Percentage of Completion of Construction Work of Residential phase Building of the Phase I of the project . TOWN SQUARRE -Re&fderr#At,, [MahaRERA Registration Number P51600012559 ] situated on the Plot bearing CTS No.6138/ Survey No. 1Og/8, demarcated by its boundaries Sampat Dhotre's Plot to the North, 12 mtr wide road to the South, S.No.108 remaining part to the East, 30 mtr Peth Road to the West of Division Nashik, Village Nashik, District Nashik PIN - 422003 admeasuring 3637.10 sq.mts. area being developed by Land owner Vinod chhajed & others being deveroped by Nirmiti Buildtech. Sir, . I Sagar Kabre, Partner of Kabre Consultants, have undertaken assignment as Architect of certifying Percentage of completion of construction work of the RESIDENTIAL Building phase llof project ,, TOWN SQUARRE" [MahaRERA Registration Number P51600012559 situated on the plot bearing ] CTS No. 6138/ Survey No. 108/8, demarcated by its boundaries Sampat Dhotre's Plot to the North, .12 mtr wide road to the South, S.No.108 remaining part to the East, 30 mtr Peth Road to the West of Division Nashik, Village Nashik, District Nashik PIN - 422003 admeasuring 3637.10 sq.mts. area being developed by Land Owner Vinod Chhajed & others being developed by Nirmiti Buildtech. 1. Following technical professionals are appointed by Owner / Promoter :- (r) Shri. Sagar Kabre, Partner Kabre consultants as Architect; (tt) Shri. Milind Rathi as Structural Consultant (iv) Shri Bhushan Sarda as Engineer Based on Site lnspection, with respect to each of the BuildingMing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingruing of the Real Estate Project as registered vide number P51600012559 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building Part_A (A Wing Ftat no- 617 t8t9 I 12t 1 3t 1 4t 1 5t 18t 19t20 I 21 t23t24t25t261 27 t28t29 t 3Ol ( B win g F lat no- 9/1 0/{ 5/1 6 t21 t22t26t2t t2$t29ls Sr. No. Tasks /Activity Percentage of work done (1) (2) (s) 1. Excavation N.A. 2. 0 number of Basement(s) and Plinth 3. 1 number of Podiums 0% 4. Stilt Floor N.A. 5. 5 number of Slabs of Super Structure 90% 6. lnternal Walls, lnternal Plaster, Floorings within 40% Flats/Premises, Doors and Windows to each of the FlaVPremises. 7. Sanitary Fittings within the FlaUPremises, 10% Electrical Fittings within the FlaUPremises. 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the BuildingA//ing. 10. lnstallation of lifts, water pumps, Fire Fighting O% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to condi- tions of envlronment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAffing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE.A Building Part_B (A Wing Flat no-112131415110111 116117 l22l Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. Excavation 50o/o 2. 0 number of Basement(s) and Plinth 3. 1 number of Podiums 0% 4. Stilt Floor N.A. 5. 6 number of Slabs of Super Structure 50o/o 6. lnternal Walls, lnternal Plaster, Floorings within 5Oo/o Flats/Premises, Doors and Windows to each of the FlaVPremises. 7. Sanitary Fittings within the FlaUPremises, 30Yo Electrical Fittings within the FlaUPremises. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, 30% elevation, completion of terraces with waterproofing of the BuildingA/Uing. 10. lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to condi- tions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAl/ing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE.A Bu ilding Part_C ( B Wi ng Flat no-l l2l 5161 1 1 n A 17 n8l23l24l Sr. No. Tasks iActivity Percentage of work done (1) (2) (3) 1. Excavation 0% 2. 0 number of Basement(s) and Plinth 3. 1 number of Podiums 0% 4. Stilt Floor N.A. 5. 6 number of Slabs of Super Structure 0% 6. lnternal Walls, lnternal Plaster, Floorings within 0% Flats/Premises, Doors and Windows to each of the FlaUPremises. 7. Sanitary Fittings within the FlaUPremises, a% Electrical Fittings within the FlaUPremises. ,8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the BuildingA//ing. 10. lnstallation of lifts, water pumps, FireFighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to condi- tions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingAl/ing, Compound Wall and all other requirements as may be required to obtain Occupation / Com pletion Certificate. TABLE.A Building Part_D (B Wing Flat no-3/417181131141191201251 Sr. No. Tasks /Activity Percentage of work done (1) (2) (3) 1. Excavation 0% 2. 0 number of Basement(s) and Plinth 3. 1 number of Podiums 0% 4. Stilt Floor N.A. 5. 6 number of Slabs of Super Structure 0% 6. lnternal Walls, lnternal Plaster, Floorings within 0o/o Flats/Premises, Doors and Windows to each of the FlaVPremises. 7. Sanitary Fittings within the FlaUPremises, 0% Electrical Fittings within the FlaVPremises. 8. Staircases, Lifts Wells and Lobbies at each Floor 0% level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 9. The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the BuildingA//ing. 10. lnstallation of lifts, water pumps, Fire Fighting 0% Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to condi- tions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingA//ing, Compound Wall and all other requirements as may be required to obtain Occupation / Com pletion Certificate. TABLE.B lnternal and External Development Works in respect of the entire Registered Phase. S.No. Common areas Proposed Percentage of Details and Facilities, (Yes/No) Work done Amenities (1) (2) (s) (4) (5) 1. lnternal Roads & Footh-paths. No 2. Water Supply Yes Oo/o 3. Sewarage (chamber, lines, Septic Tank, STP). Yes 5Oo/o 4. Storm Water Drains 5. Landscaping& Tree Planting. Yes 0o/o 6. Street Lighting No 7. Community Buildings No 8. Treatment and disposal of No sewage and sullage water. 9. Solid Waste management & Disposal. No 10. Water conservation, Rain water harvesting. Yes 0o/o 11. Energy management No 12. Fire protection and Fire Yes jYo Safety requirements 13. Electrical meter room, sub- No Station, receiving station. 14. Others (Option to Add more). Yours Faithfully, \ , - .'- -'\ 1' Ar.Sagar Kabre. Partner, Kabre Consultants. Architect (License No.Ctu2000/25830.) KABRH CON$ULTANTS A rchiteets tnteriar D" sig ners S Ir6, i.?it ,,.,.,r iil,,.i+. !lrc."i Crrc,t: Ir./rD.tI Rca1, I'l:.:lri,.r i rrh :319A;7